Wed Jul 23 15:04:26 2025, CC, MP, NK, Test of AIDA05 with BB7 connected to Mesytec but not biased
|
Attachment1: AIDA05.1.8L when AIDA05 connected, biased at 100 V with not-shielded cables, after the DEGAS platform has been closed, the 2 tiles of BB7
have been connected to the mesytec preamps. BB7 is not biased. The mesytec preamps have been fully connected and supplied but 6/8 black cables are not
connected on the other side. 4X and 4Y are connected to the 2 FEBEX cards. |
Wed Jul 23 15:56:00 2025, CC, MP, NK, Test of AIDA05 with new bias module
|
Attachment1: AIDA05.1.8L when AIDA05 connected, biased at 101 V with shielded cables. BB7 is still connected but not biased (same configuration as the
previous elog). The channel of the CAEN power supply #0 is connected to ASIC08 and biased at 100V. The channel of the CAEN power supply #1 is disconnected
but still biased at 100V. AIDA04 (chained to AIDA05) is biased via a shielded cable to an iseg NHQ 246L power supplied, biased at 101 V with 16 uA. |
Thu Jul 24 13:36:34 2025, CC, MP, NK, AIDA05 connected and disconnected compared to AIDA09 10x
|
HT cable shielded, HT of upstream AIDA from iseg, HT of downstream AIDA from CAEN. Both channel 0 and 1 of CAEN are on, even though
there is just one channel connected. During this test, some parallele tests are being done on BB7 Mesytec. In general, middle tile: detector disconnected
from preamps but preamps connected on the other side. Right tile: detector connected to preamps, cable shielded but preamps disconnected on the other |
Thu Jul 24 15:50:01 2025, CC, MP, NK, Check of BB7 impact   
|
HT of upstream AIDA from iseg, HT cable shielded, 100V, 17 uA. HT of downstream AIDA from CAEN, AIDA#0. Both channel 0 and 1 of CAEN
are on, even though there is just one channel connected. DEGAS platform closed. The crates of BB7 and bplast have been put to the ground of the AIDA's
structure (cupper sheet) |
Mon Apr 15 09:23:43 2024, CC, JB, HMA, TD, Noise in AIDA when connecting BB7 13x
|
9:40 started up AIDA. TEMP OK. Noise condition same as Saturday. Attachments 1-3.
9:56 BB7 premaps connected but not powered. Attahcment 4.
10:20 BB7 Preamps powered. Attachment 5. |
Tue Apr 2 07:39:44 2019, CB, TD, CA, Tuesday 2nd April 2019 36x
|
08:15 beam tuning in progress
08.30 System wide checks
|
Wed May 11 19:08:41 2022, CB, PP, Wednesday 11th May - evening shift   
|
20:19 no beam yet.
Statistic check (screenshot attached).
Temperatures OK (screenshot attached). |
Wed May 12 15:03:10 2021, CB, OH, Wed 12 16:00-20:00 15x
|
16:00 Shift change
Statistics OK (attach 1)
|
Fri May 14 14:57:32 2021, CB + OH, TD, NH, Friday 14th May 16:00-20:00 33x
|
16:00 Shift taken over from CA
16:00
|
Mon Apr 19 19:19:18 2021, CB, Monday 19 April 20:00-24:00 shift 11x
|
20:19
Statistics OK (attach 1)
No faults found
|
Tue Apr 20 10:54:41 2021, CB, April 20 12:00 - 16:00 shift 9x
|
11:55 CA got AIDA back online
12:00 Stats OK (attach 1)
|
Tue May 18 14:57:43 2021, CB, Tuesday 18th May 16:00 - 20:00 11x
|
15:58 Took shift over from OH and PP
Stats OK - attach 1
|
Wed May 19 14:54:36 2021, CB, Wednesday 19 May 16:00 - 20:00 11x
|
15:55 Took over from OH
16:00
|
Fri May 13 15:00:23 2022, CB, 13 March - 16:00-24:00 shift 10x
|
16:00 Took over remotely from OH, TD who remain in GSI
Stats OK - attach 1
|
Wed Mar 11 17:21:33 2020, CA, TD, OH, Wednesday 11 March 16.00-00.00 23x
|
18.25 DAQ currently running No Storage mode
ASIC settings 2019Oct31-13.24.23
|
Wed Jan 23 08:12:01 2019, CA, TD, NH, VP, January 22nd 2019   
|
Attachment 1 - 1.8.W waveform spectra with pulser signal
Attachment 2 - 1.8.L pulser peak spectra
|
Wed Jan 23 09:25:55 2019, CA, TD, NH, VP, MACB and setup pics 23.01.19 11x
|
Pictures of leaking cooling pipe
MACB switch settings
|
Wed Jan 23 17:03:08 2019, CA, TD, NH, VP, January 23rd 2019 6x
|
Post White Rabbit update
Attachment 1 - 1.8.W pulser waveform spectra for all FEE64
|
Thu Jan 24 10:21:26 2019, CA, TD, NH, VP, January 24th 2019 7x
|
10.30 AIDA setup and DAQ start complete
writing to file TapeData/NULL/R1
|
Thu Jan 24 17:16:32 2019, CA, TD, NH, VP, MACB time switch settings 
|
AIDA@DESPEC MACB time switch settings before and after WR are as follows.
Attachment 1 - MACB 1-4 from left to right
|