AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DESPEC, Page 28 of 36  ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Subject Text Attachments
  166   Mon Feb 22 18:18:47 2021 NHAIDA Rates/Situation The ground cable (LEMO00) in aida07 was disconnected,
it has been reinserted and the waveforms
now look good.
 8x 
  165   Fri Feb 12 17:31:04 2021 NHBackground runA background run has been started to check
the AIDA channels.
It is in /TapeData/BGFEB21
  
  164   Sat Feb 6 10:45:55 2021 NHAIDA Status Feb 2021> 01.02.2021 - Four new sets of PSU, HDMI
& Ethernet cables were ran from the DESPEC
rack to the AIDA frame, in preparation for
 pregrd050222_E.pngpregrd050221_O.pngpostgrd050221_O.pngpostgrd050221_E.png 
  163   Mon Feb 1 15:19:07 2021 NHAIDA Status Feb 202101.02.2021 - Four new sets of PSU, HDMI &
Ethernet cables were ran from the DESPEC
rack to the AIDA frame, in preparation for
  
  162   Tue Nov 24 13:10:42 2020 NHWaveforms with frame groundedAIDA Frame is now grounded to platform (will
add photo later)
 waves_odd.pngwaves_even.png20201124_164416.jpg20201124_164413.jpg 
  161   Tue Oct 6 15:48:06 2020 NHnnrpi kernel updateFYI:

The SD card on nnrpi2 was full again causing
  
  160   Tue Jul 7 08:50:27 2020 NHnnrpi2 does not bootMIDAS was not working properly on nnrpi2 -
power cycled. Now system does not boot properly,
it gets stuck trying to login claiming "PAM
  
  159   Tue Jul 7 08:04:57 2020 NHPower failure in MesshuetteLast week there was a power failure in Messhuette
(FRS control room) - AIDA-3 and MBS were
affected.
  
  157   Wed Mar 18 18:02:37 2020 PJCSNew Firmware loaded in all FEE64sLoaded new frimware into all 12 FEE64s
in the system. IWR_Dec19_4.bin 

Booted ok after power-cycle.  
  
  156   Mon Mar 16 07:25:24 2020 NHEnd of Experiment08:25 Beam Stopped, end of S480

Tape Server stopped at R12_2097

Started again in no storage mode
  
  155   Mon Mar 16 05:08:12 2020 TA, AM, ESRegular entry
02:14 all system wide checks okay 

     FEE temperatures okay 
      leakage
currents okay and recorded to spreadsheet
 6x 
  154   Mon Mar 16 01:07:29 2020 TA, AM, ESRegular entry
02:14 all system wide checks okay 

     FEE temperatures okay 
      leakage
currents okay and recorded to spreadsheet
 13x 
  153   Sun Mar 15 06:45:00 2020 CA, LS, CGSunday 15th March 08:00 - 24:00ASIC settings 2019Oct31-13.24.23
     slow comparator 0xa
 35x 
  152   Sat Mar 14 23:09:28 2020 MB, SJ, MRSunday 15th March 0:00-8:00AIDA ELog filled out by DESPEC night shift
members Matthew Brunet (MB), Shaheen Jazrawi
(SJ), and Matthias Rudiger (MR).
 16x 
  151   Sat Mar 14 07:13:59 2020 DK, TD, LS, CGSaturday 14th March 08:00 - 24:008:15
    All system wide checks passed
    Leak currents are continuing to creep
 41x 
  150   Fri Mar 13 23:06:39 2020 CA, OHSaturday 14th March 00:00 - 08:00ASIC settings 2019Oct31-13.24.23
     slow comparator 0xa
 19x 
  149   Fri Mar 13 15:48:11 2020 Friday 13th 16:00 - 24:00OH, TDASIC settings 2019Oct31-13.24.23
     slow comparator 0xa
 11x 
  148   Fri Mar 13 08:01:53 2020 DKFriday 13th 8:00 to 16:00 shift8:00 - See previous shift's elog entry.  All
good.
 8x 
  147   Thu Mar 12 23:44:48 2020 DKPID PlotsLabelled PID plots.  Note that the A/Q calibration
is shifted by +0.02 units, and Z calibration
is offset by about +5.
 pid.pngpid.pngpid.pdf 
  146   Thu Mar 12 23:04:24 2020 LS, DKFriday 13th 00:00 to 08:00 shift   Shift file starting R9_639

   system wide checks okay
 20x 
ELOG V3.1.4-unknown