AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DESPEC, Page 9 of 35  ELOG logo
ID Date Author Subject Text Attachments
  543   Wed Mar 20 17:02:53 2024 NH/dev/sddThe following messages are in the system log
very often:
  
  542   Wed Mar 20 12:22:27 2024 NHWed Mar 20Turn on AIDA for Dry Run demonstrations
and so on

All system wide checks, temp, bias
 9x 
  541   Tue Mar 19 10:17:30 2024 NHDry Run 2024 - 19th March 24AIDA has 8 FEEs and 1 DSSSD 

Aida08 (HDMI#12) had no WR again, I moved
 Screenshot_from_2024-03-19_13-44-34.pngScreenshot_from_2024-03-19_13-44-22.pngScreenshot_from_2024-03-19_13-44-04.pngScreenshot_from_2024-03-19_13-43-44.pngScreenshot_from_2024-03-19_13-43-24.png 
  540   Mon Mar 18 18:04:43 2024 NHPreparation for pre-s100 dry run (and test beam???)In preparation for the dry run the following
*temporary* changes to the FEE numbering
have been prepared
  
  539   Fri Mar 15 16:29:57 2024 NHLeakage currentsThe behaviour of the DSSSD leakage current
at low voltages and during biases is unusual
and varies depending on how the adapter boards
  
  537   Thu Mar 14 13:00:23 2024 JB, NH, MA, AM, GAMounting and biasing DSSD 2new Downstream DSSD2: 3208-2/3208-5/3208-8

Covered with black cloth.
  
  536   Thu Mar 14 12:13:17 2024 JB, NH, MAMounting and biasing DSSD 1Upstream bPlast mounted

new Upstream DSSD: 3208-2/3208-5/3208-8
  
  535   Wed Mar 13 13:02:19 2024 JB, NH, HA, MADSSD 1 biasing testsDismounted Snout and biased DSSSD1 channels

leftmost waifer working

middle waifer reaches 90V then
 20240313_142551.jpg 
  534   Tue Mar 12 16:16:49 2024 NH, TD, JB, HASummary of DSSSD Biasing 12.03DSSD#1 undergoes a breakdown at 90V, two of
the three wafers show this
- The adapter PCBs themselves have no breakdown
  
  533   Mon Mar 11 15:19:44 2024 JB, NH, Priyanka, Michael Armstrong, Helena AlbersTo Do: AIDA PCB testsTo do:

1) Disconnect ribbon cables
from p+n junction FEE64 adaptor PCBs of upstream
  
  532   Sun Mar 10 17:08:12 2024 NHAIDA FEE Layout + Cabling Plan for S100Proposed FEE numbering and wiring plan for
upcoming experiment S100 (2x Wide DSSSDs)
 AIDA_S100_WiringPlan.drawio.pngAIDA_S100_WiringPlan.drawioAIDA_S100_WiringPlan(1).drawioAIDA_S100_WiringPlan.drawio.png 
  531   Fri Mar 8 16:05:57 2024 JB, CC, TD, NHFriday 8 MarchBias tests of AIDA on individual wafers
and in parallel. Spreadsheet can be found
in attachment 1, and graphic results can
 IV_test_AIDA.xlsxchart.pngDownstream_positive_bias_vs._Current_(uA).png 
  530   Thu Mar 7 15:15:29 2024 JB, NH, CCAIDA HV Bias Test IV Curve
AIDA I-V
Test


Voltage
  
  529   Thu Mar 7 11:09:05 2024 HA, JB, CC, TD, MGThursday 7 March
Snout assembly
  
  528   Tue Mar 5 09:10:01 2024 MA, JB, TDTuesday 5 March
Old ribbon cable assemblies - attachments
1  2
 20240305_101140.jpg20240305_101146.jpg20240305_165949.jpg 
  527   Mon Mar 4 11:35:30 2024 TDMonday 4 March12.30 FEE64 41:d7:cd ASIC mezzanine u/s, no
data, ASIC temperature c. 20 deg C ( ambient
) low
 11x 
  526   Sun Mar 3 16:06:11 2024 TDSunday 3 March
17.00 FEE64 41:a0:71 ASIC #2 u/s
      Replaced ASIC mezzanine with new ASIC
 24x 
  525   Mon Feb 26 13:17:51 2024 TDOffline analysis of DEC23/R9_6
First pass analysis of data file /TapeData/DEC23/R9_6
 9x 
  524   Wed Jan 31 15:27:07 2024 TDPhotos of water flow & dew point sensor interlock boxAttachment 1 - 4 socket input connectors (
from sensor to interlock box )
 20240131_160205.jpg20240131_145249.jpg20240131_145340.jpg20240131_160341.jpg 
  523   Mon Nov 13 11:46:54 2023 TDSummary of AIDA 24cm x 8cm 'triple' DSSSD tests   Summary_of_AIDA_tests_2022-3_-_Dec_2023.pdfSummary_of_AIDA_tests_2022-3_-_Dec_2023.pptx 
ELOG V3.1.4-unknown