Tue Jun 22 13:01:19 2021, NH, AIDA Data on lustre
|
The following runs are now copied to lustre
If necessary they can be removed from AIDA HDDs for space.
There are also spare HDDs that can (and should) be swapped for the current ones
|
Fri Apr 16 00:47:36 2021, OH-ML, AIDA DAQ Reset
|
1:18 (CET) No rate in AIDA 07.
Oscar did a AIDA DAQ reset and a quick wide check.
(Power cycle |
Sat Apr 24 03:13:05 2021, ML, AIDA DAQ Reset
|
AIDA PC crashe completely at ~3:30am CET.
Tom was called and he Restarted the AIDA system at ~4am with Run 52.
Not sure what cause the crash but AnyDesk remote connection was suddenly lost and once reconnected all Terminal sessions were gone. |
Tue Feb 1 15:00:28 2022, NH, AIDA CentOS 7 Startup
|
Starting up AIDA on CentOS 7 to confirm things work (based on some CARME experience)
NFS settings:
|
Mon Oct 28 17:02:11 2019, TD, AIDA @ DESPEC cable length estimates
|
AIDA snout length 37cm (from end of AIDA snout support assembly)
downstream scintillator (assembly depth 1cm) 36cm
|
Wed May 4 16:50:04 2022, NH, AIDA 4th May 
|
bPlas has been mostly cabled in now
Reseat LAN cable (AIDA Switch -> AIDA-3) and reachieve 1 gbit/s speed as needed.
|
Wed Apr 27 15:47:46 2022, NH, HA, SA, CJ, AIDA 27 Apr 22 7x
|
Remount snout in S4 (photos to come)
Alignment with DEGAS OK but a bit short... DEGAS platform will be brought 31 mm closer to AIDA by rail adjustment
|
Sat May 1 08:45:19 2021, TD, AIDA 24cm x 8cm DSSSD + triPlast assembly for S496 12x
|
Photos provided by Nic Hubbard and Helena Albers from the assembly of 2x triPlast
plus 2x MSL type BB18(DS)-1000 24cm x 8cm detector assembly - attachments 1-3.
|
Mon Dec 16 14:48:02 2019, NH TD, AIDA 16.12.19    
|
DSSD Snout was reassembled to install the second bPlast (downstream)
(fig 1)
|
Tue Aug 13 09:17:02 2019, NH, AIDA 12/08/2019
|
The other 6 FEEs were powered on one at a time to check no issues. None found.
All 12 FEEs plugged back into the PSU.
Note: The FEE temperatures reported on Friday were before a Reset/Setup of the DAQ, which means the ASICs run very fast and the hence run hotter. |
Mon Jul 1 09:42:16 2019, NH, AIDA - 01/07/2019
|
Water is still off.
Checked dewpoint sensor still flashing red light (indicating an error). Pipes warmed. Not what I expected. Possible fault?
I checked S4's ambient temp/humidity with a home-brought sensor: Reports 27 C/50% RH (Dew Point = 16 C) |
Tue Jun 11 20:20:36 2024, TD, ADC data rates from 09.00 11.6.24
|
Per NH
"From ELOG (assuming times accurateish)
|
Fri Mar 22 14:31:24 2019, NH, A few more setup notes I forgot   
|
Extra FEE information:
HV braid (0 V) goes into FEE10 (beam left) with LK1 jumper
HV core (-160 V) goes into FEE09 (top) |
Sat Dec 7 02:39:02 2019, DK, NH et al., 34Si Fragments PID   
|
See attached
Tentative PID (DK) as attachment #3
|
Wed Jun 1 08:00:18 2022, TD, 2xDSSSDs spectra layouts
|
Spectra layouts for 2x DSSSDs can be found in directory ~/LayOut/2xDSSSDs |
Fri May 13 00:50:16 2022, ML, 2h-Shift Checks  
|
All seems ok (apart for my virgin network connection usually quite reliable but not so tonight !?!).
Statistics seems ok.
Temperatures appears stable |
Fri May 13 02:56:36 2022, ML, 2h-Shift Checks  
|
All seemnormal on AIDA side.
Stats as before
Temperatures stable |
Fri May 13 04:45:23 2022, ML, 2h-Shift Checks  
|
AIDA is running ok. Note that, in the last hour or so, the rate of implant in DSSD1 is back to higher rate ~10 Hzto 15 Hz as at the beginning of this
shift.
Stats seems ok |
Fri May 13 06:47:33 2022, ML, 2h-Shift Checks  
|
It has been a quiet night. AIDA has been stable.
Stats appears stable appear
Temperature also stable |
Fri May 13 23:37:59 2022, ML, 2h-Shift Checks   
|
Took over remotely from CB about an hour ago
At 0h40 (CET):
Stats still ok - attach 1
Leakage still OK - Attach 2
Temps
- attach 3
Grafana OK
UCESB rates ok - attach 5
System-wide checks: aida09 fails clock (1), aida02 06 09 10 13 fail ADC calibration,
all pass WR |