AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DESPEC, Page 29 of 36  ELOG logo
Entry  Fri Apr 23 07:09:57 2021, LJW, Friday 23rd April 08:00-12:00 9x
08:30

System Checks

 
Entry  Mon May 17 15:14:35 2021, LJW, Monday 17th May 2021 16:00-20:00 9x
16:25

Informed at shift handover that there has been no beam.

Statistics  - See attachment 1
Entry  Sat Apr 17 11:27:38 2021, JS, TD, Saturday 17th April 12:00-16:00 10x
 Base  Current  Difference
aida05 fault   0x1a52 :   0x1a53 :   1  
aida06 fault   0x4f3e :   0x4f3f :   1  
Entry  Tue Apr 20 19:00:00 2021, JS, Tuesday 20th 20:00-00:00  12x
20:00  

Taking over from Liam, all systems good.
Entry  Thu Apr 22 11:03:57 2021, JS, Thursday 22nd April: 12:00-16:00 12x
12:00 Taking over from Liam, all is well.

12:10 Beam dropped out for a minute, implantation rate is down a bit, peaking around 300 Hz
Entry  Wed May 12 18:53:38 2021, JS, Wed 12 20:00-00:00 ucesb.pngbias1.pngScreenshot_2021-05-12_Statistics_aidas-gsi.pngScreenshot_2021-05-12_Temperature_and_status_scan_aidas-gsi.pngbias2.png
19:51 Shift change

Stats ok
Entry  Fri May 14 19:01:09 2021, JS, Friday 14th May 20:00-00:00 27x
20:00 Taking over from CB

20:33 Doing full checks.
Entry  Wed Jun 5 08:34:47 2024, JB. AM, MP, MY, Detector bias tests 14x
We are trying to bias each system on its own and in sequence biasing each other detector system to see the interdependence.
 

HV OK. TEMP OK. Attachment 1 &2.
Entry  Thu Apr 11 08:27:21 2024, JB, TD, 11 April noise tests 48x

TO-DO for 11.04.2024

- Try bringing bPlast drain wire ground back to the PSU ground for PN 300 and R&SRMP4040.

- Recheck the downstream
detector bias and ground scheme.

-

 
Entry  Thu Apr 18 08:57:48 2024, JB, TD, Thursday 18 April 36x
09.52 DAQ continues file S100_alpha/R5
       note merger not functioning correctly due to aida03, aida04 & aida09 out of WR sequence 
Entry  Mon Mar 11 15:19:44 2024, JB, NH, Priyanka, Michael Armstrong, Helena Albers, To Do: AIDA PCB tests 
To do:

1) Disconnect ribbon cables from p+n junction FEE64 adaptor PCBs of upstream DSSSD, apply c. 100V bias and check leakage current is zero
i.e. eliminate shorts in PCBs
Entry  Thu Mar 14 13:00:23 2024, JB, NH, MA, AM, GA, Mounting and biasing DSSD 2 
new Downstream DSSD2: 3208-2/3208-5/3208-8

Covered with black cloth.
Entry  Thu Mar 14 12:13:17 2024, JB, NH, MA, Mounting and biasing DSSD 1 
Upstream bPlast mounted

new Upstream DSSD: 3208-2/3208-5/3208-8
Entry  Wed Mar 13 13:02:19 2024, JB, NH, HA, MA, DSSD 1 biasing tests 20240313_142551.jpg
Dismounted Snout and biased DSSSD1 channels

leftmost waifer working

middle waifer reaches 90V then current ramps up
Entry  Thu Mar 7 15:15:29 2024, JB, NH, CC, AIDA HV Bias Test IV Curve 

AIDA I-V Test


Voltage (V)
Current
(uA)


10
1.43


20
2.065


30
2.415


40
2.64


50
2.825


60
2.99


70
3.185


80
3.58


90
5.01


100
9.4




-
Voltage-Current test of newly installed AIDA snout. Breakdown observed at around ~92 V. Probably caused my light leakage into the snout, will investigate
Entry  Wed Mar 27 14:22:35 2024, JB, NH, Installing FEE64s of DSSSD2 14x
Mounted on frame:

DSSD 1 (Upstream) :     3208-2/3208-5/3208-8
DSSD 2 (Downstream): 3208-3/3208-21/3208-22
Entry  Mon Jun 3 14:40:34 2024, JB, NH, 03 June 2024 10x
15:40 reseated FEE64s adaptors of aida01, aida09, aida13 & aida16.

TEMP OK. HV OK. System wide checks all passed excl. aida07 ADC calibration, see attached.

Histograms and rates look same as previous, reseating aida01 seems to have worked. aida16 still unhappy.
Entry  Mon Dec 16 13:07:04 2024, JB, MP, CC, AIDA timing test 16x
https://elog.gsi.de/despec/Implantation+Stack/9?suppress=1 - Day 1 ELOG

Day2:

10:14 we set up the detector with the pulser in BB7 and started biasing the detector and setting up the DAQ. Water flow and temperature check,
    Reply  Tue Dec 17 12:45:36 2024, JB, MP, CC, AIDA timing test IMG_2536.jpeg20241217_141148.jpg20241217_141206.jpg
 




Quote:



https://elog.gsi.de/despec/Implantation+Stack/9?suppress=1 - Day 1 ELOG
    Reply  Wed Jan 8 16:47:05 2025, JB, MP, CC, AIDA timing test Screenshot_from_2025-01-08_17-51-51.png
 




Quote:



https://elog.gsi.de/despec/Implantation+Stack/9?suppress=1 - Day 1 ELOG
ELOG V3.1.4-unknown