Mon Apr 19 01:08:40 2021, MA, Monday 19th April 00:00-08:00 8x
|
03:09 General check
Rates, temptature, voltages are OK attached 1, 2, 3, 4
|
Wed Jun 22 15:09:37 2022, MA, Wednesday 22 June 16:00-00:00 12x
|
16:00 Take over from Magda mrning shift
Beam was off of sometime for tunning to Mercurey setting.
17:00 attached 1-3 |
Mon Jun 27 17:03:09 2022, MA, Monday 27th June 16:00-00:00 6x
|
16:00 Took over the shift from OH no beam yet.
18:00 Still no beam yet.
Statistics, Temperature, Current are checked and attached 1-3 |
Thu Mar 12 23:04:24 2020, LS, DK, Friday 13th 00:00 to 08:00 shift 20x
|
Shift file starting R9_639
system wide checks okay
|
Mon Mar 9 13:50:08 2020, LS, CA, DK, 09/03/2020 system checks 13x
|
14:52 Attachment 1 shows low energy spectra. AIDA06 shows strange baseline, possible double-hit?
15:06 Systems checks fine.
|
Fri Mar 12 10:09:19 2021, LS, CA, Friday 12th March 11.00- 17x
|
11.00(Germany) System wide checks okay except:
FEE64 module aida09 global clocks failed, 6
|
Mon May 17 19:05:23 2021, LS, Monday 17th May 20.00-24.00 21x
|
20.30
Checked stats, seem okay (Fig 1)
Ran R14_99 through analyser, dead times all good (Fig 2)
|
Tue May 18 18:47:25 2021, LS, Tuesday 18th May 20:00 - 24:00 24x
|
19.50
Stats okay (Fig 1)
|
Wed May 19 18:50:01 2021, LS, Wednesday 19th May 20:00 to 24:00 21x
|
20.00
Stats okay (Fig 1)
Analysed R14_762 deadtimes are okay (Fig 2)
|
Sat Apr 17 07:28:02 2021, LPG, TD, Saturday 08:00 - 12:00 9x
|
08:30 CEST
HV and leakage currents: elog:233/1
|
Tue Apr 20 14:56:38 2021, LPG, Tuesday 20th 16:00-20:00 15x
|
16:00
New shift, ready to go! Beam stopped just as I started... Waiting for update.
|
Thu Apr 22 07:06:37 2021, LPG, Thursday 22nd April: 08:00-12:00 8x
|
08:01 - Taking over from Corrigan...
ucesb ok!
|
Wed Apr 21 15:01:14 2021, LJW, MA, Wednesday 21st April 16:00-20:00 13x
|
16:30
All System checks okay, except for: |
Mon Apr 19 16:58:29 2021, LJW, Monday 19th April 16:00-20:00 Shift 6x
|
System Checks @ ~18:10 :
|
Fri Apr 23 07:09:57 2021, LJW, Friday 23rd April 08:00-12:00 9x
|
08:30
System Checks
|
Mon May 17 15:14:35 2021, LJW, Monday 17th May 2021 16:00-20:00 9x
|
16:25
Informed at shift handover that there has been no beam.
Statistics - See attachment 1 |
Sat Apr 17 11:27:38 2021, JS, TD, Saturday 17th April 12:00-16:00 10x
|
Base Current Difference
aida05 fault 0x1a52 : 0x1a53 : 1
aida06 fault 0x4f3e : 0x4f3f : 1
|
Tue Apr 20 19:00:00 2021, JS, Tuesday 20th 20:00-00:00 12x
|
20:00
Taking over from Liam, all systems good.
|
Thu Apr 22 11:03:57 2021, JS, Thursday 22nd April: 12:00-16:00 12x
|
12:00 Taking over from Liam, all is well.
12:10 Beam dropped out for a minute, implantation rate is down a bit, peaking around 300 Hz
|
Wed May 12 18:53:38 2021, JS, Wed 12 20:00-00:00    
|
19:51 Shift change
Stats ok
|