Fri Apr 23 07:09:57 2021, LJW, Friday 23rd April 08:00-12:00 9x
|
08:30
System Checks
|
Mon May 17 15:14:35 2021, LJW, Monday 17th May 2021 16:00-20:00 9x
|
16:25
Informed at shift handover that there has been no beam.
Statistics - See attachment 1 |
Sat Apr 17 11:27:38 2021, JS, TD, Saturday 17th April 12:00-16:00 10x
|
Base Current Difference
aida05 fault 0x1a52 : 0x1a53 : 1
aida06 fault 0x4f3e : 0x4f3f : 1
|
Tue Apr 20 19:00:00 2021, JS, Tuesday 20th 20:00-00:00 12x
|
20:00
Taking over from Liam, all systems good.
|
Thu Apr 22 11:03:57 2021, JS, Thursday 22nd April: 12:00-16:00 12x
|
12:00 Taking over from Liam, all is well.
12:10 Beam dropped out for a minute, implantation rate is down a bit, peaking around 300 Hz
|
Wed May 12 18:53:38 2021, JS, Wed 12 20:00-00:00    
|
19:51 Shift change
Stats ok
|
Fri May 14 19:01:09 2021, JS, Friday 14th May 20:00-00:00 27x
|
20:00 Taking over from CB
20:33 Doing full checks.
|
Wed Jun 5 08:34:47 2024, JB. AM, MP, MY, Detector bias tests 14x
|
We are trying to bias each system on its own and in sequence biasing each other detector system to see the interdependence.
HV OK. TEMP OK. Attachment 1 &2. |
Thu Apr 11 08:27:21 2024, JB, TD, 11 April noise tests 48x
|
TO-DO for 11.04.2024
- Try bringing bPlast drain wire ground back to the PSU ground for PN 300 and R&SRMP4040.
- Recheck the downstream
detector bias and ground scheme.
-
|
Thu Apr 18 08:57:48 2024, JB, TD, Thursday 18 April 36x
|
09.52 DAQ continues file S100_alpha/R5
note merger not functioning correctly due to aida03, aida04 & aida09 out of WR sequence
|
Mon Mar 11 15:19:44 2024, JB, NH, Priyanka, Michael Armstrong, Helena Albers, To Do: AIDA PCB tests
|
To do:
1) Disconnect ribbon cables from p+n junction FEE64 adaptor PCBs of upstream DSSSD, apply c. 100V bias and check leakage current is zero
i.e. eliminate shorts in PCBs |
Thu Mar 14 13:00:23 2024, JB, NH, MA, AM, GA, Mounting and biasing DSSD 2
|
new Downstream DSSD2: 3208-2/3208-5/3208-8
Covered with black cloth. |
Thu Mar 14 12:13:17 2024, JB, NH, MA, Mounting and biasing DSSD 1
|
Upstream bPlast mounted
new Upstream DSSD: 3208-2/3208-5/3208-8
|
Wed Mar 13 13:02:19 2024, JB, NH, HA, MA, DSSD 1 biasing tests
|
Dismounted Snout and biased DSSSD1 channels
leftmost waifer working
middle waifer reaches 90V then current ramps up |
Thu Mar 7 15:15:29 2024, JB, NH, CC, AIDA HV Bias Test IV Curve
|
AIDA I-V Test
Voltage (V)
Current
(uA)
10
1.43
20
2.065
30
2.415
40
2.64
50
2.825
60
2.99
70
3.185
80
3.58
90
5.01
100
9.4
-
Voltage-Current test of newly installed AIDA snout. Breakdown observed at around ~92 V. Probably caused my light leakage into the snout, will investigate |
Wed Mar 27 14:22:35 2024, JB, NH, Installing FEE64s of DSSSD2 14x
|
Mounted on frame:
DSSD 1 (Upstream) : 3208-2/3208-5/3208-8
DSSD 2 (Downstream): 3208-3/3208-21/3208-22 |
Mon Jun 3 14:40:34 2024, JB, NH, 03 June 2024 10x
|
15:40 reseated FEE64s adaptors of aida01, aida09, aida13 & aida16.
TEMP OK. HV OK. System wide checks all passed excl. aida07 ADC calibration, see attached.
Histograms and rates look same as previous, reseating aida01 seems to have worked. aida16 still unhappy. |
Mon Dec 16 13:07:04 2024, JB, MP, CC, AIDA timing test 16x
|
https://elog.gsi.de/despec/Implantation+Stack/9?suppress=1 - Day 1 ELOG
Day2:
10:14 we set up the detector with the pulser in BB7 and started biasing the detector and setting up the DAQ. Water flow and temperature check, |
Tue Dec 17 12:45:36 2024, JB, MP, CC, AIDA timing test  
|
Quote:
https://elog.gsi.de/despec/Implantation+Stack/9?suppress=1 - Day 1 ELOG |
Wed Jan 8 16:47:05 2025, JB, MP, CC, AIDA timing test
|
Quote:
https://elog.gsi.de/despec/Implantation+Stack/9?suppress=1 - Day 1 ELOG |