Fri Mar 13 23:06:39 2020, CA, OH, Saturday 14th March 00:00 - 08:00 19x
|
ASIC settings 2019Oct31-13.24.23
slow comparator 0xa
|
Fri Mar 5 23:21:59 2021, CA, OH, March 6th 2021 00:00 - 08:00 shift 18x
|
00:23 206Hg setting - No beam in AIDA yet
AIDA not writing to file
|
Mon Apr 1 10:14:09 2019, CA, NH, TD, Friday 29th March 2019  
|
16:30 good event statistics ok, with 9,10,11,12 running faster (detector FEE64s) (attachment 1)
FEE temperatures ok (attachment 2)
|
Mon Apr 1 10:20:20 2019, CA, NH, TD, MBS Relay startup 
|
To start the MBS Data Relay, click on the top rightmost of the MIDAS icons (MBS relay, Data Relay => MBS) in
Desktop 3. (attachment 1)
|
Wed Nov 13 09:10:37 2019, CA, NH, OH, 13th November 2019   
|
10:10 moved HV cables from 11 and 12 to 10 and 9 - all detectors biased in same configuration
lowered slow comparator threshold to 0xa
|
Fri Apr 16 23:13:57 2021, CA, MA, BA, Saturday 16th 00:00 - 08:00 14x
|
00:05 DESPEC tuning beam, changing spill length
00:21 DAQ continues ok
|
Wed Mar 11 16:29:17 2020, CA, LS, TD, slow comparator threshold comparison   
|
17.29 good event statistics for slow comparator threshold at 100 keV (0xa) - attachment 1
17.36 good event statistics for slow comparator threshold at 110 keV (0xb) - attachment 2
|
Sun Mar 15 06:45:00 2020, CA, LS, CG, Sunday 15th March 08:00 - 24:00 35x
|
ASIC settings 2019Oct31-13.24.23
slow comparator 0xa
|
Sun Mar 7 07:23:26 2021, CA, LS, March 7th 14x
|
08:00 ASIC settings 2019Dec19-16.19.51
DSSSD#1 slow comparator 0xa
DSSSD#2 slow comparator 0xa
|
Mon Mar 8 07:02:17 2021, CA, LS, Monday 8th March 08:00 - 17:00 24x
|
08:00 ASIC settings 2019Dec19-16.19.51
DSSSD#1 slow comparator 0xa
DSSSD#2 slow comparator 0xa
|
Tue Mar 9 06:58:14 2021, CA, LS, March 9th 08:00-11:00 shift 23x
|
08:00 DAQ continues ok - writing to file R13_120
Merger ok - 4.6M data items/s
|
Thu Dec 5 22:00:11 2019, CA, DK, NH, Dec 5 Night Shift 30x
|
15:30
TD found the merger was running at ~43 Mb/s
The odd-numbered FEE64s all had significant (>200k) disk rates
|
Fri Dec 6 20:34:56 2019, CA, DK, NH, Dec 6 Night Shift 15x
|
21.35 AIDA DAQ currently running, TapeService on, not writing to storage
System wide checks ok
|
Wed Apr 3 09:28:07 2019, CA, CB, TD, Wednesday April 3rd 2018 11x
|
Arrived at 09:54 - sequenced all FEE64 on
FEE64 not mounted properly - something happened to network overnight, see attachment 1,2 for AIDA system log
|
Wed Apr 3 13:29:20 2019, CA, CB, TD, report - high DAQ stall    
|
aida10 runs very fast for a period, then stops.
Have to restart Merger and TapeServer to get it running again.
|
Tue Nov 19 21:22:06 2019, CA, CB, DK, NH, 19/20 November 2019 - overnight shift 15x
|
19 November
Waiting for 40Ar beam to be delivered for tests.
|
Wed Nov 20 20:36:14 2019, CA, CB, DK, NH, 20/21 November Night Shift 17x
|
21:35 (NH) - A few merger timestamp errors were appearing - Decided to powercycle all FEE64s, all checks OK.
No Screenshot due to forgetting before I closed merger
FEEs were often not stopping properly and needing merger reset as well.
|
Wed Mar 3 15:02:19 2021, CA, MBS command line startup
|
| /MIDAS/Linux/startup/datarelaymbs |
Mon Mar 8 17:02:38 2021, CA, Monday 8th March 18:00 - 00:00 12x
|
18:00 ASIC settings 2019Dec19-16.19.51
DSSSD#1 slow comparator 0xa
DSSSD#2 slow comparator 0xa
|
Tue Mar 9 23:12:17 2021, CA, March 10th 00:00 - 08:00 20x
|
00:13 beam back, but some spills 'missing'
DESPEC keeping beam as is, but may stop later if it worsens
|