Entry  Thu Mar 7 15:15:29 2024, JB, NH, CC, AIDA HV Bias Test IV Curve 

AIDA I-V Test


Voltage (V)
Current
(uA)


10
1.43


20
2.065


30
2.415


40
2.64


50
2.825


60
2.99


70
3.185


80
3.58


90
5.01


100
9.4




-
Voltage-Current test of newly installed AIDA snout. Breakdown observed at around ~92 V. Probably caused my light leakage into the snout, will investigate
Entry  Thu Mar 7 11:09:05 2024, HA, JB, CC, TD, MG, Thursday 7 March 

Snout assembly
Entry  Tue Mar 5 09:10:01 2024, MA, JB, TD, Tuesday 5 March 20240305_101140.jpg20240305_101146.jpg20240305_165949.jpg

Old ribbon cable assemblies - attachments 1  2
Entry  Mon Mar 4 11:35:30 2024, TD, Monday 4 March 11x
12.30 FEE64 41:d7:cd ASIC mezzanine u/s, no data, ASIC temperature c. 20 deg C ( ambient ) low
      Replaced ASIC mezzanine with new ASIC mezzanine
      Installed as aida08
Entry  Sun Mar 3 16:06:11 2024, TD, Sunday 3 March 24x

17.00 FEE64 41:a0:71 ASIC #2 u/s
      Replaced ASIC mezzanine with new ASIC mezzanine
Entry  Mon Feb 26 13:17:51 2024, TD, Offline analysis of DEC23/R9_6 9x

First pass analysis of data file /TapeData/DEC23/R9_6
Entry  Wed Jan 31 15:27:07 2024, TD, Photos of water flow & dew point sensor interlock box 20240131_160205.jpg20240131_145249.jpg20240131_145340.jpg20240131_160341.jpg
Attachment 1 - 4 socket input connectors ( from sensor to interlock box )

Attachment 2 & 2 - 24V dc relays and internal wiring
Entry  Mon Nov 13 11:46:54 2023, TD, Summary of AIDA 24cm x 8cm 'triple' DSSSD tests Summary_of_AIDA_tests_2022-3_-_Dec_2023.pdfSummary_of_AIDA_tests_2022-3_-_Dec_2023.pptx
 
Entry  Thu Oct 12 14:01:43 2023, TD, MSL type BB18 24cm x 8cm DSSSD test - update Screenshot_from_2023-10-12_15-13-30.pngScreenshot_from_2023-10-12_15-17-05.png

DSSSD MSL type BB18 24cm x 8cm 3208-3/3208-21/3208-22
Entry  Sun Oct 1 11:47:07 2023, TD, S4 cooling water  1000007356.jpg1000007355.jpg

The photographs show the cooling water controls and temperature/pressure gauges outside S4 and the connections used by AIDA within S4.
Entry  Thu Aug 31 15:24:56 2023, NH, New AIDA MBS PC 
The AIDA MBS FDR will be x86l-119 from now on, not x86l-94

the MBS relay and startup scripts will be changed for this
Entry  Mon Aug 28 12:47:56 2023, NH, Power Failure 24.08.2023 
There was a power failure in the morning of 24.08.2023 in the Rhein-Main area affecting GSI

The Aida workstation (aida-3) has been restarted, it is unknown if the Pis in S4 rebooted as well (there is a UPS)
Entry  Sun Jul 16 09:32:57 2023, TD, Firefox browser proxy setting change 

Firefox browser proxy setting changed to 'Auto-detect proxy settings for this network' ( Firefox -> Edit -> Settings -> Network Settings -> Settings )
Entry  Wed Jan 18 13:40:33 2023, PJCS TD, MACB settings with either Emulator or VITAR macb_apr20.jedmacb_apr20.vhdzybo.jpgMACB.jpg
When using the VETAR connected to the HDMI port of the root MACB the settings for all the MACB in the system 0x3.

This setting takes the Clock and Data line from the input HDMI and outputs it via teh HDMI output ports.

When using the Emulator connected via the SMA connectors on the back of the root MACB then the setting for the root MACB
Entry  Fri Dec 16 14:02:12 2022, NH, AIDA System off for christmas break 
The AIDA NIM crate, pis and workstation have been powered off for the Christmas break and will not be accessible
Entry  Thu Oct 6 16:51:49 2022, NH, Oscilloscope analysis 24x
Investigating AIDA noise with a TA041 differential probe and oscilloscope 

AC Mains (DESPEC platform AC, L-N)
Entry  Wed Sep 14 19:07:07 2022, PJCS, INFO : Three Merger Statistics explained 
There are three Merger statistics that can be used to better understand how the data flow through the Merger system is proceeding.

Two are from the Link task and one is from the Merger.They are all "No data buffers avaliable" with #1, #2, #3 at the end.

#1: This is incremented when the Link task has a data item to put in the queue for the Merge process but there is no room.
Entry  Thu Sep 8 12:37:18 2022, NH, Proxy Port Changed 
The proxy in Firefox, Yum and AnyDesk has been changed as the old wasn't working

proxy.gsi.de port 3128 is now in use
Entry  Thu Sep 8 12:31:25 2022, NH, Retrying AIDA DataAcq v10 AnyDeskMSI_2022-09-08_13-35-50.pngAnyDeskMSI_2022-09-08_13-35-58.pngAnyDeskMSI_2022-09-08_13-36-02.png
Startup AIDA with ribbon cable connected to aida03 and aida07 for noise

Setup and run with waveforms enabled. Discriminators ADC power etc as default
Entry  Tue Aug 30 13:48:32 2022, NH, AIDA Single Switch Configuration 
The second switch was moved back to CARME so AIDA has been configured back to using a single switch

aida02/aida04/aida06/aida08 updated back to first switch as per https://elog.ph.ed.ac.uk/DESPEC/433