Entry  Tue Aug 31 18:34:41 2021, CB RSS + DR OG, CARME on Al stand 20210831_144545.jpg20210831_171442.jpg20210831_171447.jpg20210831_171449.jpg20210831_171453.jpg
Lifted CARME off the floor and mounted feet on sides. It was found impossible to put four bolts for each foot
due to alignment conflict. Three bolts were mounted per foot instead.
Entry  Wed Jun 18 14:21:39 2025, CB, CARME off Screenshot_from_2025-06-18_15-18-31.png
15:20

DAQ stopped

Merger & Tape Server stopped
Entry  Thu Jul 17 07:07:56 2025, CB, CARME off Capture.PNG2.PNG3.PNGCapture.PNG
08:07 CEST

Temperatures ok - attached

DSSDs on. Leakage currents still high. - attached
Entry  Wed Sep 1 17:14:16 2021, CB RSS + DR ML, CARME mounted on the CRYRING 20210901_162435.jpg20210901_173059.jpg20210901_174157.jpg20210901_134635.jpg20210901_173059.jpg
Lifted CARME with Al support on the 
CRYRING. No issues during transportation. 
Entry  Fri Aug 12 15:12:37 2022, JM, TD, CARME measurements 9x
measurement 1 -string
intermediate (smaller) chamber - 2144 (mm) circumference,  measured half circumference 1072 mm 
outer (larger) chamber - 2160 (mm) circumference, measured 1/4 circumference 540mm
Entry  Wed Sep 22 14:44:51 2021, JM RSS ML, CARME leak test + bakeout tent 20210922_145646.jpg20210922_145933.jpg20210922_151728.jpg20210922_152052.jpg20210922_152113.jpg
On 21/9/21 CARME was connected to the leak tester. Leak testing showed no apparent leaks, extra time required to reach <1e-4 mbar during initial turbo
pumpdown might be due to outgassing from additional installed components on the chamber. Turbo pump restarted 

21/9/21 16:28    9.73e-7 mbar
Entry  Mon Sep 20 11:45:45 2021, JM RSS ML, CARME installations 6x
Ion pump, RGA and additional gauge installed on the chamber.

Our gauge is the one mounted above the NEG feedthrough, Michael's gauge is mounted below the feedthrough. Ion pump too large to install on
the top of the vessel, sufficient room on flange immediately next to this top flange.  
    Reply  Tue Sep 21 08:20:39 2021, ML, CARME installations 
 




Quote:



Ion pump, RGA and additional gauge installed on the chamber.
Entry  Thu Oct 7 08:40:09 2021, CB RSS, CARME in XHV 
CARME reached 9E-12 this morning

Ion pumps on
Entry  Wed Apr 9 10:02:21 2025, TD, CARME equipment in CRYRING area moved 20250409_102115.jpg20250409_101705.jpg

There was some tidying up of the CRYRING hall in advance of this week's EC evaluation meeting at GSI.
Entry  Wed Apr 26 16:49:28 2023, CB, JM, CARME dolly mostly built  20230426_152121.jpg20230426_162619.jpg20230426_162627.jpg
Disconnected cables from CARME motors and turbo. The turbo has to go to allow Carme to slide out. Crane may be required to lift because it's in a
very hard spot to access.

 
Entry  Thu Sep 2 10:41:16 2021, CB RSS + DR OG, CARME connected to the CRYRING 20210902_114031.jpg
Connected CARME to the CRYRING via tube 
plus bellows. See attach.
Entry  Tue Jan 16 14:36:30 2024, TD, CARME configuration dhcpd.confOptionsSettingsstartup.tclrfs

FEE64
Entry  Sun Oct 31 08:05:15 2021, CB OH + DR ML, CARME closed again + feedthroughs labeled 11x
(Fri 29 October)

Cleaned wire seal recess and labeled thermocouples and flanges to identify p-n vs. n-n side and ports with bias pin. See attached in case baking
damages the label.
Entry  Thu Jul 13 00:12:45 2023, JM, CB, CARME closed Bias110723.pngfullyin.jpgfullyin-measured.jpg
The CARME chamber was closed and pushed back into position on the ring. 

Prior to moving back onto the ring, the detectors were bias tested and the distance between the detectors was also checked using the motors.
Bias test was performed before the detector movement tests and before moving the chamber back onto the ring.  
Entry  Wed Nov 17 07:12:22 2021, RSS CB + ML (remotely), CARME baking with tape continues 17 Nov 7x
CARME baking with heating tape continues

Left overnight at -

Ch1-3: 140 degrees
Entry  Tue Nov 16 12:05:13 2021, CB RSS, CARME baking with tape continues CARMEtemps.png20211116_132048.jpg20211116_155138.jpg20211116_155857.jpg
CARME baking with heating tape continues

Left overnight at 100C. Turned up this morning at 9:00 to 120C.

All good except detector strain relief seems to be going much higher than detector (no obvious reason) and then cool down. Proximity to flange
Entry  Tue Sep 28 12:18:54 2021, RSS JM, CARME baking status -9 Screenshot_from_2021-09-28_13-17-51_1.pngScreenshot_from_2021-09-28_13-18-18.png

Current temperature ~130 C, was set to 130 C on manual mode around 10:00 am
See plot and screen attached.

Current pressure ~1.37E-6 mbar
See
https://uoe-my.sharepoint.com/:x:/g/personal/cbruno2_ed_ac_uk/EVbsVOubNHRLj0PKiFIvd00BClMJ6WSJ1UDAyLA2F3R4jA?rtime=OK4kVZKB2Ug
http://web-docs.gsi.de/~lestinsk/vacplot.php
Entry  Tue Sep 28 06:40:22 2021, RSS JM, CARME baking status -8 Screenshot_from_2021-09-28_07-38-53.pngScreenshot_from_2021-09-28_07-39-22.png

Current temperature ~120 C, increasing
See plot and screen attached.

Current pressure ~1.07E-6 mbar
See
https://uoe-my.sharepoint.com/:x:/g/personal/cbruno2_ed_ac_uk/EVbsVOubNHRLj0PKiFIvd00BClMJ6WSJ1UDAyLA2F3R4jA?rtime=OK4kVZKB2Ug
http://web-docs.gsi.de/~lestinsk/vacplot.php
Entry  Mon Sep 27 21:33:50 2021, CB (remotely), CARME baking status -7 Temps.pngScreen.png
Current temperature ~87 C, increasing
See plot and screen attached.
Thermocouple on CARME foot side (1-4) may have come loose judging from sudden jump in temperature at 14:30?