AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DESPEC, Page 8 of 34  ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
Entry  Thu Apr 11 08:27:21 2024, JB, TD, 11 April noise tests 48x

TO-DO for 11.04.2024

- Try bringing bPlast drain wire ground back to the PSU ground for PN 300 and R&SRMP4040.

- Recheck the downstream
detector bias and ground scheme.

-

 
Entry  Wed Apr 10 08:37:57 2024, JB, CC, TD, Wednesday 10 April 47x

09.38 CC completed install of Bplast driver PCBs yesterday evening.
      All flat ribbon cables connected - all drain wires grounded
Entry  Tue Apr 9 13:22:41 2024, TD, JB, CC, Continued of 9th of April Screenshot_from_2024-04-09_14-22-20.pngScreenshot_from_2024-04-09_14-22-16.pngScreenshot_from_2024-04-09_17-18-45.png
Disconnected test - pulser from aida08. Noise conditions improved slightly, probably less pulser events. (Attachments 1 & 2).

We recabled the dew point sensor and flow sensor for the water supply interlock to the FEE64s. When we tried to power up the interlock box, the
PSU (charging block) LED was blinking indicating an internal power instability. We then plugged each of the sensors out and into the interlock box and
Entry  Tue Apr 9 09:04:07 2024, TD, [How To] Remote control of BNC PB-5 Screenshot_from_2024-04-09_10-03-42.png

BNC PB-5 set to remote control
Entry  Tue Apr 9 08:37:47 2024, TD, Tuesday 9 April 16x
09.36 Cooling water temperature and flow OK

      FEE64 power ON
Entry  Mon Apr 8 16:39:00 2024, JB, CC, TD, Monday 8 April 11x

17.32 Power and detector bias cycle
Entry  Mon Apr 8 11:18:19 2024, TD, S505 offline analysis data file R3_150 Screenshot_from_2024-03-29_20-21-07.pngScreenshot_from_2024-03-29_20-21-45.pngScreenshot_from_2024-03-29_20-22-29.pngScreenshot_from_2024-03-29_20-23-06.pngvariables.dat

DRG quotes ( from Elog ) S505 FEE64 configuration as
Entry  Mon Apr 8 10:23:16 2024, TD, JB, AIDA Noise optimisation 30x
In the morning we reinstalled FEE64s aida06, aida13, aida07. The rails of the FEE64 boards were found to be incorrect (that of the rails that were used
in CARME).

After replacing the rails on the abovementioned FEE64s we powercycled AIDA and found the following results in the histograms and statistics.
Entry  Sun Apr 7 18:13:56 2024, TD, Sunday 7 April contd. 6x

19.10 CAEN N1419ET LK fitted
      power cycle
Entry  Sun Apr 7 13:08:52 2024, TD, FEE64 configuration AIDA_S100_WiringPlan.drawio.png
FEE64 configuration per https://elog.gsi.de/despec/S100/6

Configuration: Wide - 16 FEEs, 2 DSSD
Entry  Sun Apr 7 12:16:27 2024, TD, aida06 system console log 
ISOL Version 1.00 Date 9th January 2017
Flash base address=FC000000
Set Flash to ASync Mode
Entry  Sun Apr 7 12:02:23 2024, TD, Sunday 7 April 46x

13.00 Cooling water temperature and flow OK - attachment 1
Entry  Wed Apr 3 13:02:19 2024, NH, Merger for 16 FEEs Screenshot_from_2024-04-03_14-15-02.pngScreenshot_from_2024-04-03_14-15-25.pngScreenshot_from_2024-04-03_14-15-36.pngScreenshot_from_2024-04-03_14-15-45.pngScreenshot_from_2024-04-03_14-15-52.png
Changed /MIDAS/Linux/startup/NewMerger

Change parameters -i and -l in master64 to 16 for 16 FEEs
Entry  Wed Apr 3 12:42:57 2024, NH, Report aida02 WR errors Screenshot_from_2024-04-03_13-43-48.pngScreenshot_from_2024-04-03_13-43-38.pngScreenshot_from_2024-04-03_13-43-58.pngScreenshot_from_2024-04-03_13-44-14.pngScreenshot_from_2024-04-03_13-44-36.png
The WR error counter for aida02 seems to consantly rise

Tried reseating cable on both ends, no change

However clock status passed, aida02 has a correct WR timestamp and no FIFO/PLL errors seen
Entry  Wed Apr 3 12:09:47 2024, NH, Report - aida06 frequently fails to boot first time (PHY error) ttyUSB15
When booting up AIDA aida06 usually crashes the first time, it fails to get IP from DHCP
After 180 seconds it reboots and seems to connect fine

Log file attached, key part (to me) is this:
Entry  Tue Apr 2 18:37:21 2024, TD, S505 ADC offsets  S505_calibration_data.txt

S505 ADC offsets using pulser walkthrough data from data file R1
Entry  Tue Apr 2 12:36:25 2024, JB, CC, NH, Installing FEE64s of DSSSD2 cont. 
Some additional checks

- check 'top hat' electrical isolators are correctly installed at each of the 4x mounting points of the AIDA snout
assembly
Entry  Wed Mar 27 14:22:35 2024, JB, NH, Installing FEE64s of DSSSD2 14x
Mounted on frame:

DSSD 1 (Upstream) :     3208-2/3208-5/3208-8
DSSD 2 (Downstream): 3208-3/3208-21/3208-22
    Reply  Thu Mar 28 09:18:53 2024, TD, Installing FEE64s of DSSSD2 
Some additional checks

- check 'top hat' electrical isolators are correctly installed at each of the 4x mounting points of the AIDA snout assembly 

- check snout is electrically isolated with respect to AIDA support assembly/stand, bPlas PCBs/cabling/ground/drain wires and BB7
Entry  Tue Mar 26 18:56:03 2024, TD, USB-controlled ac mains relay interlock box - wiring 

Sensor ( 4 pins )
Entry  Tue Mar 26 10:32:05 2024, NH, JB, Tue 26 March 9x
Taken 4 FEE64s from CRYRING (the 4 easiest to access)
  41:d8:2b
  41:f6:5a
ELOG V3.1.4-unknown