AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DESPEC, Page 30 of 35  ELOG logo
Entry  Fri Dec 20 12:04:03 2019, NH, TD, Friday 20 December 2019 7x
Fig 1: DSSD Leakage currents ok

Fig 2: FEE Temps ok
Entry  Fri Dec 20 10:19:29 2019, NH, Alpha Analysis (Pre Run) Alphas.pngAlphas_E.png
======================================                                                                                                                 
                                                                                                                      
AIDA Unpacker Analysis                                                                                                                                
Entry  Thu Dec 19 14:45:42 2019, TD, FEE64 ASIC settings - different diode link settings 
[npg@aidas-gsi 2019Oct31-13.24.23]$ pwd
/MIDAS/DB/EXPERIMENTS/AIDA/2019Oct31-13.24.23
[npg@aidas-gsi 2019Oct31-13.24.23]$ /bin/csh
Entry  Thu Dec 19 14:26:09 2019, TD, BNC PB-5 - Manual pb-5manual.pdf
 
Entry  Thu Dec 19 14:07:38 2019, TD, Report - low - aida08 ADC spectrum size 32k cf. 64k channels expcted using layout 6x
Note that aida08 spectrum 1.8.L size is (shown as) 32k channels cf. 64k channels expected using layout - attachment 1 - 5
Layout configuration - attachment 6
Why?
Entry  Thu Dec 19 13:09:32 2019, TD, MIDAS app launcher command lines 

App                          Path
Entry  Thu Dec 19 13:06:02 2019, TD, NH, AIDA@DESPEC To Do list 
FAIR phase 0 DESPEC experiments are scheduled March-May 2020 see

https://www.gsi.de/en/work/organisation/scientific_boards/user/beam_time.htm
Entry  Thu Dec 19 10:11:59 2019, TD, Report - medium - FEE64 panics during boot 300.png

Some of the FEE64s aida01 .. aida12 panic during boot 
Entry  Thu Dec 19 09:22:52 2019, TD, Thusrday 19 December 21x
10.15 Found DAQ running at c. 1M data items/s 

      Rate spectra show aida09 1.*.H and one 1x LEC channel of aida08 asic running hot
Entry  Wed Dec 18 17:39:27 2019, TD, Wednesday 18 December 23x

18.40 Detector biases & leakage currents OK - attachment 1
      FEE64 temperatures OK - attachment 2
Entry  Wed Dec 18 02:44:27 2019, NH, 17.12.19, 18.12.19  7x
Beam: 238U (850 MeV/u)
Fragment: 168Re
Entry  Mon Dec 16 14:48:02 2019, NH TD, AIDA 16.12.19 20191213_103710.jpg161219_aida_DSSDs.png161219_rates.png161219_aida0855.pngmidasmessage131219.png
DSSD Snout was reassembled to install the second bPlast (downstream) 
 (fig 1)
Entry  Wed Dec 11 10:58:52 2019, NH, Initital Dec. Analysis 11x
Fig 1: 2D hit pattern of each AIDA DSSD for MBS run 24 (40Ar primary beam, centred)

Low statistics in DSSD2 partly due to low energy deposition 
Entry  Sat Dec 7 02:39:02 2019, DK, NH et al., 34Si Fragments PID 2019-12-07-PID.png59_AM.pngpid.pngAr-300_S4_updated_matter_DEPSEC_34Si.lpp
See attached

Tentative PID (DK) as attachment #3
Entry  Fri Dec 6 20:34:56 2019, CA, DK, NH, Dec 6 Night Shift 15x
21.35 AIDA DAQ currently running, TapeService on, not writing to storage

      System wide checks ok
Entry  Thu Dec 5 22:00:11 2019, CA, DK, NH, Dec 5 Night Shift 30x
15:30
  TD found the merger was running at ~43 Mb/s
  The odd-numbered FEE64s all had significant (>200k) disk rates
Entry  Wed Nov 27 16:33:50 2019, NH, New Bias & Waveforms waves_new_odd.pngwaves_new_even.png
HV core (-160 V) now attached to bottom 3 FEEs (with grounded kapton)

DSSDs bias OK, leakages unchanged

No appreciable change in waveforms
Entry  Fri Nov 22 08:55:31 2019, NH, Waveforms waves_21119_even.png21119_waves_odd.pngwaves_21119_even_z.pngwaves_21119_odd_z.png
AIDA Waveforms immediately after beam at 21.11.19 8am or so.
    Reply  Mon Nov 25 13:25:51 2019, NH, Waveforms wave_odd.pngwave_even1.png
> AIDA Waveforms immediately after beam at 21.11.19 8am or so.

Update 25.11.19 with all FEE64 waveforms added
Entry  Wed Nov 20 20:36:14 2019, CA, CB, DK, NH, 20/21 November Night Shift 17x
21:35 (NH) - A few merger timestamp errors were appearing - Decided to powercycle all FEE64s, all checks OK.
 No Screenshot due to forgetting before I closed merger 
 FEEs were often not stopping properly and needing merger reset as well.
Entry  Tue Nov 19 21:22:06 2019, CA, CB, DK, NH, 19/20 November 2019 - overnight shift 15x
19 November

Waiting for 40Ar beam to be delivered for tests.
ELOG V3.1.3-7933898