AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CIRCE, Page 2 of 4  ELOG logo
Entry  Mon Dec 3 12:32:54 2018, Thomas Chillery, Carlo Bruno, Tom Davinson, Lucio Gialanella, Raffaele Buompane, 6.0MeV 7Be on CH2 XVIII 181125121226_ADC1_Ch9.png181125121226_ADC3_Ch16.png181125223800_ADC1_Ch9.png181125223800_ADC3_Ch16.png
On 25/11/2018:

The beam was tuned for 6.0MeV 7Be 2+

Using 10mm aperture FCC = 12 pA
Entry  Mon Dec 3 11:54:55 2018, Thomas Chillery, Carlo Bruno, Tom Davinson, Raffaele Buompane, 7Li 6.0 MeV on CH2 XVI and XVIII, and on natC III 181125113734_ADC1_Ch9.png181125113734_ADC3_Ch16.png
On 25/11/2018:

At 8:45 the pressures read (mBar):


TPU1 = 1.0e-6
TPU2 = 3.2e-7
TPD1 = 6.5e-7
TPD2 = 6.1e-7
CHUP = Sensor Off
CHDW
Entry  Mon Dec 3 11:28:53 2018, Thomas Chillery, Carlo Bruno, Tom Davinson, Lucio Gialanella, Antonino d'Leva, 7Be 4.0MeV on CH2 XVI and natC III 181124120558_ADC1_Ch9.png181124120558_ADC3_Ch16.png181124182304_ADC1_Ch9.png181124182304_ADC3_Ch16.png
On 24/11/2018:

After the short test with 4.0MeV 7Li (see eLog #55) the beam was tuned for 4.0MeV 7Be 2+.

Run # 181124103943
Entry  Mon Nov 26 17:13:45 2018, Thomas Chillery, Carlo Bruno, Tom Davinson, Lucio Gialanella, Preparing chamber for 4MeV 7Be 2+ beam IMG_3231.JPGIMG_3232.JPG
On 24/11/2018:

At 8:35 the chamber pressures read (mBar):


TPU1 = 2.2
TPU2 = 2.2
TPD1 = 2.2
TPD2 = 2.0
CHUP = Sensor Off
CHDW = No Sensor


The
Entry  Mon Nov 26 17:10:13 2018, Thomas Chillery, Marialuisa Aliotta, Carlo Bruno, Tom Davinson, Raffaele Buompane, 7Li 4.0 MeV beam on natC target 3 
On 23/11/2018:

After the runs with 7Li on CH2 15, we moved the target ladder to position 5: carbon foil #3 (~590 ug/cm^2)

Run # 181123214406
Entry  Sat Nov 24 16:39:22 2018, Thomas Chillery, Marialuisa Aliotta, Carlo Bruno, Tom Davinson, Raffaele Buompane, 7Li 4.0 MeV beam on CH2 target 15 
On 23/11/2018:

Tuned beam for 4.0 MeV 7Li, charge state 2+

Measured transmission of beam through FCC using 3 mm and 10 mm size collimators: 66 pA with 10 mm -> 60 pA with 3 mm -> 91% transmission
Entry  Sat Nov 24 16:29:10 2018, Thomas Chillery, Marialuisa Aliotta, Carlo Bruno, Tom Davinson, Raffaele Buompane, Preparing setup for 7Li beam 
On 23/11/2018:

10:15 started pumping down chamber with Ecodry 2

RAL thresholds:
Entry  Sat Nov 24 15:07:00 2018, Thomas Chillery, Marialuisa Aliotta, Carlo Bruno, Lizeth Morales, Tom Davinson, Searching for causes of noise 
On 22/11/2018 in the afternoon:

We increased the ADC thresholds to 40 (previously 8).

For an alpha source with pulser connected, the event multiplicity dropped from ~63 to ~10. Dead time ~ 7%
Entry  Sat Nov 24 15:05:40 2018, Thomas Chillery, Marialuisa Aliotta, Carlo Bruno, Lizeth Morales, FAIR DAQ 
The FAIR DAQ IP address: 192.168.1.90

The data is saved in /Local_Parts/Part0DE/

After each run we should copy the data to the 7Be shift folder: /home/circe/7Be_pp/181122/
Entry  Thu Nov 22 11:53:08 2018, Thomas Chillery, Marialuisa Aliotta, Carlo Bruno, Lizeth Morales, DAQ tests with alpha source IMG_3329.JPGAlphaSourceCertificate.jpg
The target ladder is set for position 7 - the double alpha source.

Looking at the FAIR DAQ, for the Far S2 the first RAL amplifier (XV) shows:


Alphas at channel 700
Pulser centroid at channel ~2640, with 9 channel FWHM -> corresponds to 44 keV FWHM at 4.91 keV/channel


The
Entry  Thu Nov 22 11:34:07 2018, Thomas Chillery, Marialuisa Aliotta, Carlo Bruno, Lizeth Morales, Continuing Electronic Chain Tests 
This morning at 8:35am the pressures read (in mBar):


TPU1 = 2.0e-6
TPU2 = 4.5e-7
TPD1 = 8.1e-7
TPD2 = 7.9e-7
CHUP = 4.7e-7
CHDW = 1.1e-5


The
detectors were biased. Far S2 leak I = 1.54uA, near S2 leak I = 12.53uA.
Entry  Wed Nov 21 09:34:26 2018, Thomas Chillery, Marialuisa Aliotta, Carlo Bruno, Setting up chamber both for tests under vacuum and physics measurement IMG_3223.JPGIMG_3224.JPG
Today we mounted the far aperture used to control the far iris. No problems were encountered with this.

We mounted the target ladder with the following configuration, see also pictures 1 and 2:




Target #
Target


I
Blank
Entry  Wed Nov 21 09:28:06 2018, Thomas Chillery, Marialuisa Aliotta, Carlo Bruno, Lizeth Morales, Problem encountered with near iris arm 
On 20/11/2018:

After the electronics tests in air (see eLog entry #44) we started to setup the chamber for vacuum tests with an alpha source.

We started mounting the aperture used for controlling the near iris arm, however we encountered a problem. The iris arm got stuck and could not
Entry  Wed Nov 21 09:09:41 2018, Thomas Chillery, Marialuisa Aliotta, Carlo Bruno, Lizeth Morales, David Rapagni, Mounting Detectors / Continuing Electronic Chain Tests IMG_3209.JPG
On 20/11/2018:

At 9:00 we walked into the lab, David R reported he found all the pumps OFF. A thunderstorm occurred overnight causing a power outage.

Last night we had switched off the electronics (Preamp power, RAL amp rack, and NIM bin).
Entry  Wed Nov 21 08:53:06 2018, Thomas Chillery, Marialuisa Aliotta, Carlo Bruno, Lizeth Morales, Testing Electronic Chain - No Detectors 
On 19/11/2018:

During the vacuum test - see eLog entry #43 we performed noise tests on the preamplifiers with no S2 detector connected

First we performed a "tabletop" test - the preamplifiers were not connected to the chamber.
Entry  Wed Nov 21 08:45:03 2018, Thomas Chillery, Marialuisa Aliotta, Raffaele Buompane, Carlo Bruno, Testing Chamber Vacuum 
On 19/11/2018:

We mounted the following in the chamber:


Iris frames - no S2 detectors or mylar
Si pin diode mount with 0.9um mylar - no diode
Target ladder with blank
Entry  Wed Nov 21 08:37:24 2018, Thomas Chillery, Marialuisa Aliotta, Raffaele Buompane, Upstream Collimator IMG_3391_Modified.JPG
On 19/11/2018:

During the target ladder calibration (see elog entry #41) we also replaced the collimator (thickness ~24mm, diameter 3mm) located immediately
upstream from the target ladder - that is between the upstream and central sections of the chamber. We mounted an aluminium collimator (thickness ~1mm,
Entry  Wed Nov 21 08:18:14 2018, Thomas Chillery, Marialuisa Aliotta, Checking Target Ladder Calibration IMG_3204.JPGIMG_3205.JPGIMG_3200.JPG
On 19/11/2018:

There were three CH2 targets already mounted on the target frame, CH2 III, IV, and a damaged target. We dismounted these.

We noticed these previous target were mounted on the incorrect side of the target ladder, resulting in them being offset upstream from the central
Entry  Wed Jul 11 15:55:35 2018, Thomas Chillery, Electronics Channel Map Electronics_Channel_Map.ods
See attached for Electronics Channel Map spreadsheet.

This is valid for the February 2018 Beamtime; it maps out the Far S2 Strips onto the ADC channels

A map should be produced and updated for each beamtime to ensure S2 Strip -> ADC Channel is correctly documented.
Entry  Fri Apr 13 15:08:04 2018, Thomas Chillery, Lucio Gialanella, End of shift - lab cleanup 
Date: 07/04/2018

Began dismounting detectors:


All detectors powered off
Closed line and quadrupole valves
Preamp power off
Stopped turbos
Closed
ELOG V3.1.4-unknown