|
ID |
Date |
Author |
Subject |
Text |
 |
|
510
|
Tue Feb 13 17:19:43 2024 |
JM, AR, NP, AB, RSS | Run22 - cooled beam on target (definitely maybe) | 18:05 We believe we have an overlap between
the beam and the target. Run 22 started.
|
48x |
|
509
|
Tue Feb 13 08:34:44 2024 |
Hw, JM, AR, CB, NP, AB, RSS | Status of DAQ - beam overlap | Check the status of the DAQ system, with
Tom. All correct. See attachments:
1 Leackage currents |
10x |
|
508
|
Mon Feb 12 01:40:48 2024 |
TD, JM, CB, AR, RSS | Run17 - Run20 |
02.35 DAQ continues file G22-88/R17_30
|
49x |
|
507
|
Sun Feb 11 13:28:46 2024 |
JM, CB, TD | Run16 - beam on target | 13:37 Run started - no beam in the ring
(One of the ring magnets was still on RED
when it should have been set to green by |
30x |
|
506
|
Sun Feb 11 07:03:34 2024 |
TD | Sunday 11 February |
02.02 DAQ continues G22-86/R15_21
alpha background
|
20x |
|
505
|
Sat Feb 10 17:05:13 2024 |
TD | Run 15 - background |
17.55 DAQ continues G22-86/R15_11
alpha background
|
20x |
|
504
|
Sat Feb 10 10:00:44 2024 |
AR RSS JM CB | Run 13, 14 | System checks: all ok
Attatchment 1: Rates ok
Attatchment 2: Temperatures ok |
23x |
|
503
|
Fri Feb 9 17:04:39 2024 |
JM, AR, CB, NH | Run12 - Background | |
|
|
502
|
Fri Feb 9 11:58:04 2024 |
TD + CB, JM, AR, NH, AB | Run10 contd, Run11 |
12.46 DAQ continues G22-88/R10_14
|
27x |
|
501
|
Fri Feb 9 07:57:38 2024 |
AR, CB, AB, JM | Run10 - First cool beam on target | 8:58
System wide checks okay, except
|
27x |
|
500
|
Thu Feb 8 17:11:50 2024 |
CB, EH | Pulser walkthrough |
17:30 File G22-88/R8
Pulser walkthrough
EGG
Ortec 448 Pulser
Amplitide 90,000-10,000
@ 10,000 step
Normalise 5.0
Attenuators |
 |
|
499
|
Thu Feb 8 14:59:59 2024 |
JM, TD | Change p+n FEE64 settings | ASIC settings for the pn FEEs has been reset
to the default aida settings. This was done
to combat the observed dropping of several |
|
|
498
|
Thu Feb 8 11:22:28 2024 |
JM | Shifters instruction 2024 | EMERGENCY SHUTDOWNS
1. CARME motors: Q key
on keyboard while on workspace 1 of appc218 |
|
|
497
|
Wed Feb 7 13:50:20 2024 |
Elena Hanu, Carlo Bruno, Michael Lestinsky | Afternoon shift | 14:50
Temperature, Statistics fine (see |
  |
|
496
|
Wed Feb 7 10:09:14 2024 |
CB, JG, EM | Morning Shift | 11:00
Changed slow comp threshold to
0x32 (500 keV). Checkloaded. |
   |
|
495
|
Tue Feb 6 09:39:54 2024 |
CB | Detector bias tests | 10:30 Found ADC#4 on aida 1 and 4 are suddenly
noisy. See attach 1-2. Checkloaded multiple
times - no effect. |
13x |
|
494
|
Mon Feb 5 20:15:31 2024 |
CB, TD | Detector move in/out signals | 17.43 setup signals from detector movement
controller.
|
|
|
493
|
Mon Feb 5 19:43:52 2024 |
CB, TD, ML | BuTIS reference for VETAR2 |
16.40 CB/ML install fibre optic cable from
patch panel beneath dipole downstream of |
  |
|
492
|
Mon Feb 5 12:48:50 2024 |
CB TD | Pulser walkthough - Run4 |
13.41 DAQ start - file G22-88/R4
|
 |
|
491
|
Mon Feb 5 05:45:26 2024 |
CB TD | Run3 - end | 06.40 DAQ continues file G22-88/R3_42
DSSSD bias OK - attachment 1
|
47x |
|