AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  nTOFCapture, Page 3 of 4  ELOG logo
Entry  Thu Jun 15 09:57:01 2023, Annie, Si Set Up 12x

Si Set up images and documentation.

Detector 1 - C6D6D: Distance= 9 cm, Angle= 135 deg relative to BL (check set up pdf for drawing if unsure), Voltage= 1550 V

Detector 2 - C6D6E: Distance= 9 cm, Angle= 135 deg relative to BL, Voltage= 1590 V

Detector 3 - C6D6H: Distance= 9 cm, Angle= 135 deg relative to BL, Voltage= 1450 V

Detector 4 - C6D6L: Distance= 9 cm, Angle= 135 deg relative to BL, Voltage= 1460 V

 

Note: Voltages were increased by 30V after the first few runs, these voltages are titled as "new voltages" in the DAQ when they were being tried out, and are now the final voltages.

 

 

Entry  Tue Apr 11 14:07:43 2023, Claudia, Photos of the Zn68 measurement setup IMG_20180409_204846530_LL.jpgIMG_20180409_204854032_LL.jpgIMG_20180410_180042179_LL.jpgIMG_20180411_140834699_LL.jpgZn68measurement.jpg

Photos of the  68Zn(n,gamma) measuremement setup at n_TOF EAR-1.

Entry  Fri Jul 29 17:21:47 2022, Ragan, Enriched Si-30 IMG_2692.jpgIMG_2693.jpg

Attached are the pictures of enriched Si-30 metal pieces.

Entry  Sat Mar 19 17:29:43 2022, Nikolay Sosnin, Al26 Experimental Inventory at n_TOF Al26_Inventory.pdf

Three aluminium crates contain 26Al(n, alpha) kit from EAR2, and was in the barracks (building 6547) near detector lab by EAR1 entrance. A list is attached and photos can be found on Dropbox:

https://www.dropbox.com/sh/68k1xove2zr1bmj/AADKvN8wR_Ia2EwZMOXZqdMCa?dl=0

Entry  Mon Jan 25 16:11:54 2021, Nikolay Sosnin, 25.01.2021: Cross-section Calculation Update Unresolved_Normalization_1.pptx
 
Entry  Mon Oct 5 15:01:04 2020, RG, Monday meeting slides: 05 Oct 2020_10_05_SummarySoFar.pdf

Summary of work done so far.

Entry  Mon Oct 5 14:54:55 2020, Nikolay Sosnin, Overall Progress: Monday Meeting 05.10.2020 Selenium_Data.pptx
 
Entry  Fri Oct 2 14:01:24 2020, RG, Monday meeting slides: 28 Sep 2020_09_28.pdf

Further investigation into dedicated and parasitic discrepancy.

Entry  Fri Oct 2 13:59:05 2020, RG, Monday meeting slides: 21 Sep 2020_09_21.pdf

Dedicated and parasitic discrepancy (Au 5eV resonance plateau) - quantified.

Flux and E_exc numalisation after sum WF.

Entry  Fri Oct 2 13:55:52 2020, RG, Monday meeting slides: 14 Sep 2020_09_14.pdf

Discrepancy between dedicated and parasitic pulses histograms in the 5eV gold resonance plateau region.

Corrected tof to En conversion.

E_excitation and flux normalisation of yield.

Entry  Fri Oct 2 13:47:59 2020, RG, Monday meeting slides: 07 Sep 2020_09_07.pdf

Proton consistency test (BCT, SiMon, weighted, unweigted, dedicated, parasitic) - Au cal1 and Se78
BG subtraction
TOF to En conversion
 

Entry  Tue Sep 29 18:36:03 2020, Nikolay Sosnin, SAMMY Fits to Known Se77 Resonances: Meeting 28.09.2020 SAMMY_Fits_Se77.pptx
 
Entry  Mon Sep 14 13:47:26 2020, Nikolay Sosnin, Summed WF: Monday Meeting 14.09.2020 Sum_Spectra.pptx
 
Entry  Mon Sep 7 13:57:28 2020, Nikolay Sosnin, SAMMY Fits Au197: Monday Meeting 07.08.2020 SAMMY_Gold.pptx
 
Entry  Fri Aug 7 10:57:10 2020, Ruchi, Monday meeting slides: 03 Aug 2020_08_03.pdf
 
Entry  Fri Aug 7 10:56:03 2020, Ruchi, Monday meeting slides: 27 Jul 2020_07_27.pdf
 
Entry  Fri Aug 7 10:55:43 2020, Ruchi, Monday meeting slides: 20 Jul 2020_07_20.pdf
 
Entry  Fri Aug 7 10:53:14 2020, Ruchi, Monday meeting slides: 13 Jul 2020_07_13.pdf
 
Entry  Fri Aug 7 10:50:57 2020, Ruchi, Monday meeting slides: 06 Jul 2020_07_06.pdf
 
Entry  Fri Aug 7 10:39:18 2020, Ruchi, TTOFSort processing macro and files path 

/eos/user/r/rugarg/public/2017_10_ng_ZnSe/

Latest 4 processing scripts:
1. process_runs_Au1_Jul20.C = Au runs (Se78 part), empty holder runs (Se78 part), and beam-off runs (Se78 part) processed with Au weighting function and set1 of calibration parameters.
2. process_runs_Au2_Jul20.C = Au runs (Se77 part), empty holder runs (Se77 part), and beam-off runs (Se77 part) processed with Au weighting function and set2 of calibration parameters.
3. process_runs_Se78_Jul20.C = Se78 runs, empty holder runs, beam-off runs, C runs, and filter runs processed with Se78 weighting function and set1 of calibration parameters.
4. process_runs_Se77_Jul20.C = Se77 runs, empty holder runs, beam-off runs, and filter runs processed with Se77 weighting function and set2 of calibration parameters.

ELOG V3.1.4-unknown