Entry  Fri Apr 16 23:13:57 2021, CA, MA, BA, Saturday 16th 00:00 - 08:00  14x
00:05 DESPEC tuning beam, changing spill length

00:21 DAQ continues ok
Entry  Wed Mar 11 16:29:17 2020, CA, LS, TD, slow comparator threshold comparison 100keV_stats.png110keVStats.png120kevstats.png80kevDSSD2.png
17.29 good event statistics for slow comparator threshold at 100 keV (0xa) - attachment 1

17.36 good event statistics for slow comparator threshold at 110 keV (0xb) - attachment 2
Entry  Sun Mar 15 06:45:00 2020, CA, LS, CG, Sunday 15th March 08:00 - 24:00 35x
ASIC settings 2019Oct31-13.24.23
     slow comparator 0xa
Entry  Sun Mar 7 07:23:26 2021, CA, LS, March 7th  14x
08:00 ASIC settings 2019Dec19-16.19.51
      DSSSD#1 slow comparator 0xa
      DSSSD#2 slow comparator 0xa
Entry  Mon Mar 8 07:02:17 2021, CA, LS, Monday 8th March 08:00 - 17:00 24x
08:00 ASIC settings 2019Dec19-16.19.51
      DSSSD#1 slow comparator 0xa
      DSSSD#2 slow comparator 0xa
Entry  Tue Mar 9 06:58:14 2021, CA, LS, March 9th 08:00-11:00 shift 23x
08:00 DAQ continues ok - writing to file R13_120

      Merger ok - 4.6M data items/s
Entry  Thu Dec 5 22:00:11 2019, CA, DK, NH, Dec 5 Night Shift 30x
15:30
  TD found the merger was running at ~43 Mb/s
  The odd-numbered FEE64s all had significant (>200k) disk rates
Entry  Fri Dec 6 20:34:56 2019, CA, DK, NH, Dec 6 Night Shift 15x
21.35 AIDA DAQ currently running, TapeService on, not writing to storage

      System wide checks ok
Entry  Wed Apr 3 09:28:07 2019, CA, CB, TD, Wednesday April 3rd 2018 11x
Arrived at 09:54 - sequenced all FEE64 on

FEE64 not mounted properly - something happened to network overnight, see attachment 1,2 for AIDA system log
Entry  Wed Apr 3 13:29:20 2019, CA, CB, TD, report - high DAQ stall 030419_1416_aida10stats.png030419_1417_aida09stats.png030419_1417_aida11stats.png030419_1418_aida12stats.png030419_1419_aida10_led.png
aida10 runs very fast for a period, then stops.

Have to restart Merger and TapeServer to get it running again.
Entry  Tue Nov 19 21:22:06 2019, CA, CB, DK, NH, 19/20 November 2019 - overnight shift 15x
19 November

Waiting for 40Ar beam to be delivered for tests.
Entry  Wed Nov 20 20:36:14 2019, CA, CB, DK, NH, 20/21 November Night Shift 17x
21:35 (NH) - A few merger timestamp errors were appearing - Decided to powercycle all FEE64s, all checks OK.
 No Screenshot due to forgetting before I closed merger 
 FEEs were often not stopping properly and needing merger reset as well.
Entry  Wed Mar 3 15:02:19 2021, CA, MBS command line startup 
/MIDAS/Linux/startup/datarelaymbs 
Entry  Mon Mar 8 17:02:38 2021, CA, Monday 8th March 18:00 - 00:00 12x
18:00 ASIC settings 2019Dec19-16.19.51
      DSSSD#1 slow comparator 0xa
      DSSSD#2 slow comparator 0xa
Entry  Tue Mar 9 23:12:17 2021, CA, March 10th 00:00 - 08:00 20x
00:13 beam back, but some spills 'missing'

      DESPEC keeping beam as is, but may stop later if it worsens
Entry  Thu Mar 11 23:07:23 2021, CA, March 12th 00:00 - 08:00 shift 15x
00:10 DAQ continues OK - file R30_372

      ASIC settings 2019Dec19-16.19.51
Entry  Sat Mar 13 23:08:08 2021, CA, 14th March 00:00-08:00 22x
00:08 DAQ continues ok - writing to file R46_221

      ASIC settings 2019Dec19-16.19.51
Entry  Tue Apr 20 07:06:20 2021, CA, April 20th 08:00 - 12:00 Screenshot_from_2021-04-20_07-45-09.pngScreenshot_from_2021-04-20_07-45-43.pngScreenshot_from_2021-04-20_07-46-05.pngScreenshot_from_2021-04-20_08-14-58.pngScreenshot_from_2021-04-20_08-15-38.png
08:09 DAQ crashes at start of shift (!)

      again happens at same time as beam being lost
Entry  Tue Apr 20 23:08:22 2021, CA, Wed Apr 21 00:00-08:00 23x
00:00 - CA takes over

00:15 - stats/database/ucesb ok - attachment 1
Entry  Wed Apr 21 23:05:39 2021, CA, 22nd April 00:00 - 08:00 16x
00:07 stats/ucesb/DB checks all ok

00:30 all system wide checks ok *except* fpga errors