Entry  Wed Apr 3 13:02:19 2024, NH, Merger for 16 FEEs Screenshot_from_2024-04-03_14-15-02.pngScreenshot_from_2024-04-03_14-15-25.pngScreenshot_from_2024-04-03_14-15-36.pngScreenshot_from_2024-04-03_14-15-45.pngScreenshot_from_2024-04-03_14-15-52.png
Changed /MIDAS/Linux/startup/NewMerger

Change parameters -i and -l in master64 to 16 for 16 FEEs
Entry  Wed Apr 3 12:42:57 2024, NH, Report aida02 WR errors Screenshot_from_2024-04-03_13-43-48.pngScreenshot_from_2024-04-03_13-43-38.pngScreenshot_from_2024-04-03_13-43-58.pngScreenshot_from_2024-04-03_13-44-14.pngScreenshot_from_2024-04-03_13-44-36.png
The WR error counter for aida02 seems to consantly rise

Tried reseating cable on both ends, no change

However clock status passed, aida02 has a correct WR timestamp and no FIFO/PLL errors seen
Entry  Wed Apr 3 12:09:47 2024, NH, Report - aida06 frequently fails to boot first time (PHY error) ttyUSB15
When booting up AIDA aida06 usually crashes the first time, it fails to get IP from DHCP
After 180 seconds it reboots and seems to connect fine

Log file attached, key part (to me) is this:
Entry  Tue Apr 2 18:37:21 2024, TD, S505 ADC offsets  S505_calibration_data.txt

S505 ADC offsets using pulser walkthrough data from data file R1
Entry  Tue Apr 2 12:36:25 2024, JB, CC, NH, Installing FEE64s of DSSSD2 cont. 
Some additional checks

- check 'top hat' electrical isolators are correctly installed at each of the 4x mounting points of the AIDA snout
assembly
Entry  Wed Mar 27 14:22:35 2024, JB, NH, Installing FEE64s of DSSSD2 14x
Mounted on frame:

DSSD 1 (Upstream) :     3208-2/3208-5/3208-8
DSSD 2 (Downstream): 3208-3/3208-21/3208-22
    Reply  Thu Mar 28 09:18:53 2024, TD, Installing FEE64s of DSSSD2 
Some additional checks

- check 'top hat' electrical isolators are correctly installed at each of the 4x mounting points of the AIDA snout assembly 

- check snout is electrically isolated with respect to AIDA support assembly/stand, bPlas PCBs/cabling/ground/drain wires and BB7
Entry  Tue Mar 26 18:56:03 2024, TD, USB-controlled ac mains relay interlock box - wiring 

Sensor ( 4 pins )
Entry  Tue Mar 26 10:32:05 2024, NH, JB, Tue 26 March 9x
Taken 4 FEE64s from CRYRING (the 4 easiest to access)
  41:d8:2b
  41:f6:5a
Entry  Fri Mar 22 08:31:39 2024, TD, Friday 22 March 39x

09.30 Systems check
Entry  Fri Mar 22 08:29:55 2024, TD, Anydesk restarted remotely 
Anydesk restarted remotely per https://elog.ph.ed.ac.uk/CARME/489

Anydesk address now restored to 832827869
Entry  Thu Mar 21 15:41:49 2024, NH, AM, MP, CC, Thu Mar 21 6x
Fig 1-3: Noise situation at real thresholds (0xa p+n, 0xf n+n)

Fig 4-6: After AM and MP turn off Mesytec Preamps
    Reply  Fri Mar 22 08:22:43 2024, NH, AM, MP, CC, Thu Mar 21 
> Fig 1-3: Noise situation at real thresholds (0xa p+n, 0xf n+n)

> Fig 4-6: After AM and MP turn off Mesytec Preamps
Entry  Fri Mar 22 07:34:54 2024, NH, JB, Au Beam 
 
Entry  Wed Mar 20 17:02:53 2024, NH, /dev/sdd 
The following messages are in the system log very often:

Mar 20 18:00:56 aidas-gsi smartd[1076]: Device: /dev/sdd [SAT], 2224 Currently unreadable (pending) sectors
Entry  Wed Mar 20 12:22:27 2024, NH, Wed Mar 20 9x
Turn on AIDA for Dry Run demonstrations and so on

All system wide checks, temp, bias OK

Noise situation is dreadful (but has not been optimised). Deterioriation since first mounted, suspect cabling issues with bPlast and BB7.
Entry  Tue Mar 19 10:17:30 2024, NH, Dry Run 2024 - 19th March 24 Screenshot_from_2024-03-19_13-44-34.pngScreenshot_from_2024-03-19_13-44-22.pngScreenshot_from_2024-03-19_13-44-04.pngScreenshot_from_2024-03-19_13-43-44.pngScreenshot_from_2024-03-19_13-43-24.png
AIDA has 8 FEEs and 1 DSSSD 

Aida08 (HDMI#12) had no WR again, I moved it to a different MACB and now it gets WR
Entry  Mon Mar 18 18:04:43 2024, NH, Preparation for pre-s100 dry run (and test beam???) 
In preparation for the dry run the following *temporary* changes to the FEE numbering have been prepared
These should be reverted after the dry run to ensure cable->fee agreement again
Entry  Fri Mar 15 16:29:57 2024, NH, Leakage currents 
The behaviour of the DSSSD leakage current at low voltages and during biases is unusual and varies depending on how the adapter boards are connected
To summarise the behaviour I have observed
Entry  Thu Mar 14 13:00:23 2024, JB, NH, MA, AM, GA, Mounting and biasing DSSD 2 
new Downstream DSSD2: 3208-2/3208-5/3208-8

Covered with black cloth.
Entry  Thu Mar 14 12:13:17 2024, JB, NH, MA, Mounting and biasing DSSD 1 
Upstream bPlast mounted

new Upstream DSSD: 3208-2/3208-5/3208-8
Entry  Wed Mar 13 13:02:19 2024, JB, NH, HA, MA, DSSD 1 biasing tests 20240313_142551.jpg
Dismounted Snout and biased DSSSD1 channels

leftmost waifer working

middle waifer reaches 90V then current ramps up