| ID |
Date |
Author |
Subject |
Text |
 |
|
656
|
Sun Jun 11 16:04:12 2017 |
DK | Monday 12 June 0:00 ~ 8:00 | 0:04 Biases and leak currents shown as
attachment #1, 12JunBias1.png
System-wide checks: nnaida13 fails |
10x | |
852
|
Tue Jun 18 08:03:20 2019 |
DK | Tuesday 18 June 16:00 - 24:00 | Shift change
16:00
|
15x | |
30
|
Tue Feb 10 16:01:50 2015 |
Chris Griffin, Alfredo Estrade | High data rate - Pause/Resume | 06/02/15
A look at the data rate at
which Pause/Resumes start to cause missing |
6x | |
14
|
Wed Oct 1 18:37:42 2014 |
Chris Griffin | 01/10/2014 Tests @ DL | Kept largely the same settings at the entry https://elog.ph.ed.ac.uk/AIDA/4
Same ASIC
settings |
11x | |
16
|
Sun Oct 5 22:42:56 2014 |
Chris Griffin | DL tests on 02/10/14 | A late entry for the work I carried
out on Thursday.
With the Emco box providing the HV, |
17x | |
886
|
Wed Aug 9 14:40:28 2023 |
Carole, Nic, Jeroen | AIDA HV SUPPLY & PULSER TEST | Tests with the HV supply (CAEN N1419ET)
and Pulse Generator ( BNC PB-5 ) in the detector
lab on the crate behind the DEGAS detectors, |
    | |
190
|
Fri Apr 29 11:11:20 2016 |
CG,PV,TD | Friday 29 April |
MSL type BB18 serial # 2977-20 bias +100V
I_L +12.0uA T=23 deg C
|
6x | |
191
|
Sat Apr 30 07:46:47 2016 |
CG,PV,TD | Saturday 30 April 2016 | MSL type BB18 serial # 2977-20 bias +100V
I_L +12.45uA T=23 deg C
(biased by nnaida # 3 & 5 )
|
11x | |
193
|
Sun May 1 07:59:08 2016 |
CG,PV,TD | AIDA Detector Configuration |
UPSTREAM
|
| |
197
|
Mon May 2 12:13:25 2016 |
CG,PV,TD | Monday 2 May 2016 | |
22x | |
213
|
Thu May 5 11:10:36 2016 |
CG,PV,TD | Thursday 5 May 2016 | Detector configuration - see https://elog.ph.ed.ac.uk/AIDA/193
Ribbon cable to nnaida19 FEE adaptor PCB |
8x | |
59
|
Mon Apr 20 09:07:59 2015 |
CG, TD, Patrick Coleman-Smith | Progress 20th April + RPi procedure + reply |
|
| |
60
|
Mon Apr 20 09:38:15 2015 |
CG, TD, Patrick Coleman-Smith | Progress 20th April + RPi procedure + reply |
|
| |
61
|
Mon Apr 20 09:45:38 2015 |
CG, TD, Patrick Coleman-Smith | Progress 20th April + RPi procedure + reply ++ |
|
| |
120
|
Sat Nov 14 20:19:43 2015 |
CG, TD, PJCS | 13 Nov 2015 - new Kapton cable tests at DL |
|
| |
126
|
Wed Nov 25 19:24:39 2015 |
CG, TD, PJCS | New Kapton cable tests at DL | Powered system on and biased to +200V at
room temp of 22.4oC. Leakage current of 3.37uA.
Waveforms very noisy and spectra |
6x | |
137
|
Wed Jan 6 16:06:32 2016 |
CG, TD, PJCS | Report: Low - RPi power cable can't be fully inserted due to case conflict - solved |
|
| |
423
|
Sat Nov 5 01:55:15 2016 |
CG, TD, OH | Saturday 5th November | 10.55 DAQ found to have stopped at 06:47 during
LN fill cycle.
|
20x | |
436
|
Tue Nov 8 15:10:16 2016 |
CG, TD, DK, OH | NP1412 R5 R6 | 00.15 Setting changed to 71,72,73Ni. All variable
degraders in.
Will remove while watching rates to |
 | |
291
|
Tue Jun 7 19:19:34 2016 |
CG, TD, DK, AE | Wednesday 8th June | (4 mm Al mask was put upstream of AIDA
near 20:20 on 7 June)
|
27x |
|