ID |
Date |
Author |
Subject |
Text |
|
14
|
Fri Sep 8 19:03:23 2017 |
TD | w26 network configuration |
Network configuration files for workstation
w26 (Sun Ultra 45)
|
12x |
97
|
Sat Nov 11 05:49:00 2017 |
AM & MD | run 88 | Header: 3.99 MeV/u and CH2_30+25.
Ender:
====================================================
|
|
79
|
Fri Nov 10 01:29:51 2017 |
ASM, MD, DK | run 75 | Header: 4.7 MeV/u and C_09. PS back, but need
to check how much beam actually there was
before next issue
|
|
126
|
Sun Nov 12 18:32:52 2017 |
MB DK | run 112 | Header: 4.4 MeV/u CH2_16 sample
Ender:
====================================================
|
|
125
|
Sun Nov 12 17:44:49 2017 |
MB DK RG | run 111 | Header: empty target, 4.4 MeV/u
Ender: End
====================================================
|
|
78
|
Thu Nov 9 23:10:38 2017 |
MD | preparation for Carbon C_09 (Run 75) | 10/11/17: 00:03
switch target ladder to Pos #5: 82.44 mm
|
|
108
|
Sat Nov 11 17:36:54 2017 |
ASM | more halflife stuff | Fitting those half life data more reasonably...
fitted the decay curve with y=a*exp(-b*t)+c
to all the data points, comes up with t1/2=(85.8+/-2.6)s |
|
28
|
Thu Sep 28 03:38:18 2017 |
dk | heavy ion degrader foil - updated | --original email text--
Using Claudia's code, I added a layer of
Al foil before the heavy ion
|
8x |
33
|
Thu Oct 19 14:41:19 2017 |
daid | heavy ion degrader foil - full / new | See entry https://elog.ph.ed.ac.uk/ISOLDE/28
for a full description, but editing the same
elog is altering attachment numbers etc.
|
8x |
Draft
|
Thu Sep 28 03:34:20 2017 |
dk | heavy ion degrader foil |
--text from email--
Using Claudia's code, I added a layer of |
|
107
|
Sat Nov 11 17:19:54 2017 |
ASM, CL, TD... | halflife | Placed a hand held rad monitor near the
faraday cup and took rate readings every
20 seconds, right after inserting the gate |
|
40
|
Mon Nov 6 10:50:33 2017 |
Peter Black | foil mount drawings | |
|
19
|
Thu Sep 14 09:47:02 2017 |
dk | discussion with beam operators | CERN side
Faraday cup at the end of SEC, ideally
with automated control to insert and remove
|
|
43
|
Mon Nov 6 16:12:47 2017 |
Peter Black | chamber drawings | work in progress. |
|
41
|
Mon Nov 6 10:52:58 2017 |
Peter Black | alignment hardware drawings | |
|
22
|
Thu Sep 14 14:07:21 2017 |
pb | alignment | Chat with survey team
1. mauf plugs for both ends of
chamber with concentric 8mmH7 holes, with |
|
186
|
Thu Aug 23 18:23:27 2018 |
DK | Where to find (our) stuff at ISOLDE | =Overview=
Shoes, hard hats, 'underpants', spiders, |
|
187
|
Thu Aug 23 18:57:15 2018 |
DK | What daid is taking from ISOLDE to Edinburgh | 1 bolt for chamber stand structure, for reference
for new struts.
|
|
3
|
Sun Feb 19 12:22:16 2017 |
td, md | Vacuum and detector test | ------17.2.17 ------------------------------------------------------
closing chamber
|
|
16
|
Sat Sep 9 09:39:38 2017 |
Claudia | Vacuum Readings at ISOLDE Hall | Thursday, 7th September:
Vaccum after pumping all night
preamps off, chiller off |
|