AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  ISOLDE, Page 7 of 11  ELOG logo
ID Date Author Subject Text Attachments
  85   Fri Nov 10 10:46:54 2017 SLInvestigation of E detector thicknessWhile changing HI degrader foil to 10um
Al, the E detector was investigated, due
to previously observed alpha punch-through.
  
  84   Fri Nov 10 08:31:06 2017 TDCAEN V767 TDC trigger/channel 0 logic changeApproximately 5-10% of events overnight were
'bad' i.e. missing TDC data
  
  83   Fri Nov 10 07:00:14 2017 MD, CLW, ASM, TDRun 80
Header: 4.7 MeV/u and CH2_30+25.
Ender: beam stop at PS (6 hour interruption)
 171110_only2of4cycles_problemRing2.jpg171110_0821_beamstop_6hours_nobeam.jpg 
  82   Fri Nov 10 04:53:34 2017 MD, ASMRun 79Header: 4.7 MeV/u and CH2_30+25.
Ender: 
====================================================
 171110_only2of4cycles_problemRing2.jpg 
  81   Fri Nov 10 04:18:41 2017 MD, ASMRun 78Header: 4.7 MeV/u and Empty frame.
Ender: 
====================================================
  
  80   Fri Nov 10 02:12:06 2017 MD, ASM, DKRun 77
Header: 4.7 MeV/u and C_09. continue after
fixing IHS Cavity (part of normal conducting
  
  79   Fri Nov 10 01:29:51 2017 ASM, MD, DKrun 75Header: 4.7 MeV/u and C_09. PS back, but need
to check how much beam actually there was
before next issue
  
  78   Thu Nov 9 23:10:38 2017 MDpreparation for Carbon C_09 (Run 75)10/11/17: 00:03

switch target ladder to Pos #5: 82.44 mm
  
  77   Thu Nov 9 21:31:16 2017 SLRun 74
Header: 4.7 MeV/u and CH2_30+25. 
Ender:
STOP due to PSB fire.
====================================================
Run
number : 74
Date : 09/11
Start time :
 Screen_Shot_2017-11-09_at_22.35.20.pngScreen_Shot_2017-11-09_at_22.38.49.pngScreen_Shot_2017-11-10_at_13.54.40.png 
  76   Thu Nov 9 20:46:29 2017 SLRun 73
Header: 4.7 MeV/u and CH2_30+25.
Ender:
NO BEAM FROM PSB - called CCC and stopped
run.
====================================================
Run
 Screen_Shot_2017-11-09_at_22.38.49.png 
  75   Thu Nov 9 19:06:08 2017 SLRun 68-71JUNK   
  74   Thu Nov 9 18:56:13 2017 SLRun 72
Header: 4.7 MeV/u and CH2_30+25.
Ender:

====================================================
Run
number : 72
Date : 09/11
Start time :
  
  73   Thu Nov 9 17:35:32 2017 RGRun 67
Header: 4.7 MeV/u and CH2_30+25. 
Ender:

====================================================
Run
number : 67
Date : 09/11
Start time :
  
  72   Thu Nov 9 17:01:49 2017 TDCAEN V560 Scalers added to datastreamCAEN V560 Scaler channels #0-7 have been added
to the EbyE datastream by adding
per event readout of defined VME registers
  
  71   Thu Nov 9 16:30:15 2017 SLRun 66
Header: 4.7 MeV/u and CH2_30+25. UPDATED
Trigger (p+n E OR p+n HI (with 2^8 prescaler))
Ender:

====================================================
Run
  
  70   Thu Nov 9 15:55:56 2017 SLRun 65
Header: 4.7 MeV/u and CH2_30+25. UPDATED
Trigger (E - corrected, not HI, now ~50%
live time)
Ender: 
====================================================
Run
  
  69   Thu Nov 9 15:34:14 2017 SLRun 64
Header: 4.7 MeV/u and CH2_30+25. UPDATED
Trigger (JUST E, not HI, now ~50% live time)
Ender:
Stopping as trigger seems slightly off
====================================================
Run
  
  68   Thu Nov 9 15:03:21 2017 SLRun 63
Header: 4.7 MeV/u and CH2_30+25. UPDATED
Trigger (dE+E, not HI, now ~50% live time)
Ender:

====================================================
Run
  
  67   Thu Nov 9 12:15:33 2017 SLTIMBER: Faraday Cup MeasurementsFaraday Cup (at end of Edinburgh chamber) measurements
recorded in TIMBER (from approx 10.00 9/11/17).
  
  66   Thu Nov 9 12:14:05 2017 SLRun 62
Header: 4.7 MeV/u and CH2_30+25. 
Ender:

====================================================
Run
number : 62
Date : 9 / 11
Start time :
  
ELOG V3.1.4-unknown