AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DESPEC, Page 18 of 35  ELOG logo
  ID Date Author Subject Text Attachments
  355   Fri Jun 4 08:40:52 2021 TDFriday 4 June
09.20 DAQ found stopped
      files in /TapeData/S496 indicate increased
 8x 
  354   Thu Jun 3 10:16:39 2021 TDThursday 3 June11.19 Hot HEC channels multiple FEE64s
      ASIC check fixes
 8x 
  353   Wed Jun 2 14:53:05 2021 OH, TDMerger/Tapeserver issues after reboot of aida-3On 01/06/21 aida-3 was rebooted as the graphical
user interface had frozen.
We were also unable to connected to MIDAS
 6x 
  352   Sun May 30 08:57:53 2021 TDSunday 30 May09.55 DAQ continues - file S496/R18_588
      alpha background
 9x 
  351   Sat May 29 13:13:45 2021 TDSaturday 29 May14.10 DAQ continues - file S496/R18_539
      alpha background
 9x 
  350   Fri May 28 10:29:07 2021 TDFriday 28 May11.30 DAQ continues - file S496/R18_472
      alpha background
 9x 
  349   Thu May 27 12:25:53 2021 TDThursday 27 May13.29 DAQ continues - file S496/R18_443
      alpha background
 9x 
  348   Wed May 26 13:21:59 2021 TDWednesday 26 May
14.22 DAQ continues - file S496/R18_369
      alpha background
 9x 
  347   Tue May 25 11:16:54 2021 TDTuesday 25 May12.16 DAQ continues file S496/R18_324
      alpha background
 7x 
  346   Mon May 24 09:57:07 2021 TDMonday 24 May
07.30 Hot HEC channels multiple FEE64s
      ASIC check fixes
 19x 
  345   Sat May 22 23:40:32 2021 TDSunday 23 May
00.40 Unable to connect to FEE64s 1-7
      DAQ power cycled OK
 Screenshot_2021-05-23_AIDA_Alerting_-_Grafana.pngScreenshot_2021-05-23_Statistics_aidas-gsi.pngScreenshot_2021-05-23_Temperature_and_status_scan_aidas-gsi.png810.pngR16_33 
  344   Sat May 22 13:40:56 2021 TDSaturday 22 May
14.37 DAQ continues file S496/R15_14
 23x 
  343   Fri May 21 23:19:23 2021 TDSaturday 22 May 00:00-08:00
00.16 413Gb remaining /TapeData filesystem
      estimate 413/2 x 177s = 10.15h to filesystem
 29x 
  342   Fri May 21 15:03:48 2021 CAFriday 21st May 16:00 - 00:00 shift16:00 CA takes over
      DSSD1 n+n sides 0x20 on ASICs 1-3 and
0x64 on ASIC 4
 17x 
  341   Fri May 21 07:03:50 2021 OH, TDFriday 21 May 08:00-16:0008:00 OH and TD take over
      Current settings p+n sides at 0xc
      DSSD1 n+n sides 0x20 on ASICs 1-3 and
 9x 
  340   Fri May 21 06:09:28 2021 MLsystem wide checksSystem  wide checks at 7am CET

All seems fine, nothing significant
to report
 8x 
  339   Fri May 21 02:17:47 2021 MLsystem wide checksWide check at 3am -

All fine.

Same output as at the beginning
 9x 
  338   Thu May 20 23:26:11 2021 Marc Labiche (ML)system wide checksSystem Wide check at begining of the night
shift:

-----
 9x 
  337   Thu May 20 14:56:33 2021 OHThursday 20th May 16:00 - 24:0016:00 p+n threshold 0xc (120keV)
      n+n threshold DSSD2 0x20 (250keV) ASICS
1-3, 0x64 ASIC4
 10x 
  336   Thu May 20 07:03:02 2021 CAThursday May 20th 08:00 - 16:00 shift08:00 CA takes over

08:04 DAQ continues ok - writing to file
 40x 
ELOG V3.1.4-unknown