AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  BRIKEN, Page 11 of 21  ELOG logo
ID Date Author Subject Text Attachments
  215   Wed Mar 29 18:42:25 2017 RCF40Mg Run 003
 Date: 30/03/2017
 201703300252-SyncScreenshot.png201703300307-SyncScreenshot.png 
  214   Wed Mar 29 18:16:58 2017 RCF40Mg Run 002
Date: 30/03/2017
 201703300234-SyncScreenshot.png 
  213   Wed Mar 29 17:15:21 2017 JLTNew Config fileNew configuration file:
170330_Conf_BrikenFull.xlsx
  
  212   Wed Mar 29 15:16:17 2017 Many40Mg Run 001Date: 29/03/2017

Start: 23:13
  
  211   Wed Mar 29 14:14:58 2017 Many40Mg RUN 000Date: 29/03/2017

Start: 22:13
  
  210   Wed Mar 29 13:31:37 2017 J Agramunt, R. Caballero, T. Davinson, C. Griffin, O. Hall, D. Kahl, G. Kiss, J. Liu, S. Nishimura, V. Phong, JL TainStart of parasiticStart of parasitic Ca beam
(main experiment "New isotope search", Ahn
et al.)
 170329_Conf_BrikenFull.xlsx 
  209   Wed Mar 29 11:02:40 2017 PV, Liu, JA, JLTF11 plasticNew calibration of F11 plastic

We decided to have both a low gain and a
  
  208   Wed Mar 29 07:34:16 2017 J. AgramuntBrikenTools repository installed at d05The last version of Briken tools repository
has ben installed at d05, this repository
includes the Merger and the BrikenOffline
  
  207   Wed Mar 29 03:02:02 2017 J. AgramuntSynchronization test procedure (update) To Launch the processes:

Open 4 terminals:
  
  206   Tue Mar 28 17:02:19 2017 DKApplying BiasesToday, Gabor and I discussed with Nathan from
ORNL about the biasing system used for Ge,
3He, Plastic, and others.  Phong is also
  
  205   Tue Mar 28 09:10:09 2017 Many152Eu152Eu source inside BRIKEN for CLOVER calibration.
Also calibration of Si-dE with 60Co source
and AIDA_PL calibration  with 60Co source.
 170328_1707_152Eu_CloverCal.root170328_1707_CloverCalibration.ods 
  204   Tue Mar 28 06:56:15 2017 PV, Liu, JA, JLTF11 PlasticCalibration of new F11 plastic
(see photo)
 170328_1507_F11_PL_RandL.pdf170328_1838_F11PLCal.pdfNewF11Plastic.jpg 
  203   Mon Mar 27 11:53:15 2017 PV,LiuTurn on dE detectorWe applied a bias voltage of 100 V to the
dE detector

Current read = 0.660 uA
 1_top_60co.png2_top_noiselvl.png3_bottom_60co.png4_bottom_noiselvl.png 
  202   Mon Mar 27 09:32:55 2017 JLT JA CG OH DK TD RC VP GK LJ SN252Cf252Cf at the center for BRIKEN calibration

 170327_1800_252Cf.pdf170327_1800_252Cf.root170327_1800_252Cf_Cal.ods 
  201   Mon Mar 27 03:50:13 2017 JLT JA CG OH DK TD RC VP SNBackgroundBackground measurement while they play with
the beam.
 170327_1640_Background.pdf 
  200   Sat Mar 25 13:42:23 2017 JL Tain, J Agramunt, V. Phong, C. Griffin, O. Hall, S. Nishimura, R. CaballeroBackgroundBRIKEN system powered and DACQ started after
movement.
All looks fine.
 170325_2224_Background.pdf 
  199   Sat Mar 25 13:33:12 2017 JL Tain, J Agramunt, V. Phong, C. Griffin, O. Hall, S. Nishimura, R. CaballeroBRIKEN+AIDA relocatedWe moved AIDA+BRIKEN by 107cm upstream.
See attached photos.
 NewLocation1.jpgNewLocation2.jpg 
  198   Fri Mar 24 03:28:39 2017 JL Tain, J Agramunt, V. Phong, C. Griffin, O. Hall, S. NishimuraBackgroundBackground measurement overnight

Start: 19:45
 170324_1040_BackgroundOvernight.pdf 
  197   Thu Mar 23 10:03:51 2017 JL Tain, J Agramunt, V. Phong, C. Griffin, O. Hall, S. Nishimura252Cf252Cf source at the center for calibration

23/03/2017
 170323_1902_1938_252Cf.pdf 
  195   Thu Mar 23 09:30:58 2017 JL Tain, J Agramunt, V. Phong, C. Griffin, O. Hall, S. NishimuraPower-up and 1st spectrumCrates powered up.
DACQ started.
New directory: /data/1703Preparation/
 170323_1841Background.pdf 
ELOG V3.1.4-unknown