AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA, Page 36 of 46  ELOG logo
ID Date Authorup Subject Text Attachments
  820   Wed May 29 06:53:56 2019 TDReport - medium - unable to monitor FEE64 logs using pi_monitor
Unable to monitor FEE64 logs using pi_monitor
using instructions https://elog.ph.ed.ac.uk/AIDA/559
 10.png11.png12.png 
  821   Thu May 30 03:13:04 2019 TDThursday 30 May
11.13 DAQ continues OK
 16x 
  822   Fri May 31 03:31:54 2019 TDFriday 31 May11.31 DAQ continues OK

      ASIC settings 2019May19-17.54.03
 14x 
  823   Sat Jun 1 08:11:15 2019 TDSaturday 1 June16.08 Julabo FL11006 chiller set point +20
deg C actual +20.0 deg C
      Water level c. 60% M-H markers - topup
 14x 
  824   Sat Jun 1 09:14:19 2019 TDScreenshots miscellaneous AIDA Control & Merge tabs    22x 
  826   Sun Jun 2 04:00:50 2019 TDSunday 2 June12.00 DAQ continues file May19/R15_169

      ASIC settings 2019May19-17.54.03
 21x 
  827   Mon Jun 3 05:40:19 2019 TDMonday 3 June13.40 DAQ continues OK

      ASIC settings 2019May19-17.54.03
 25x 
  828   Tue Jun 4 07:10:27 2019 TDTuesday 4 June15.01 Julabo FL11006 chiller set point +20
deg C actual +20.0 deg C
      Water level c. 70% M-H markers - topup
 13x 
  829   Wed Jun 5 06:57:38 2019 TDWednesday 5 June14.50 DAQ continues OK

      ASIC settings 2019May19-17.54.03
 13x 
  830   Thu Jun 6 08:55:15 2019 TDThursday 6 June16.40 DAQ continues OK

      ASIC settings 2019May19-17.54.03
 13x 
  831   Fri Jun 7 05:30:23 2019 TDFriday 7 June14.05 Julabo FL11006 chiller set point +20
deg C actual +20.0 deg C
      Water level c. 70% M-H markers
 17x 
  832   Fri Jun 7 05:58:11 2019 TDper FEE64 rate/20.48us versus slow comparator threshold
per FEE64 rate/20.48us & 'good event' DAQ
statistics 
 10x 
  861   Thu Nov 14 07:57:46 2019 TDAIDA moved from in-beam position at F11
To make room for the installation of an MR-TOF
device at F11, AIDA and DTAS have been removed
  
  868   Thu Jul 6 10:20:25 2023 TDUnable to start Rly16 server
Unable to start Rly16 server - see attachment
1
 Screenshot_from_2023-07-06_10-18-59.png 
  869   Fri Jul 7 10:15:09 2023 TDTest of AIDA FEE64 d8:80:39:41:f6:ee ( aida01 ) - HDMI connector replaced
Test of AIDA FEE64 d8:80:39:41:f6:ee ( aida01
) - HDMI connector replaced. Cooling plate
 17x 
  871   Fri Jul 7 11:59:06 2023 TDTest of AIDA FEE64 - summaryTest of AIDA FEE64s 

ISOL test station STFC DL, T9
 11x 
  872   Sun Jul 16 09:36:40 2023 TD15-16 July 2023
Saturday 15 July
 40x 
  873   Sun Jul 16 14:20:31 2023 TDSunday 16 July contd.15.20 All ERNI pins of aida01 adaptor PCB
OK => FEE64 #1 ASIC #2 channel #5 issue faulty
test C? faulty ASIC channel?
 27x 
  874   Sat Jul 22 08:17:48 2023 TDSaturday 22 July09.20 CAEN N1419ET 
      Floating outputs
      Channel #3 + polarity, Channels #0-2
 26x 
  875   Sun Jul 23 08:50:48 2023 TDSunday 23 July09.50 Cooknell HV2
      2x + polarity, grounded HV channels
 19x 
ELOG V3.1.4-unknown