65
|
Thu Nov 9 10:15:38 2017 |
Sarah Lonsdale | Run 61 |
Header: 5.0 MeV/u and Carbon (C_25).
Ender:
====================================================
Run number : 61
Date : 9 / 11
Start time : 11:19
Stop time : 12:04
Trigger rate (MIDAS) : 1205
Blocks written : 482
——————————————————————————————
Run Scalars (approx rates)
0- Ungated : 500
1- Gated : 100
2- dE : 5
3- E : 5
4- HI : 2
5- Pulser : 400
——————————————————————————————
Beam energy : 5.0 MeV/u
Beam intensity : 1.5 to 2.0 epA **
Target : #3 C_25
Ladder position : 112.78 mm
HI Degrader foil (um) : 15 um Al
——————————————————————————————
del_E voltage (V) : -32.0 V
del_E leakage (uA) : 0.085 uA
E voltage (V) : -350 V
E leakage (uA) : 1.73 uA
E_hi voltage (V) : -14 V
E_hi leakage (uA) : 0.825 uA
——————————————————————————————
PA power (upstream, positive) : 1.55 A
PA power (upstream, negative) : 0.55 A
PA power (downstream, positive) : 0.8 A
PA power (downstream, negative) : 0.28 A
——————————————————————————————
Pressure (IMG1) : 7.2 x 10^-6 mbar
Pressure (old gauge) : 2.1 x 10^-5 mbar
Pressure (SEC) : 3.9 x 10^-6 mbar
——————————————————————————————
Temp (Chiller) : -10.0 deg
Temp (chamber) : 5.5 deg
——————————————————————————————
Comments:
==================================================== |
|
64
|
Thu Nov 9 09:49:03 2017 |
Sarah Lonsdale | Run 60 |
Header: 5.0 MeV/u and Empty Frame. Tuned beam to lower scatter, solved dE counting issue. Pulser scaler has been added.
Ender:
====================================================
Run number : 60
Date : 9 / 11
Start time : 10:50
Stop time : 11:14
Trigger rate (MIDAS) : 20
Blocks written : 180
——————————————————————————————
Beam energy : 5.0 MeV/u
Beam intensity : 1.5 to 2.0 epA **
Target : #7 Empty Frame
Ladder position : 52.09 mm
HI Degrader foil (um) : 15 um Al
——————————————————————————————
del_E voltage (V) : -32.0 V
del_E leakage (uA) : 0.085 uA
E voltage (V) : -350 V
E leakage (uA) : 1.73 uA
E_hi voltage (V) : -14 V
E_hi leakage (uA) : 0.825 uA
——————————————————————————————
PA power (upstream, positive) : 1.55 A
PA power (upstream, negative) : 0.55 A
PA power (downstream, positive) : 0.8 A
PA power (downstream, negative) : 0.28 A
——————————————————————————————
Pressure (IMG1) : 7.2 x 10^-6 mbar
Pressure (old gauge) : 2.1 x 10^-5 mbar
Pressure (SEC) : 3.9 x 10^-6 mbar
——————————————————————————————
Temp (Chiller) : -10.0 deg
Temp (chamber) : 5.5 deg
——————————————————————————————
Comments:
==================================================== |
|
62
|
Thu Nov 9 08:20:21 2017 |
Claudia | Restarting Target Current & Line Current |
0) If target or line drop, STOP THE BEAM!!
1) If you SEE target or line current go down (top right window of monitors next to the corridor):
Use Knobs open application (monitor below); remember set value; type 0 in set window; click Mode - Reset; click Mode - On. increase current in steps of 100 A
2) If Target or line current off and it happened a while ago
Use Knobs open application (monitor below); type 0 in set window; click Mode - Reset; click Mode - On Use Isolde Target heating GPs application (in monitor below); |
|
61
|
Thu Nov 9 07:15:49 2017 |
MD | Tips for Babysitting ISOLDE during shifts |
from ISOLDE webpage |
|
60
|
Thu Nov 9 06:30:35 2017 |
Daid, Mirco | Spectra (Shift 1) |
Screen shots for accumulated data before the target went down. Should be (at least) runs 53 & 54 inclusive, possibly back to the start of RI beam on CH2 target. |
|
59
|
Thu Nov 9 06:02:41 2017 |
Daid. Mirco | Run 57 |
Header: Continue with 5.0 MeV/u and CH2. Laser back on.
Ender:
====================================================
Run number : 57
Date : 9 / 11
Start time : 06:55
Stop time :
Trigger rate (MIDAS) : 2078
Blocks written :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy : 5.0 MeV/u
Beam intensity : 1.5 to 2.0 epA
Target : #2 CH2
Ladder position : 127.95 mm
HI Degrader foil (um) : 15 um Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -32.0 V
del_E leakage (uA) : 0.025 uA
E voltage (V) : -350 V
E leakage (uA) : 1.735 uA
E_hi voltage (V) : -14 V
E_hi leakage (uA) : 0.825 uA
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (upstream, positive) : 1.55 A
PA power (upstream, negative) : 0.55 A
PA power (downstream, positive) : 0.8 A
PA power (downstream, negative) : 0.28 A
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) : 7.4 x 10^-6 mbar
Pressure (old gauge) : 2.2 x 10^-5 mbar
Pressure (SEC) : 3.9 x 10^-6 mbar
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) : -10.0 deg
Temp (chamber) : 5.5 deg
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments:
==================================================== |
|
58
|
Thu Nov 9 05:35:44 2017 |
Daid. Mirco | Run 56 |
Header: 5.0 MeV/u CH2, Laser 2 is turned off on purpose to check background.
Ender: Could not see many real events beside pulser and current was very low
====================================================
Run number : 56
Date : 9 Nov 2017
Start time : 06:34:45
Stop time : 06:54:37
Trigger rate (MIDAS) : 2030
Blocks written : 2488
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy : 5.0 MeV/u
Beam intensity : (cannot be measured)
Target : #2 CH2_16 (450~480 ug/cm^2)
Ladder position : 127.95 mm
HI Degrader foil (um) : 15 um Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -32 V
del_E leakage (uA) : 0.025 uA
E voltage (V) : -350 V
E leakage (uA) : 1.735 uA
E_hi voltage (V) : -14 V
E_hi leakage (uA) : 0.825 uA
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (upstream, positive) : 1.53 A
PA power (upstream, negative) : -0.55 A
PA power (downstream, positive) : 0.8 A
PA power (downstream, negative) : -0.28 A
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) : 7.4 x 10^-6 mbar
Pressure (old gauge) : 2.2 x 10^-5 mbar
Pressure (SEC) : 3.9 x 10^-6 mbar
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) : - 10.1 deg
Temp (chamber) : + 5.5 deg
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
comment: Why is the trigger rate nearly the same with the laser on and off ??!! |
|
57
|
Thu Nov 9 05:33:50 2017 |
TD | Charge State Distributions |
> Faraday cup readout at the end of our chamber should change based on whether or not the target is in and also the 59Cu
beam energy.
>
> The effect could be as much as 10 to 20%. At some point, we should check the Faraday cup reading with the CH2 target
and with the empty target.
For comparison, csd predicts 5.00MeV/u 59Cu?+ -> 4.66MeV/u 59Cu24+ following the 0.5mg/cm2 (CH2)n target
w29> csd
Charge State Distributions in Solid and Gaseous Targets
Is target solid(1) or gaseous(2) ? 1
Enter energy (MeV), mass (amu) and charge of ion: 275 59 29
Enter minimum and maximum charge states: 1 29
Energy: 275.0 QNOT: 24.1 RHO: 1.3 EPS: -64.6
Charge %
1 0.0
2 0.0
3 0.0
4 0.0
5 0.0
6 0.0
7 0.0
8 0.0
9 0.0
10 0.0
11 0.0
12 0.0
13 0.0
14 0.0
15 0.0
16 0.0
17 0.0
18 0.0
19 0.1
20 0.5
21 2.7
22 9.6
23 21.9
24 30.3
25 23.6
26 9.4
27 1.7
28 0.1
29 0.0
Options available:
end(1) , medium(2) , ion(3) , charge states(4) |
|
56
|
Thu Nov 9 03:32:55 2017 |
Daid. Mirco | Run 55 |
Header: Continue 5.0 MeV/u with CH2 after target re-heating
Ender: End
====================================================
Run number : 55
Date : 9 Nov 2017
Start time : 04:32
Stop time : 06:34
Trigger rate (MIDAS) : 2081
Blocks written : 16180
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy : 5.0 MeV/u
Beam intensity : ~2 epA -> (2*10^-12)/(24*1.602*10^-19) = 520833 pps
NB: See https://elog.ph.ed.ac.uk/ISOLDE/54 for factor 24 rather than 20 (theoretical estimate)
Target : #2 CH2_16 (450~480 ug/cm^2)
Ladder position : 127.95 mm
HI Degrader foil (um) : 15 um Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -32 V
del_E leakage (uA) : 0.02 uA
E voltage (V) : -350 V
E leakage (uA) : 1.75 uA
E_hi voltage (V) : -14 V
E_hi leakage (uA) : 0.82 uA
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (upstream, positive) : 1.52 A
PA power (upstream, negative) : 0.55 A
PA power (downstream, positive) : 0.8 A
PA power (downstream, negative) : 0.32 A
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) : 7.5 x 10^-6 mbar
Pressure (old gauge) : 2.3 x 10^-5 mbar
Pressure (SEC) : 4.0 x 10^-6 mbar
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) : -10.0 deg
Temp (chamber) : +5.4 deg
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments: First laser does not have a red peak at the center, but maybe okay for this shift.
Attaching PSB and GPS screenshots, as we need to monitor them regularly.
At 6:18 to 6:40, we started getting four rings from the PS Booster. The 1st ring had a fairly low intensity, and the operators later dropped it. These times were confirmed
exactly with communication with PS operators.
again.
==================================================== |
|
55
|
Thu Nov 9 01:24:01 2017 |
Daid. Mirco | Run 54 |
Header: Continue with 5.0 MeV/u and CH2
Ender: Checked control room, about 2:40. Target current is 2 A (low...should be 430 A). No beam seen at our FC, although MIDAS seemed to have events.
NB: You can monitor the target current on any network computer via: https://op-webtools.web.cern.ch/Vistar/vistars.php?usr=GPS
====================================================
Run number : 54
Date : 9 Nov 2017
Start time : 02:24:23
Stop time : 03:02
Trigger rate (MIDAS) : 2181
Blocks written : 8749
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy : 5.0 MeV/u
Beam intensity :
Target : #2 CH2_16 ( 450 ~ 480 ug/cm^2)
Ladder position : 127.95 mm
HI Degrader foil (um) : 15 um Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -32 V
del_E leakage (uA) : 0.015 uA
E voltage (V) : -350 V
E leakage (uA) : 1.77 uA
E_hi voltage (V) : -14 V
E_hi leakage (uA) : 0.82 uA
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (upstream, positive) : 1.55 A
PA power (upstream, negative) : 0.55 A
PA power (downstream, positive) : 0.8 A
PA power (downstream, negative) : 0.3 A
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) : 7.75 x 10^-6 mbar
Pressure (old gauge) : 2.5 x 10^-5 mbar
Pressure (SEC) : 4.1 x 10^-6 mbar
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) : -10.1 deg
Temp (chamber) : 5.5 deg
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments:
==================================================== |
|
54
|
Wed Nov 8 23:46:32 2017 |
Daid | Charge State Distributions |
Faraday cup readout at the end of our chamber should change based on whether or not the target is in and also the 59Cu beam energy.
The effect could be as much as 10 to 20%. At some point, we should check the Faraday cup reading with the CH2 target and with the empty target. |
|
53
|
Wed Nov 8 23:14:38 2017 |
Daid, Ruchi, Mirco | Run 53 |
Header: Restart 5.0 MeV/u w/ CH2 after PS comes back (3 rings until the morning)
Ender: End
====================================================
Run number : 53
Date : 9 Nov 2017
Start time : 00:13:50
Stop time : 02:23:31
Trigger rate (MIDAS) : 2193
Blocks written : 31000
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy : 5.0 MeV/u
Beam intensity : < 6 x 10^5 pps
Target : #2 CH2_16 (450~480 ug/cm^2)
Ladder position : 127.95
Degrader foil (um) : 15 um Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -32.5 V
del_E leakage (uA) : 0.005 uA
E voltage (V) : -350 V
E leakage (uA) : 1.82 uA
E_hi voltage (V) : -14 V
E_hi leakage (uA) : 0.82 uA
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (upstream, positive) : 1.55 A
PA power (upstream, negative) : 0.55 A
PA power (downstream, positive) : 0.8 A
PA power (downstream, negative) : 0.3 A
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) : 8.05 x 10^-6 mbar
Pressure (old gauge) : 2.5 x 10^-5 mbar
Pressure (SEC) : 4.2 x 10^-6 mbar
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) : -10.0
Temp (chamber) : +5.5
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments:
==================================================== |
|
52
|
Wed Nov 8 23:06:48 2017 |
Daid, Ruchi | Run 52 (junk) |
(Junk -- see comments)
====================================================
Run number : 52
Date : 9 Nov 2017
Start time :
Stop time :
Trigger rate (MIDAS) :
Blocks written :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy :
Beam intensity :
Target :
Ladder position :
Degrader foil (um) :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) :
del_E leakage (uA) :
E voltage (V) :
E leakage (uA) :
E_hi voltage (V) :
E_hi leakage (uA) :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) :
Pressure (old gauge) :
Pressure (SEC) :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) :
Temp (chamber) :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments: 2 minutes after run starts, PS-Booster calls. They will go back to 3 rings, giving us the beam back in ten minutes
==================================================== |
|
51
|
Wed Nov 8 22:21:35 2017 |
Ruchi | Beam transmission |
By the end of beam tuning (around 6pm), beam transmission between Faraday cups at the end of SEC and at end of Edinburgh chamber:
~100% through 10mm collimator (empty target frame)
> 50% thought 3mm collimator
|
|
50
|
Wed Nov 8 22:08:55 2017 |
Daid | Run 51 |
Header: Restart 5.0 MeV/u CH2 with 3 PS rings.
Ender: Stop run. We want good data with a smaller file size for fast analysis, as well as to get on a 2 hour schedule.
====================================================
Run number : 51
Date : 8 Nov 2017
Start time : 22:44
Stop time : 00:04
Trigger rate (MIDAS) : 2192
Blocks written : 20460
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy : 5.0 MeV/u
Beam intensity : (was 6 x 10^5, but we have only 3 /4 PS-Booster rings)
Target : #2 CH2_16
Ladder position : 127.95
Degrader foil (um) : 15 um Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -33
del_E leakage (uA) : 0.00
E voltage (V) : -350
E leakage (uA) : 1.87
E_hi voltage (V) : -14
E_hi leakage (uA) : 0.83
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) : 8.25 x 10^-6 mbar
Pressure (old gauge) : 2.6 x 10^-5 mbar
Pressure (SEC) : 4.3 x 10^-6 mbar
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) : -9.8
Temp (chamber) : +6.0
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments: Only 3 out of 4 rings at PS-Booster for now
(We stopped slightly from miscommunication.)
23:34: PS-Booster calls. Trying to add Ring 1 back. By 23:36 we can see all four rings. (In one supercycle, all rings drop.)
==================================================== |
|
49
|
Wed Nov 8 22:00:00 2017 |
daid | Scalars |
Present scalars:
0: Ungated
1: Gated
2: dE
3: E
4: HI
5: Pulser
6: 1 kHz Clock
To add: |
|
48
|
Wed Nov 8 21:21:31 2017 |
Ruchi Garg, Daid | RunLogTemplate |
Header:
Ender:
====================================================
Run number :
Date :
Start time :
Stop time :
Trigger rate (MIDAS) :
Blocks written :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalers (approx rates)
0- Ungated :
1- Gated :
2- dE :
3- E :
4- HI :
5- Pulser :
6- Clock :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u) :
Beam intensity (epA) :
Target :
Ladder position (mm) :
HI Degrader foil (um) :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) :
del_E leakage (uA) :
E voltage (V) :
E leakage (uA) :
E_hi voltage (V) :
E_hi leakage (uA) :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive) (A) :
PA power (Up, negative) (A) :
PA power (Down, positive) (A) :
PA power (Down, negative) (A) :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) (mbar) :
Pressure (old gauge) (mbar) :
Pressure (SEC) (mbar) :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) deg :
Temp (chamber) deg :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments:
==================================================== |
|
47
|
Wed Nov 8 20:46:23 2017 |
Daid, Ruchi | Run 50 |
Header: First run with irises open. 30 min run.
Ender: Call from PS-Booster. Stop run.
Date: 8 Nov 2017
Start: 21:46
Stop: 22:18
Target #2: Position 127.95 mm; CH2_16: 450~480 ug/cm^2.
59Cu beam is on. Nominal intensity was 6 x 10^5 pps. 5.0 MeV/u.
**Iris are all open.**
Biases (leak currents did not change opening the irises)
dE: -33 V; 0.00 uA
E: -350 V; 1.99 uA
HI: -14 V; 0.86 uA
Pulsers are in.
Positive: 2 Hz, 1.4 V.
Negative: Low freq, 1200 setting.
Scalars 0 and 1 (see https://elog.ph.ed.ac.uk/ISOLDE/49 ) were in at the beginning of the run. Scalar 2 was added part way through. LEMO cables were not long enough to add 3 &
4 until after the run was stopped (swapped short cables for longer ones elsewhere.)
Scalar 0 was showing a number of multiple hits. It was directly from the Fan In / Fan Out. At the end of the run, I switched it to the Lecroy 622 which has a larger width.
We stopped because the PS-Booster called about cleaning one of the rings. (At first I misunderstood exactly what was going on or who called, but I stopped.) |
|
46
|
Wed Nov 8 20:40:33 2017 |
Daid, Ruchi | Run 49 |
Header: First test with RIB. Irises closed.
End: End
~21:45
8 Nov 2017
Target #2: Position 127.95 mm; CH2_16: 450~480 ug/cm^2.
59Cu beam is on. Nominal intensity was 6 x 10^5 pps. 5.0 MeV/u.
**Iris are all closed.**
Biases:
dE: -33 V; 0.00 uA
E: -350 V; 1.99 uA
HI: -14 V; 0.86 uA |
|
45
|
Wed Nov 8 17:12:01 2017 |
TD | MIDAS logs |
Attachment 1 - snoop -d bge1 log following MVME CPU reset
Attachment 2 - VME CPU system console
Fixed MVME2354 CPU RPC timeout when mounting MIDAS filesytem (see attachment 2)
by changing Sun workstation name services configuration file /etc/nsswitch.conf
to remove dns i.e. from
hosts: files dns
ipnodes: files dns
to
hosts: files
ipnodes: files
*Why* this works is a good question ... |