ID |
Date |
Author |
Subject |
Text |
 |
713
|
Wed Jul 23 15:04:26 2025 |
CC, MP, NK | Test of AIDA05 with BB7 connected to Mesytec but not biased | Attachment1: AIDA05.1.8L when AIDA05 connected,
biased at 100 V with not-shielded cables,
after the DEGAS platform has been closed, |
|
714
|
Wed Jul 23 15:56:00 2025 |
CC, MP, NK | Test of AIDA05 with new bias module | Attachment1: AIDA05.1.8L when AIDA05 connected,
biased at 101 V with shielded cables. BB7
is still connected but not biased (same configuration |
|
717
|
Thu Jul 24 13:36:34 2025 |
CC, MP, NK | AIDA05 connected and disconnected compared to AIDA09 | HT cable shielded, HT
of upstream AIDA from iseg, HT of downstream
AIDA from CAEN. Both channel 0 and 1 of CAEN |
10x |
718
|
Thu Jul 24 15:50:01 2025 |
CC, MP, NK | Check of BB7 impact | HT of upstream AIDA from iseg, HT
cable shielded, 100V, 17 uA. HT
of downstream AIDA from CAEN, AIDA#0. Both |
   |
574
|
Mon Apr 15 09:23:43 2024 |
CC, JB, HMA, TD | Noise in AIDA when connecting BB7 | 9:40 started up AIDA. TEMP OK. Noise condition
same as Saturday. Attachments 1-3.
9:56 BB7 premaps connected but |
13x |
41
|
Tue Apr 2 07:39:44 2019 |
CB, TD, CA | Tuesday 2nd April 2019 | 08:15 beam tuning in progress
08.30 System wide checks
|
36x |
429
|
Wed May 11 19:08:41 2022 |
CB, PP | Wednesday 11th May - evening shift | 20:19 no beam yet.
Statistic check (screenshot attached).
Temperatures OK (screenshot attached). |
   |
308
|
Wed May 12 15:03:10 2021 |
CB, OH | Wed 12 16:00-20:00 | 16:00 Shift change
Statistics OK (attach 1)
|
15x |
317
|
Fri May 14 14:57:32 2021 |
CB + OH, TD, NH | Friday 14th May 16:00-20:00 | 16:00 Shift taken over from CA
16:00
|
33x |
249
|
Mon Apr 19 19:19:18 2021 |
CB | Monday 19 April 20:00-24:00 shift | 20:19
Statistics OK (attach 1)
No faults found
|
11x |
252
|
Tue Apr 20 10:54:41 2021 |
CB | April 20 12:00 - 16:00 shift | 11:55 CA got AIDA back online
12:00 Stats OK (attach 1)
|
9x |
324
|
Tue May 18 14:57:43 2021 |
CB | Tuesday 18th May 16:00 - 20:00 | 15:58 Took shift over from OH and PP
Stats OK - attach 1
|
11x |
332
|
Wed May 19 14:54:36 2021 |
CB | Wednesday 19 May 16:00 - 20:00 | 15:55 Took over from OH
16:00
|
11x |
443
|
Fri May 13 15:00:23 2022 |
CB | 13 March - 16:00-24:00 shift | 16:00 Took over remotely from OH, TD who remain
in GSI
|
10x |
142
|
Wed Mar 11 17:21:33 2020 |
CA, TD, OH | Wednesday 11 March 16.00-00.00 | 18.25 DAQ currently running No Storage mode
ASIC settings 2019Oct31-13.24.23
|
23x |
15
|
Wed Jan 23 08:12:01 2019 |
CA, TD, NH, VP | January 22nd 2019 | Attachment 1 - 1.8.W waveform spectra with
pulser signal
|
   |
16
|
Wed Jan 23 09:25:55 2019 |
CA, TD, NH, VP | MACB and setup pics 23.01.19 | Pictures of leaking cooling pipe
MACB switch settings
|
11x |
17
|
Wed Jan 23 17:03:08 2019 |
CA, TD, NH, VP | January 23rd 2019 | Post White Rabbit update
Attachment 1 - 1.8.W pulser waveform spectra |
6x |
18
|
Thu Jan 24 10:21:26 2019 |
CA, TD, NH, VP | January 24th 2019 | 10.30 AIDA setup and DAQ start complete
writing to file TapeData/NULL/R1
|
7x |
22
|
Thu Jan 24 17:16:32 2019 |
CA, TD, NH, VP | MACB time switch settings | AIDA@DESPEC MACB time switch settings before
and after WR are as follows.
|
 |
|