Tue Aug 31 18:34:41 2021, CB RSS + DR OG, CARME on Al stand    
|
Lifted CARME off the floor and mounted feet on sides. It was found impossible to put four bolts for each foot
due to alignment conflict. Three bolts were mounted per foot instead.
|
Wed Jun 18 14:21:39 2025, CB, CARME off
|
15:20
DAQ stopped
Merger & Tape Server stopped |
Thu Jul 17 07:07:56 2025, CB, CARME off   
|
08:07 CEST
Temperatures ok - attached
DSSDs on. Leakage currents still high. - attached |
Wed Sep 1 17:14:16 2021, CB RSS + DR ML, CARME mounted on the CRYRING    
|
Lifted CARME with Al support on the
CRYRING. No issues during transportation.
|
Fri Aug 12 15:12:37 2022, JM, TD, CARME measurements 9x
|
measurement 1 -string
intermediate (smaller) chamber - 2144 (mm) circumference, measured half circumference 1072 mm
outer (larger) chamber - 2160 (mm) circumference, measured 1/4 circumference 540mm |
Wed Sep 22 14:44:51 2021, JM RSS ML, CARME leak test + bakeout tent    
|
On 21/9/21 CARME was connected to the leak tester. Leak testing showed no apparent leaks, extra time required to reach <1e-4 mbar during initial turbo
pumpdown might be due to outgassing from additional installed components on the chamber. Turbo pump restarted
21/9/21 16:28 9.73e-7 mbar |
Mon Sep 20 11:45:45 2021, JM RSS ML, CARME installations 6x
|
Ion pump, RGA and additional gauge installed on the chamber.
Our gauge is the one mounted above the NEG feedthrough, Michael's gauge is mounted below the feedthrough. Ion pump too large to install on
the top of the vessel, sufficient room on flange immediately next to this top flange. |
Tue Sep 21 08:20:39 2021, ML, CARME installations
|
Quote:
Ion pump, RGA and additional gauge installed on the chamber. |
Thu Oct 7 08:40:09 2021, CB RSS, CARME in XHV
|
CARME reached 9E-12 this morning
Ion pumps on
|
Wed Apr 9 10:02:21 2025, TD, CARME equipment in CRYRING area moved 
|
There was some tidying up of the CRYRING hall in advance of this week's EC evaluation meeting at GSI.
|
Wed Apr 26 16:49:28 2023, CB, JM, CARME dolly mostly built  
|
Disconnected cables from CARME motors and turbo. The turbo has to go to allow Carme to slide out. Crane may be required to lift because it's in a
very hard spot to access.
|
Thu Sep 2 10:41:16 2021, CB RSS + DR OG, CARME connected to the CRYRING
|
Connected CARME to the CRYRING via tube
plus bellows. See attach.
|
Tue Jan 16 14:36:30 2024, TD, CARME configuration    
|
FEE64
|
Sun Oct 31 08:05:15 2021, CB OH + DR ML, CARME closed again + feedthroughs labeled 11x
|
(Fri 29 October)
Cleaned wire seal recess and labeled thermocouples and flanges to identify p-n vs. n-n side and ports with bias pin. See attached in case baking
damages the label. |
Thu Jul 13 00:12:45 2023, JM, CB, CARME closed  
|
The CARME chamber was closed and pushed back into position on the ring.
Prior to moving back onto the ring, the detectors were bias tested and the distance between the detectors was also checked using the motors.
Bias test was performed before the detector movement tests and before moving the chamber back onto the ring. |
Wed Nov 17 07:12:22 2021, RSS CB + ML (remotely), CARME baking with tape continues 17 Nov 7x
|
CARME baking with heating tape continues
Left overnight at -
Ch1-3: 140 degrees |
Tue Nov 16 12:05:13 2021, CB RSS, CARME baking with tape continues   
|
CARME baking with heating tape continues
Left overnight at 100C. Turned up this morning at 9:00 to 120C.
All good except detector strain relief seems to be going much higher than detector (no obvious reason) and then cool down. Proximity to flange |
Tue Sep 28 12:18:54 2021, RSS JM, CARME baking status -9 
|
Current temperature ~130 C, was set to 130 C on manual mode around 10:00 am
See plot and screen attached.
Current pressure ~1.37E-6 mbar
See
https://uoe-my.sharepoint.com/:x:/g/personal/cbruno2_ed_ac_uk/EVbsVOubNHRLj0PKiFIvd00BClMJ6WSJ1UDAyLA2F3R4jA?rtime=OK4kVZKB2Ug
http://web-docs.gsi.de/~lestinsk/vacplot.php |
Tue Sep 28 06:40:22 2021, RSS JM, CARME baking status -8 
|
Current temperature ~120 C, increasing
See plot and screen attached.
Current pressure ~1.07E-6 mbar
See
https://uoe-my.sharepoint.com/:x:/g/personal/cbruno2_ed_ac_uk/EVbsVOubNHRLj0PKiFIvd00BClMJ6WSJ1UDAyLA2F3R4jA?rtime=OK4kVZKB2Ug
http://web-docs.gsi.de/~lestinsk/vacplot.php |
Mon Sep 27 21:33:50 2021, CB (remotely), CARME baking status -7 
|
Current temperature ~87 C, increasing
See plot and screen attached.
Thermocouple on CARME foot side (1-4) may have come loose judging from sudden jump in temperature at 14:30?
|