AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DESPEC, Page 34 of 37  ELOG logo
ID Date Author Subjectdown Text Attachments
  646   Sun Jun 9 22:49:56 2024 TD23:00-07:00 Monday 9 June
23.47 DSSSD bias & leakage current OK - attachments
1-2
 27x 
  267   Fri Apr 23 15:13:28 2021 DSJ23 April 16.00-20.00 shift16:00 taking over from Muneerah

16:15 - temp, ucesb, database,
stats etc. look ok.
 6x 
  259   Wed Apr 21 23:05:39 2021 CA22nd April 00:00 - 08:0000:07 stats/ucesb/DB checks all ok

00:30 all system wide checks ok *except*
 16x 
  587   Mon Apr 22 11:43:55 2024 TD21-22.4.24 overnight MIDASsort online sort
Attachment 1 - per DSSSD LEC e_p versus e_n
(20keV/channel)
 7x 
  250   Mon Apr 19 23:01:02 2021 OH20th April 00:00-08:0023:52 Noticed AIDA07 has dropped out of the
merger and is producing no statistics
      Powercycling to recover
 17x 
  599   Tue Apr 23 19:23:42 2024 PP20:30 checksAll looks good.

Screenshots attached.
 8x 
  720   Wed Oct 15 09:41:24 2025 JB, GB, MP207Bi source threshold tests
We have dismounted the AIDA stack and bPlast
and realigned the cables so that they can
 IMG_5796.jpgIMG_5797.jpgIMG_5798.jpg 
  721   Thu Oct 23 12:22:31 2025 JB, GB, MP, AM, NH207Bi source threshold tests
> We have dismounted the AIDA stack and bPlast
and realigned the cables so that they can
 8x 
  723   Fri Oct 24 10:31:59 2025 JB, GB, MP, AM, NH207Bi source threshold tests> > 
> > We have dismounted the AIDA stack and
bPlast and realigned the cables so that they
 6x 
  724   Fri Oct 24 12:29:02 2025 JB, GB, MP, AM, NH207Bi source threshold tests> > > 
> > > We have dismounted the AIDA stack and
bPlast and realigned the cables so that they
 11x 
  734   Wed Oct 29 14:11:01 2025 JB, MP207Bi source test - data taking15:10 MP entered and check the water pressure
OK.
15:10 DSSSDs biased - OK.
 7x 
  741   Thu Nov 6 12:58:09 2025 NH207Bi source test - data takingRestart AIDA

aida06 took three attempts to boot today
 6x 
  742   Fri Nov 7 10:47:29 2025 MP207Bi source test - data takingDAQ stopped at ~17.30 due to anydesk failure

  
  740   Wed Nov 5 13:23:38 2025 JB, MP207Bi source test - FWHM tests14:10 started up the DAQ. HV and TEMPS OK.

Peak threshold with 1V pulser measured at
 8x 
  99   Wed Nov 20 20:36:14 2019 CA, CB, DK, NH20/21 November Night Shift21:35 (NH) - A few merger timestamp errors
were appearing - Decided to powercycle all
FEE64s, all checks OK.
 17x 
  603   Wed Apr 24 18:44:05 2024 PP19:30 checksAll seems smooth.

Screenshots attached.
 8x 
  98   Tue Nov 19 21:22:06 2019 CA, CB, DK, NH19/20 November 2019 - overnight shift19 November

Waiting for 40Ar beam to be delivered for
 15x 
  330   Wed May 19 09:12:52 2021 Muneerah, Betool, LS17th May 00:00-12:00Auther: Muneerah and Betool
02:00 The dead time have been checked every
30 min from the start of the shift, it seemes
 17x 
  108   Wed Dec 18 02:44:27 2019 NH17.12.19, 18.12.19 Beam: 238U (850 MeV/u)
Fragment: 168Re
 7x 
  602   Wed Apr 24 15:37:59 2024 PP16:00-00:00 shift Wednesday 24 AprilAll seems OK.

Screenshots attached.
 8x 
ELOG V3.1.3-7933898