AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DESPEC, Page 34 of 36  ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Authordown Subject Text Attachments
  232   Fri Apr 16 23:13:57 2021 CA, MA, BASaturday 16th 00:00 - 08:00 00:05 DESPEC tuning beam, changing spill length

00:21 DAQ continues ok
 14x 
  141   Wed Mar 11 16:29:17 2020 CA, LS, TDslow comparator threshold comparison17.29 good event statistics for slow comparator
threshold at 100 keV (0xa) - attachment 1
 100keV_stats.png110keVStats.png120kevstats.png80kevDSSD2.png 
  153   Sun Mar 15 06:45:00 2020 CA, LS, CGSunday 15th March 08:00 - 24:00ASIC settings 2019Oct31-13.24.23
     slow comparator 0xa
 35x 
  177   Sun Mar 7 07:23:26 2021 CA, LSMarch 7th 08:00 ASIC settings 2019Dec19-16.19.51
      DSSSD#1 slow comparator 0xa
      DSSSD#2 slow comparator 0xa
 14x 
  179   Mon Mar 8 07:02:17 2021 CA, LSMonday 8th March 08:00 - 17:0008:00 ASIC settings 2019Dec19-16.19.51
      DSSSD#1 slow comparator 0xa
      DSSSD#2 slow comparator 0xa
 24x 
  183   Tue Mar 9 06:58:14 2021 CA, LSMarch 9th 08:00-11:00 shift08:00 DAQ continues ok - writing to file R13_120

      Merger ok - 4.6M data items/s
 23x 
  103   Thu Dec 5 22:00:11 2019 CA, DK, NHDec 5 Night Shift15:30
  TD found the merger was running at ~43
Mb/s
 30x 
  104   Fri Dec 6 20:34:56 2019 CA, DK, NHDec 6 Night Shift21.35 AIDA DAQ currently running, TapeService
on, not writing to storage
 15x 
  43   Wed Apr 3 09:28:07 2019 CA, CB, TDWednesday April 3rd 2018Arrived at 09:54 - sequenced all FEE64 on

FEE64 not mounted properly - something happened
 11x 
  44   Wed Apr 3 13:29:20 2019 CA, CB, TDreport - high DAQ stallaida10 runs very fast for a period, then stops.

Have to restart Merger and TapeServer to
 030419_1416_aida10stats.png030419_1417_aida09stats.png030419_1417_aida11stats.png030419_1418_aida12stats.png030419_1419_aida10_led.png 
  98   Tue Nov 19 21:22:06 2019 CA, CB, DK, NH19/20 November 2019 - overnight shift19 November

Waiting for 40Ar beam to be delivered for
 15x 
  99   Wed Nov 20 20:36:14 2019 CA, CB, DK, NH20/21 November Night Shift21:35 (NH) - A few merger timestamp errors
were appearing - Decided to powercycle all
FEE64s, all checks OK.
 17x 
  168   Wed Mar 3 15:02:19 2021 CAMBS command line startup/MIDAS/Linux/startup/datarelaymbs    
  181   Mon Mar 8 17:02:38 2021 CAMonday 8th March 18:00 - 00:0018:00 ASIC settings 2019Dec19-16.19.51
      DSSSD#1 slow comparator 0xa
      DSSSD#2 slow comparator 0xa
 12x 
  186   Tue Mar 9 23:12:17 2021 CAMarch 10th 00:00 - 08:0000:13 beam back, but some spills 'missing'

      DESPEC keeping beam as is, but may
 20x 
  190   Thu Mar 11 23:07:23 2021 CAMarch 12th 00:00 - 08:00 shift00:10 DAQ continues OK - file R30_372

      ASIC settings 2019Dec19-16.19.51
 15x 
  197   Sat Mar 13 23:08:08 2021 CA14th March 00:00-08:0000:08 DAQ continues ok - writing to file R46_221

      ASIC settings 2019Dec19-16.19.51
 22x 
  251   Tue Apr 20 07:06:20 2021 CAApril 20th 08:00 - 12:0008:09 DAQ crashes at start of shift (!)

      again happens at same time as beam
 Screenshot_from_2021-04-20_07-45-09.pngScreenshot_from_2021-04-20_07-45-43.pngScreenshot_from_2021-04-20_07-46-05.pngScreenshot_from_2021-04-20_08-14-58.pngScreenshot_from_2021-04-20_08-15-38.png 
  255   Tue Apr 20 23:08:22 2021 CAWed Apr 21 00:00-08:0000:00 - CA takes over

00:15 - stats/database/ucesb ok - attachment
 23x 
  259   Wed Apr 21 23:05:39 2021 CA22nd April 00:00 - 08:0000:07 stats/ucesb/DB checks all ok

00:30 all system wide checks ok *except*
 16x 
ELOG V3.1.4-unknown