AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  nToF, Page 1 of 4  ELOG logo
ID Date Author Subjectdown Text Attachments
  44   Mon Jul 31 10:21:41 2023 Nikolay Sosninn_TOF Data and Filtering   Al26_Filtering.pptx 
  30   Thu Oct 6 09:34:30 2022 ClaudiaTest setup Photos and cablingSetup 5.10.22

dE 20 um (ID 2837-33) and 494 um
double sided (ID 1194-9)
 20221005_174742.jpg20221005_174759.jpg20221005_184752.jpg20221005_184801.jpg20221005_174742.jpg 
  51   Thu Aug 10 11:30:32 2023 Nikolay SosninSilicons and LiF3+Gafchromic Target   18x 
  36   Sat Oct 8 11:56:49 2022 Nikolay SosninSilicon Strips of ConcernDEED 6 and 9 no signal throughout the campaign.

EFED 27 high oscillations in baseline
throughout the campaign.
  
  58   Fri Aug 11 13:06:54 2023 AnnieSignal Spreadsheet infoSpreadhseet made for shifters to manually
enter that they have checked each signal
and that they can see gamma-flashes. It is
 IMG_2920.JPGIMG_2921.JPGIMG_2922.JPG 
  26   Fri Sep 2 12:03:40 2016 SarahSPD card changed14 bit card replaced for DEED 9-12, to
prevent issue with pulser arriving before
gamma flash.
  
  62   Mon Aug 14 11:00:13 2023 TDRAL108 +/-15V PSU test in ISOLDE hall
This morning 2x RAL108 +/-15V PSUs were borrowed
from the Edinburgh equipment in the ISOLDE
 13x 
  63   Tue Aug 15 10:17:39 2023 TD, NSRAL108 +/-15V PSU test at EAR2, n_TOF Monday 14 AugustOn the morning of Monday 14 August 2x RAL108
+/-15V PSUs were borrowed from the Edinburgh
equipment in the ISOLDE hall to check whether
 7x 
  67   Mon Aug 21 12:08:59 2023 TDRAL108 +/-15V PSU test - JCMB 21.8.23PSU Calex

Setup, PSU and ac mains filter - attachments
 13x 
  66   Sat Aug 19 14:14:26 2023 TDRAL108 +/-15V PSU test - JCMB 18.8.23PSU Calex

Setup and PSU details - attachments 1-3
 10x 
  54   Fri Aug 11 09:11:04 2023 AnniePulse Settings   IMG_2908.JPGIMG_2909.JPGIMG_2910.JPGIMG_2911.JPG 
  57   Fri Aug 11 10:12:02 2023 AnniePressure, voltage and current check   IMG_2915.JPGIMG_2916.JPGIMG_2918.JPG 
  5   Tue Oct 13 21:04:49 2015 Claudia LedererPhotos of Test Setup 5-10 October 2015some photos in high resolution of the test
setup 5-10 October 2015
 DSC00042.JPGDSC00048.JPGDSC00056.JPGDSC00065.JPG 
  47   Thu Aug 10 09:55:50 2023 CLWPhotos of Chamber, Al26 Run Aug23   13x 
  48   Thu Aug 10 10:04:13 2023 CLWPhotos inside chamber Al26 run Aug2023   8x 
  52   Thu Aug 10 16:11:57 2023 TD, NS, ARNoise
Observe c. 2mV p to p noise with DSO ( Z_in
= 50 Ohm ) c. 60us period with HF structure.
 20230810_162959.JPGIMG_2906.jpeg20230810_164219.JPG 
  56   Fri Aug 11 10:02:08 2023 TD, NS, ARNoise
Check RAL108 +/-15V PSU
 20230811_104233.jpg20230811_104253.jpg 
  64   Tue Aug 15 11:41:27 2023 TD, NSMonday 14 August - vacuum chamber pressure
08.35 Vacuum chamber pressure OK - see attachment
1
 20230814_083514.jpg 
  72   Thu Dec 7 09:48:23 2023 EmmanuelMWDdetector and User InputMWDdetector and UserInput  UserInput_Silicons.hMWDdetector.cc 
  74   Tue Apr 16 12:24:01 2024 EmmanuelMWD amplitude (dE and E)   26Al_PDF.pdf 
ELOG V3.1.4-unknown