AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DESPEC, Page 35 of 36  ELOG logo
  ID Date Authordown Subject Text Attachments
  316   Fri May 14 07:05:08 2021 CAFriday 14th May 08:00 - 16:00 shift08:00 CA takes over

08:28 Problem at UNILAC - no beam
 24x 
  326   Tue May 18 23:11:40 2021 CAWednesday May 19th 00:00 - 08:0000:00 CA takes over
      LS has performed usual checks, see
previous Elog entry - all ok
 14x 
  328   Wed May 19 09:06:58 2021 CAMay 16th 00:00 - 08:0016th May 2021 - 00:00 - 08:00 Shift
Author: CA
 16x 
  336   Thu May 20 07:03:02 2021 CAThursday May 20th 08:00 - 16:00 shift08:00 CA takes over

08:04 DAQ continues ok - writing to file
 40x 
  342   Fri May 21 15:03:48 2021 CAFriday 21st May 16:00 - 00:00 shift16:00 CA takes over
      DSSD1 n+n sides 0x20 on ASICs 1-3 and
0x64 on ASIC 4
 17x 
  616   Sun Apr 28 15:09:34 2024 Betool Alayed16:0-00:00 28 April 202416:00 aida04 not producing data

         
power cycle all FEE64s to recover DAQ
 R21_668.txt 
  619   Sun Apr 28 16:26:47 2024 Betool Alayed16:00-00:00 Sunday 28 April19:24 pm screenshots

and

17:18 pm screenshots
 10x 
  620   Sun Apr 28 20:35:57 2024 Betool Alayed16:0-00:00 28 April 202421:30 screenshots

and

23:24 screenshots
 10x 
  657   Wed Jun 12 15:41:07 2024 Betool Alayed16:00-00:00 Wed 12 Jun 245pm full checks:
DSSSD bias & leakage current 
ok - attachment # 1-2
 27x 
  237   Sun Apr 18 00:57:36 2021 BA, MASanday 18 April 00.00-08.0002:01 Beam has stopped at 01:37 and returend
at 01:43 for few min and then stopped again
and not knowen how it will take until it
 12x 
  434   Thu May 12 21:43:49 2022 BA, MARates 

Statistic check (screenshot attached).

Temperatures OK (screenshot attached).
 Stati2022-05-12_22-47-26.pngTemp2022-05-12_22-48-41.pngLeakageCurrent2022-05-12_22-45-44.png 
  435   Thu May 12 22:49:39 2022 BA, MALow RatesThe rate is very low in all aida, not sure
.
 RatesLow2022-05-12_23-48-01.png 
  451   Sat May 14 15:35:24 2022 BA, AASaturday 14 May   Stais_from_2022-05-14_16-30-53.pngTemp_2022-05-14_16-32-42.pngLeakage_2022-05-14_16-33-45.png 
  452   Sat May 14 17:34:40 2022 BA, AASaturday 14 MayFEE64 module aida09 global clocks failed,
6
 Clock status test result: Passed
 Stat_2022-05-14_18-33-16.pngTemp_2022-05-14_18-32-07.pngLeakage_2022-05-14_18-30-52.png 
  453   Sat May 14 19:39:13 2022 BA, AASaturday 14 MayFEE64 module aida09 global clocks failed,
6
 Clock status test result: Passed
 Stat_2022-05-14_20-36-15.pngTemp_2022-05-14_20-35-19.pngLeakage_2022-05-14_20-33-32.png 
  454   Sat May 14 21:34:11 2022 BA, AASaturday 14 MayFEE64 module aida09 global clocks failed,
6
 Clock status test result: Passed
 Rates_2022-05-14_22-32-44.pngTemp_2022-05-14_22-31-37.pngLeakg_2022-05-14_22-30-28.png 
  500   Sat Jun 25 17:06:42 2022 BA, AASaturday 25 June 2022 16:00-00:00Took over the night shift from Magda

 

18:00 : attachments 1-3
 9x 
  492   Wed Jun 22 23:18:45 2022 AM, OH, TD, MAThursday 23 June00:00 TD Noticed on the last stats uploaded
that AIDA08 had stopped sending signals.
      Attempted to recover restarting merger
 19x 
  463   Mon May 16 23:02:54 2022 AMTuesday 17th May 00:00-08:0001:00:     Attachments
1-3, System checks good

03:00:    
 12x 
  495   Fri Jun 24 00:34:55 2022 AMFriday 24 June 00:00-08:0001:30    Attachments 1-5,
white rabbit and fpga timestamp failures,
otherwise all good
 20x 
ELOG V3.1.4-unknown