AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DESPEC, Page 32 of 36  ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
Entry  Wed Jul 23 15:04:26 2025, CC, MP, NK, Test of AIDA05 with BB7 connected to Mesytec but not biased Screenshot_from_2025-07-23_16-16-57.png
Attachment1: AIDA05.1.8L when AIDA05 connected, biased at 100 V with not-shielded cables, after the DEGAS platform has been closed, the 2 tiles of BB7
have been connected to the mesytec preamps. BB7 is not biased. The mesytec preamps have been fully connected and supplied but 6/8 black cables are not
connected on the other side. 4X and 4Y are connected to the 2 FEBEX cards.
Entry  Wed Jul 23 15:56:00 2025, CC, MP, NK, Test of AIDA05 with new bias module Screenshot_from_2025-07-23_17-08-56.png
Attachment1: AIDA05.1.8L when AIDA05 connected, biased at 101 V with shielded cables. BB7 is still connected but not biased (same configuration as the
previous elog). The channel of the CAEN power supply #0 is connected to ASIC08 and biased at 100V. The channel of the CAEN power supply #1 is disconnected
but still biased at 100V. AIDA04 (chained to AIDA05) is biased via a shielded cable to an iseg NHQ 246L power supplied, biased at 101 V with 16 uA.
Entry  Thu Jul 24 13:36:34 2025, CC, MP, NK, AIDA05 connected and disconnected compared to AIDA09 10x
HT cable shielded, HT of upstream AIDA from iseg, HT of downstream AIDA from CAEN. Both channel 0 and 1 of CAEN are on, even though
there is just one channel connected. During this test, some parallele tests are being done on BB7 Mesytec. In general, middle tile: detector disconnected
from preamps but preamps connected on the other side.  Right tile: detector connected to preamps, cable shielded but preamps disconnected on the other
Entry  Thu Jul 24 15:50:01 2025, CC, MP, NK, Check of BB7 impact Screenshot_from_2025-07-24_16-49-27.pngScreenshot_from_2025-07-24_17-03-44.pngScreenshot_from_2025-07-24_17-22-49.pngScreenshot_from_2025-07-24_17-29-38.png
HT of upstream AIDA from iseg, HT cable shielded, 100V, 17 uA. HT of downstream AIDA from CAEN, AIDA#0. Both channel 0 and 1 of CAEN
are on, even though there is just one channel connected. DEGAS platform closed. The crates of BB7 and bplast have been put to the ground of the AIDA's
structure (cupper sheet)
Entry  Mon Apr 15 09:23:43 2024, CC, JB, HMA, TD, Noise in AIDA when connecting BB7 13x
9:40 started up AIDA. TEMP OK. Noise condition same as Saturday. Attachments 1-3.

9:56 BB7 premaps connected but not powered. Attahcment 4.

10:20 BB7 Preamps powered. Attachment 5.
Entry  Tue Apr 2 07:39:44 2019, CB, TD, CA, Tuesday 2nd April 2019 36x
08:15 beam tuning in progress

08.30 System wide checks 
Entry  Wed May 11 19:08:41 2022, CB, PP, Wednesday 11th May - evening shift 16.png22.png13.png14.png
20:19 no beam yet.

Statistic check (screenshot attached).

Temperatures OK (screenshot attached).
Entry  Wed May 12 15:03:10 2021, CB, OH, Wed 12 16:00-20:00 15x
16:00 Shift change

Statistics OK (attach 1)
Entry  Fri May 14 14:57:32 2021, CB + OH, TD, NH, Friday 14th May 16:00-20:00 33x
16:00 Shift taken over from CA

16:00 
Entry  Mon Apr 19 19:19:18 2021, CB, Monday 19 April 20:00-24:00 shift 11x
20:19 
Statistics OK (attach 1)
No faults found
Entry  Tue Apr 20 10:54:41 2021, CB, April 20 12:00 - 16:00 shift 9x
11:55 CA got AIDA back online

12:00 Stats OK (attach 1)
Entry  Tue May 18 14:57:43 2021, CB, Tuesday 18th May 16:00 - 20:00 11x
15:58 Took shift over from OH and PP

Stats OK - attach 1
Entry  Wed May 19 14:54:36 2021, CB, Wednesday 19 May 16:00 - 20:00 11x
15:55 Took over from OH

16:00
Entry  Fri May 13 15:00:23 2022, CB, 13 March - 16:00-24:00 shift 10x
16:00 Took over remotely from OH, TD who remain in GSI

      Stats OK - attach 1
Entry  Wed Mar 11 17:21:33 2020, CA, TD, OH, Wednesday 11 March 16.00-00.00 23x
18.25 DAQ currently running No Storage mode

ASIC settings 2019Oct31-13.24.23
Entry  Wed Jan 23 08:12:01 2019, CA, TD, NH, VP, January 22nd 2019 220119_18W.png220119_pulserpeaks.png220119_stats.png220119_Temp.png
Attachment 1 - 1.8.W waveform spectra with pulser signal

Attachment 2 - 1.8.L pulser peak spectra
Entry  Wed Jan 23 09:25:55 2019, CA, TD, NH, VP, MACB and setup pics 23.01.19 11x
Pictures of leaking cooling pipe

MACB switch settings
Entry  Wed Jan 23 17:03:08 2019, CA, TD, NH, VP, January 23rd 2019 6x
Post White Rabbit update

Attachment 1 - 1.8.W pulser waveform spectra for all FEE64
Entry  Thu Jan 24 10:21:26 2019, CA, TD, NH, VP, January 24th 2019 7x
10.30 AIDA setup and DAQ start complete
      writing to file TapeData/NULL/R1
Entry  Thu Jan 24 17:16:32 2019, CA, TD, NH, VP, MACB time switch settings 50668223_286084358731841_9104059387265155072_n.jpgdespecmacb.pdf
AIDA@DESPEC MACB time switch settings before and after WR are as follows.

Attachment 1 - MACB 1-4 from left to right
ELOG V3.1.4-unknown