|
ID |
Date |
Author |
Subject |
|
194
|
Thu Mar 23 09:04:38 2017 |
JL Tain, J Agramunt, V. Phong, C. Griffin, O. Hall, S. Nishimura | Remove EURICA rails |
We remove partially the floor rails of EURICA
to proof that it is possible to move BRIKEN + AIDA.
See attached photographs of the present status.
This will allow eventually to move both detectors by about
1 meter to have a better focus at the implantation position.
This movement could be done with a minimum of cable disconnection
using the wheels of both support tables. |
Attachment 1: Donwstream-EURICA-Rail.jpg
|
|
Attachment 2: Upstream-EURICA-Rail.jpg
|
|
Attachment 3: GeneralView.jpg
|
|
|
193
|
Thu Mar 23 09:01:33 2017 |
JL Tain, J Agramunt, V. Phong, C. Griffin, O. Hall, S. Nishimura | ELOG Start Preparation |
We started the preparation of 2017 campaign |
|
192
|
Fri Dec 9 05:25:26 2016 |
PV | Photo and schematic drawing of the Pb shielding in front of BRIKEN during Fallon experiment |
This Pb shielding structure is right behind the variable degrader |
Attachment 1: Schematic_PbShielding_FallonRun.pdf
|
|
Attachment 2: IMG_1414.JPG
|
|
|
191
|
Thu Dec 8 04:17:49 2016 |
PV | Installing BRIKEN ELOG 2016 in RIBF local network to a personal computer |
All the RIBF123 elog website (including Takechi and Fallon experiment) can be downloaded and installed from the following link:
https://drive.google.com/file/d/0B5rBCXKaAWNARVViSTBNSE80RzQ/view?usp=sharing
To run and view the elog website in your local computer (tested with Centos 7, it may work with Ubuntu or any other linux distro)
- Extract the downloaded file:
tar -xvzf elogBRIKEN2016.tar.gz
- Go to the extracted directory and execute make
cd elogBRIKEN2016
make
- Run elogd service:
./elogd start
then it will display:
elogd 3.1.2 built Dec 8 2016, 13:24:26 revision bd75964
CKeditor detected
ImageMagick detected
Indexing logbooks ...
Create empty password file "logbooks/ribf.passwd"
done
Server listening on port 3333 ...
- Go to your web browser, enter
http://localhost:3333
- It will ask you to register a new elog account, fill in your prefered information
Login name: |
|
(name may not contain blanks) |
Full name: |
|
Email: |
|
Password: |
|
Retype password: |
and press Save button
- Next, it will ask you to choose which logbook you want to subcribe, in this case we should choose: RIBF123, then press Save buttom at the top left connner (see attached photo)
- The experimental log should be displayed then. Select RIBF123.
Ubuntu 16
Please, update/install the following packages:
sudo apt-get install python-pip python-dev libffi-dev libssl-dev libxml2-dev libxslt1-dev libjpeg8-dev zlib1g-dev
|
Attachment 1: Screenshot_from_2016-12-08_13-30-16.png
|
|
|
190
|
Tue Nov 29 00:30:42 2016 |
PV,SN | Sillicon dE bias voltage increased |
We increase the bias voltage of the dE detector from 20 V to 100 V
Leakage current:
Before: ~0.590 uA
After 0.695 uA |
|
189
|
Mon Nov 28 16:18:07 2016 |
AE | DAQ synchronization |
Please see: https://elog.ph.ed.ac.uk/AIDA/493 |
|
188
|
Mon Nov 28 10:48:21 2016 |
JLT | Online analysis |
Comparison of current spectra with spectra from Takechi's run
(See attachment) |
Attachment 1: analysis-271116.pdf
|
|
|
187
|
Mon Nov 28 05:59:28 2016 |
briken | run |
======= START =======
Date 2016/11/28
Start time : 11:12
BRIKEN run : 056
Daq Conf. File : 161128Conf_BrikenFull.xlsx
DLT File name : 161128_1112
AIDA run : R28-0
AIDA start : 11:08
BigRIPS run : 1049
BigRIPS start : 09:15
---------------------------
Shifters: AT GK KD
======= Setup =======
Central fragment: 41Al @F8
--- Degraders ---
Fixed: 3mm Pb between Musics chambers
Included lead shieldings around the beam.
Variable:
1=(0.5mm W+1mm Al), 2=(0.3mm W+1mm Al), 3=(1mm W +1mm Al)
1. OUT
2. IN
3. IN
======= COMMENTS =======
09:13 Clover G7Red Plugged in again.
AIDAPL gain has been increased by SN from 900V to 1000V.
------ Rates ------
BRIKEN : Hz
F11R : Hz
Clovers : Hz
VPLT : Hz
VPLB : Hz
AIDAPL : Hz
========= END =========
Date 2016/11/28
BRIKEN run :
BRIKEN stop :
ROOT online :
AIDA run :
AIDA stop :
BigRIPS RUN : |
|
186
|
Mon Nov 28 01:22:50 2016 |
BRIKEN collaboration | Elog RIBF123 & BigRIPS |
Full RIB123 Elog entries for Takechi && Fallon parasitic experiments
Update:03Dec16
Instructions:
1) Download RIBF123FullEntries.tar.gz-part-aa and RIBF123FullEntries.tar.gz-part-ab
2) Join and uncompress the file on the terminal:
# cat RIBF123FullEntries.tar.gz-part-*| tar xz
3) cd RIBF123FullEntries
4) Open with a Browser ELOGRIBF123_161203_2030_fullWeb.html
-----------------------------------------------------------
HTML elogs for BigRIPS are found by unziping BigRIPSRunSummary.zip and EXPDBRunSummary.zip
-----------------------------------------------------------
The full elog is also included in pdf file. See:
ElogRIBF123_161203_2030_Full_part1.pdf
ElogRIBF123_161203_2030_Full_part2.pdf |
Attachment 1: BigRIPSRunSummary.zip
|
Attachment 2: EXPDBRunSummary.zip
|
Attachment 3: RIBF123FullEntries.tar.gz-part-aa
|
Attachment 4: RIBF123FullEntries.tar.gz-part-ab
|
Attachment 5: ElogRIBF123_161203_2030_Full_part1.pdf
|
|
Attachment 6: ElogRIBF123_161203_2030_Full_part2.pdf
|
|
|
185
|
Sun Nov 27 23:14:49 2016 |
BRIKEN coll | run 036 |
======= START =======
Date 2016/11/27
Start time : 19:28
BRIKEN run : 36
Daq Conf. File : 161125Conf_BrikenFull.xlsx
DLT File name : 161128_1928
AIDA run : R24
AIDA start : 19:28
BigRIPS run : 1034
BigRIPS start : 18:33
---------------------------
Shifters: PV, KG, TD
======= Setup =======
Central fragment: 41Al @F8
--- Degraders ---
Fixed: 3mm Pb between Veto plastics up and down + 1mm Al
Variable:
1=(0.5mm W+1mm Al), 2=(0.3mm W+1mm Al), 3=(1mm W +1mm Al)
1. IN
2. IN
3. OUT
======= COMMENTS =======
TimeStamp has been reset two times during this run.
ERROR! Data acquisition with errors during this ring because not restarted after Liquid Nitrogen refilling.
------ Rates ------
BRIKEN : Hz
F11R : Hz
Clovers : Hz
VPLT : Hz
VPLB : Hz
AIDAPL : Hz
========= END =========
Date 2016/11/27
BRIKEN run : 036
BRIKEN stop : 20:38
ROOT online : 161127_1928_036.root
AIDA run : R25_0
AIDA stop :
BigRIPS RUN : 1035 |
|
184
|
Sun Nov 27 11:23:54 2016 |
PV, GK, AE, TD | 40Mg. Run 35 |
======= START =======
Date 2016/11/27
Start time : 18:59
BRIKEN run : 035
Daq Conf. File : 161125Conf_BrikenFull.xlsx
DLT File name : 161127_1859
AIDA run : R23_0
AIDA start : 19:19
BigRIPS run : 40Mg-1034
BigRIPS start : 18:33
---------------------------
Shifters: PV, AE, GK, TD
======= Setup =======
Central fragment: 40Mg
--- Degraders ---
Fixed: 1mm Al + 3mm Pb attached to beam hole in BRIKEN PE shielding
Variable:
1=(0.5mm W+1mm Al), 2=(0.3mm W+1mm Al), 3=(1mm W +1mm Al)
1. IN
2. IN
3. OUT
======= COMMENTS =======
2016/11/27
19:19: There is a transient, AIDA DAQ found stopped due the incompleted LN2 filling.
------ Rates ------
BRIKEN : Hz
F11R : Hz
Clovers : Hz
VPLT : Hz
VPLB : Hz
AIDAPL : Hz
========= END =========
Date 2016/11/27
BRIKEN run : 035
BRIKEN stop : 19:23
ROOT online :
AIDA run : R23_4
AIDA stop : 19:19
BigRIPS RUN : 1034 |
|
183
|
Sun Nov 27 11:15:42 2016 |
PV, GK, AE, TD | 40Mg. Run 34 |
======= START =======
Date 2016/11/27
Start time : 17:29
BRIKEN run : 034
Daq Conf. File : 161125Conf_BrikenFull.xlsx
DLT File name : 161127_1729
AIDA run : R22_2
AIDA start : 17:29
BigRIPS run : 40Mg-1033
BigRIPS start : 17:24
---------------------------
Shifters: PV, AE, GK, TD
======= Setup =======
Central fragment: 40Mg
--- Degraders ---
Fixed: 1mm Al + 3mm Pb attached to beam hole in BRIKEN PE shielding
Variable:
1=(0.5mm W+1mm Al), 2=(0.3mm W+1mm Al), 3=(1mm W +1mm Al)
1. IN
2. IN
3. OUT
======= COMMENTS =======
2016/11/27
------ Rates ------
BRIKEN : Hz
F11R : Hz
Clovers : Hz
VPLT : Hz
VPLB : Hz
AIDAPL : Hz
========= END =========
Date 2016/11/27
BRIKEN run : 034
BRIKEN stop : 18:28
ROOT online :
AIDA run : R22_14
AIDA stop :
BigRIPS RUN : 1033 |
|
182
|
Sun Nov 27 11:07:02 2016 |
PV, GK, AE, TD | 40Mg. Run 33 - junk |
======= START =======
Date 2016/11/27
Start time : 17:17
BRIKEN run : 033
Daq Conf. File : 161125Conf_BrikenFull.xlsx
DLT File name : 161127_1717
AIDA run : R22_0
AIDA start : 17:17
BigRIPS run : 40Mg-1033 (and part of 40Mg-1032)
BigRIPS start : 17:24
---------------------------
Shifters: PV, AE, GK, TD
======= Setup =======
Central fragment: 40Mg
--- Degraders ---
Fixed: 1mm Al + 3mm Pb attached to beam hole in BRIKEN PE shielding
Variable:
1=(0.5mm W+1mm Al), 2=(0.3mm W+1mm Al), 3=(1mm W +1mm Al)
1. IN
2. IN
3. OUT
======= COMMENTS =======
2016/11/27
------ Rates ------
BRIKEN : Hz
F11R : Hz
Clovers : Hz
VPLT : Hz
VPLB : Hz
AIDAPL : Hz
========= END =========
Date 2016/11/27
BRIKEN run : 032
BRIKEN stop : 17:15
ROOT online :
AIDA run : R22_1
AIDA stop :
BigRIPS RUN : 1033 |
|
181
|
Sun Nov 27 10:47:20 2016 |
PV,TD,GK | 40Mg. Run 32 |
======= START =======
Date 2016/11/27
Start time : 16:20
BRIKEN run : 032
Daq Conf. File : 161125Conf_BrikenFull.xlsx
DLT File name : 161127_1620
AIDA run : R21_0
AIDA start : 16:19
BigRIPS run : 40Mg-1032
BigRIPS start : 16:20
---------------------------
Shifters: PV, TD, GK
======= Setup =======
Central fragment: 40Mg
--- Degraders ---
Fixed: 1mm Al + 3mm Pb attached to beam hole in BRIKEN PE shielding
Variable:
1=(0.5mm W+1mm Al), 2=(0.3mm W+1mm Al), 3=(1mm W +1mm Al)
1. IN
2. IN
3. OUT
======= COMMENTS =======
2016/11/27
~16:10: Beam Off for a while, we entered F11 area and attached 1mm Al degrader to the beam hole in BRIKEN PE
shielding, then start the new run
~17:00: AIDA merger stopped
------ Rates ------
BRIKEN : Hz
F11R : Hz
Clovers : Hz
VPLT : Hz
VPLB : Hz
AIDAPL : Hz
========= END =========
Date 2016/11/27
BRIKEN run : 032
BRIKEN stop : 17:15
ROOT online :
AIDA run : R21_8
AIDA stop : 17:04
BigRIPS RUN : 1032 |
|
180
|
Sun Nov 27 07:10:29 2016 |
BRIKEN colaboration | Run 31 |
======= START =======
Date 2016/11/27
Start time : 13:53
BRIKEN run : 031
Daq Conf. File : 161125Conf_BrikenFull.xlsx
DLT File name : 161127_1353
AIDA run : R20_0
AIDA start : 13:51
BigRIPS run : 1028
BigRIPS start : 12:32:36
---------------------------
Shifters:
======= Setup =======
Central fragment: 40Mg
--- Degraders ---
Fixed: 3mm Pb attached to beam hole in BRIKEN PE shielding
Variable:
1=(0.5mm W+1mm Al), 2=(0.3mm W+1mm Al), 3=(1mm W +1mm Al)
1. IN
2. IN
3. OUT
======= COMMENTS =======
------ Rates ------
BRIKEN : Hz
F11R : Hz
Clovers : Hz
VPLT : Hz
VPLB :
AIDAPL : Hz
========= END =========
Date 2016/11/26
BRIKEN run : 031
BRIKEN stop : 16:04
ROOT online : 161127_1353_031.root
AIDA run : R20_27
AIDA stop : 16:04
BigRIPS RUN : 1030 |
|
179
|
Sun Nov 27 04:38:15 2016 |
BRIKEN collaboration | Run 030 |
======= START =======
Date 2016/11/27
Start time : 10:41
BRIKEN run : 030
Daq Conf. File : 161125Conf_BrikenFull.xlsx
DLT File name : 161126_1041
AIDA run : R17_0
AIDA start : 10:41
BigRIPS run : 1025
BigRIPS start : 08:57:33
---------------------------
Shifters:
======= Setup =======
Central fragment: 40Mg
--- Degraders ---
Fixed: 3mm Pb attached to beam hole in BRIKEN PE shielding
Variable:
1=(0.5mm W+1mm Al), 2=(0.3mm W+1mm Al), 3=(1mm W +1mm Al)
1. IN
2. IN
3. OUT
======= COMMENTS =======
13:00 The syncro was lost. The TimeStamp was reset. We did not stop recording data. AIDA was writing
file R18_28, BRIKEN was writing file 161126_1041_030.dlt (@637MB). Notice that BRIKEN online histograms were not
reset, and the rates will not be plane.
------ Rates ------
BRIKEN : 200 Hz
F11R : 100 Hz
Clovers : 275 Hz
VPLT : 18 Hz
VPLB : 8 Hz
AIDAPL : 10 Hz
========= END =========
Date 2016/11/26
BRIKEN run : 030
BRIKEN stop : 13:26
ROOT online : 161126_1326_029_030.root
AIDA run : R28_33
AIDA stop : 13:26
BigRIPS RUN : 1028 |
|
178
|
Sun Nov 27 04:36:16 2016 |
BRIKEN collaboration | Run 020-023 |
======= START =======
Date 2016/11/26
Start time : 20:05
BRIKEN run : 020
Daq Conf. File : 161125Conf_BrikenFull.xlsx
DLT File name : 161126_2004_
AIDA run : R10-0
AIDA start : 20:05
BigRIPS run : 40Mg-1011
BigRIPS start : 19:30
---------------------------
Shifters: AT&AT, AE, GK
======= Setup =======
Central fragment: 41Al
--- Degraders ---
Fixed: 3mm Pb attached to beam hole in BRIKEN PE shielding
Variable:
1=(0.5mm W+1mm Al), 2=(0.3mm W+1mm Al), 3=(1mm W +1mm Al)
1. OUT
2. IN
3. IN
======= COMMENTS =======
2016/11/27
02:48 Beam Off for a while.
07:15 Two peaks appeared in the syncMonitor for Ribf-AIDA. It was after the refilling of Liquid Ni. Not clear if
the possible sync problem affected the measurements.
07:20 Beam OFF
------ Rates ------
BRIKEN : 1.90963e+02 Hz
F11R : 9.75134 Hz
Clovers : 2.03958e+02 Hz
VPLT : 1.87119e+01 Hz
VPLB : 7.76665 Hz
AIDAPL : 1.00896e+01 Hz
========= END =========
Date 2016/11/27
BRIKEN run : 023
BRIKEN stop : 06:25
ROOT online : 161126_2004_020_023.root
AIDA run : R10-211
AIDA stop : 06:25
BigRIPS RUN : 1022 |
|
177
|
Sat Nov 26 20:50:13 2016 |
GK, AT&AT | run 16-19 |
======= START =======
Date 2016/11/26
Start time : 17:21
BRIKEN run : 016
Daq Conf. File : 161125Conf_BrikenFull.xlsx
DLT File name : 161126_1721_016
AIDA run : R9-24
AIDA start : 16:35
BigRIPS run : 40Mg-1009
BigRIPS start :
---------------------------
Shifters: GK, AT&AT
======= Setup =======
Central fragment: 41Al
--- Degraders ---
Fixed: 3mm Pb between Musics
Variable:
1=(0.5mm W+1mm Al), 2=(0.3mm W+1mm Al), 3=(1mm W +1mm Al)
1. OUT
2. IN
3. IN
======= COMMENTS =======
High gamma counting is affecting rings 1-4. (gammas in beam!?)
------ Rates ------
BRIKEN : 1.12118e+02 cps
F11R : 6.26962 cps
Clovers : 1.72406e+04 cps
VPLT : 1.82165e+01 cps
VPLB : 9.08055 cps
AIDAPL : 7.42954 cps
========= END =========
Date 2016/11/26
BRIKEN run : 019
BRIKEN stop : 18:04
ROOT online : 161126_1823_016_019.root
AIDA run : R9-43
AIDA stop : 18:12
BigRIPS RUN : |
Attachment 1: 161126_1823_016_019_Rates.png
|
|
Attachment 2: 161126_1823_016_019_Rings.png
|
|
|
176
|
Sat Nov 26 20:48:16 2016 |
BRIKEN collaboration | run |
===== Start of measurements 41Al ====== |
|
175
|
Sat Nov 26 16:54:17 2016 |
AT & AT | Clovers |
Calibration of clovers |