AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DESPEC, Page 29 of 36  ELOG logo
ID Date Authordown Subject Text Attachments
  264   Fri Apr 23 07:09:57 2021 LJWFriday 23rd April 08:00-12:0008:30

System Checks

 
 9x 
  320   Mon May 17 15:14:35 2021 LJWMonday 17th May 2021 16:00-20:0016:25

Informed at shift handover that
there has been no beam.
 9x 
  234   Sat Apr 17 11:27:38 2021 JS, TDSaturday 17th April 12:00-16:00  Base  Current  Difference
aida05 fault   0x1a52 :   0x1a53 :   1  
aida06 fault   0x4f3e :   0x4f3f :   1  
 10x 
  254   Tue Apr 20 19:00:00 2021 JSTuesday 20th 20:00-00:00 20:00  

Taking over from Liam, all systems good.
 12x 
  261   Thu Apr 22 11:03:57 2021 JSThursday 22nd April: 12:00-16:0012:00 Taking over from Liam, all is well.

12:10 Beam dropped out for a minute, implantation
 12x 
  309   Wed May 12 18:53:38 2021 JSWed 12 20:00-00:0019:51 Shift change

Stats ok
 ucesb.pngbias1.pngScreenshot_2021-05-12_Statistics_aidas-gsi.pngScreenshot_2021-05-12_Temperature_and_status_scan_aidas-gsi.pngbias2.png 
  319   Fri May 14 19:01:09 2021 JSFriday 14th May 20:00-00:0020:00 Taking over from CB

20:33 Doing full checks.
 27x 
  639   Wed Jun 5 08:34:47 2024 JB. AM, MP, MYDetector bias testsWe are trying to bias each system on its
own and in sequence biasing each other detector
system to see the interdependence.
 14x 
  571   Thu Apr 11 08:27:21 2024 JB, TD11 April noise tests
TO-DO for 11.04.2024

- Try bringing
bPlast drain wire ground back to the PSU
ground for PN 300 and R&SRMP4040.

-
 48x 
  577   Thu Apr 18 08:57:48 2024 JB, TDThursday 18 April09.52 DAQ continues file S100_alpha/R5
       note merger not functioning correctly
due to aida03, aida04 & aida09 out of WR
 36x 
  533   Mon Mar 11 15:19:44 2024 JB, NH, Priyanka, Michael Armstrong, Helena AlbersTo Do: AIDA PCB testsTo do:

1) Disconnect ribbon cables
from p+n junction FEE64 adaptor PCBs of upstream
  
  537   Thu Mar 14 13:00:23 2024 JB, NH, MA, AM, GAMounting and biasing DSSD 2new Downstream DSSD2: 3208-2/3208-5/3208-8

Covered with black cloth.
  
  536   Thu Mar 14 12:13:17 2024 JB, NH, MAMounting and biasing DSSD 1Upstream bPlast mounted

new Upstream DSSD: 3208-2/3208-5/3208-8
  
  535   Wed Mar 13 13:02:19 2024 JB, NH, HA, MADSSD 1 biasing testsDismounted Snout and biased DSSSD1 channels

leftmost waifer working

middle waifer reaches 90V then
 20240313_142551.jpg 
  530   Thu Mar 7 15:15:29 2024 JB, NH, CCAIDA HV Bias Test IV Curve
AIDA I-V
Test


Voltage
  
  552   Wed Mar 27 14:22:35 2024 JB, NHInstalling FEE64s of DSSSD2Mounted on frame:

DSSD 1 (Upstream) :    
3208-2/3208-5/3208-8
 14x 
  637   Mon Jun 3 14:40:34 2024 JB, NH03 June 202415:40 reseated FEE64s adaptors of aida01,
aida09, aida13 & aida16.

TEMP OK. HV OK. System wide checks
 10x 
  677   Mon Dec 16 13:07:04 2024 JB, MP, CCAIDA timing testhttps://elog.gsi.de/despec/Implantation+Stack/9?suppress=1
- Day 1 ELOG

Day2:
 16x 
  678   Tue Dec 17 12:45:36 2024 JB, MP, CCAIDA timing test 




 IMG_2536.jpeg20241217_141148.jpg20241217_141206.jpg 
  683   Wed Jan 8 16:47:05 2025 JB, MP, CCAIDA timing test 




 Screenshot_from_2025-01-08_17-51-51.png 
ELOG V3.1.4-unknown