AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 9 of 33  ELOG logo
Entry  Thu Feb 8 11:22:28 2024, JM, Shifters instruction 2024 
EMERGENCY SHUTDOWNS

1. CARME motors: Q key on keyboard while on workspace 1 of appc218 (right of this double-monitor setup)

2. Internal target:
Entry  Wed Feb 7 13:50:20 2024, Elena Hanu, Carlo Bruno, Michael Lestinsky, Afternoon shift Screenshot_from_2024-02-07_14-53-36.pngScreenshot_from_2024-02-07_14-56-37.pngScreenshot_from_2024-02-07_14-51-21.png
14:50

 

Temperature, Statistics fine (see screenshots).
Entry  Wed Feb 7 10:09:14 2024, CB, JG, EM, Morning Shift  Screenshot_from_2024-02-07_11-10-08.pngScreenshot_from_2024-02-07_11-10-59.pngScreenshot_from_2024-02-07_11-15-53.pngScreenshot_from_2024-02-07_11-20-38.png
11:00

Changed slow comp threshold to 0x32 (500 keV). Checkloaded.

 
Entry  Tue Feb 6 09:39:54 2024, CB, Detector bias tests 13x
10:30 Found ADC#4 on aida 1 and 4 are suddenly noisy. See attach 1-2. Checkloaded multiple times - no effect.

Leakage current overnight was stable, but a clear transient can be observed yesterday around the times of the DSSD motion test. We did not observe
this in the cave looking at the CAEN module - it might have been too fast.
Entry  Mon Feb 5 20:15:31 2024, CB, TD, Detector move in/out signals 20240205_174307.jpg
17.43 setup signals from detector movement controller.

See attachment 1
Entry  Mon Feb 5 19:43:52 2024, CB, TD, ML, BuTIS reference for VETAR2 20240205_173029.jpg20240205_172957.jpgScreenshot_from_2024-02-05_16-43-18.png

16.40 CB/ML install fibre optic cable from patch panel beneath dipole downstream of YR09/CARME chamber to VETAR2 front panel fibre connector - see attachments
1 & 2.
Entry  Mon Feb 5 12:48:50 2024, CB TD, Pulser walkthough - Run4 Screenshot_from_2024-02-05_14-04-33.pngScreenshot_from_2024-02-05_14-05-16.png

13.41 DAQ start - file G22-88/R4
Entry  Mon Feb 5 05:45:26 2024, CB TD, Run3 - end 47x
06.40 DAQ continues file G22-88/R3_42

      DSSSD bias OK - attachment 1
Entry  Sun Feb 4 08:40:04 2024, CB TD, Run3 - contd 22x
09.30 DAQ continues file G22-88/R3_17

      DSSSD bias OK - attachment 1
Entry  Sat Feb 3 15:05:10 2024, CB, TD, [How To] Restart Anydesk 
1. Check Proxy server is correct

localhost : 8080

incoming connections 7070
Entry  Sat Feb 3 00:13:03 2024, CB TD, Run1 end - R3 start 50x

01.07 DAQ continues file G22-88/R1_46
      background alpha
Entry  Fri Feb 2 09:58:58 2024, TD, TapeServer not writng data to disk - plus fix  7x
DAQ and NewMerger appear to be cofigured correctly.

Can allocate device, create volume and open file with TapeServer but cannot write data.
Entry  Fri Feb 2 08:59:36 2024, JM, TD, CB, Run1 start - pulser widths spreadsheet 20x
Current pulser widths excel spreadsheet attached

09.58 DSSSD bias OK - attachment 1 
Entry  Thu Feb 1 14:45:09 2024, JM, CB, NewMerger setup 
To include alll 16 FEE modules in the NewMerger we edited the file /MIDAS/DB/EXPERIMENTS/MERGE/Options/carme-gsi from MERGE.LinksAvailable string 5 to
MERGE.LinksAvailable string 15

We also edited the file /MIDAS/Linux/startup/NewMerger from ./master64 -i 8 -l 16 -p 11001  & to ./master64 -i 16 -l 16 -p 11001 
Entry  Thu Feb 1 10:04:11 2024, JM, CB, Shaping time testing 31x
Arrived at the control room to find we had lost connection to the power relay. We rebooted the nnrpi1 and re-connected according to the steps laid out
in elog 471 -> all okay

11:00 Restarted daq with no changes to the system from yesterday. Bias consistent with previous days. All pulser peaks are slightly improved
Entry  Wed Jan 31 09:49:38 2024, JM, TD, Optimising - Wednesday 31 25x
Removed ground from DSSD #1 to the chamber and set MACBs so that timestamp is from the NIM WR emulator not the VME VETAR2.

Root MACB mode 0x3 -> 0xd - all other MACB modes 0x3 ( unchanged ).

No timestamps observed from the emulator. Re-set to take timestamps from the VETAR" unit -> all timestamps observed.
Entry  Tue Jan 30 14:04:30 2024, NH, [HowTo] Update MACB Firmware xusbdfwu.rulesxilinx.tar.gzxc2c128.mapmacb_apr20.jed
This is how to update the MACB firmware using the opensource tool xc3sprog

Entry  Tue Jan 30 09:14:50 2024, JM, TD, Tuesday 30 January 32x

09.00 CARME IE514 5.1e-11mbar
Entry  Mon Jan 29 15:32:08 2024, TD, JM, Monday 29 January contd. 16x

Test + and test - daisy chain cabling extended from DSSSD #1 to #2 to DSSSD #1 to DSSSD #4
 terminated by 50 Ohm at end of daisy chain
Entry  Mon Jan 29 08:52:07 2024, TD JM, Monday 29 January 32x

09.50 CARME IE514 5.1e-11 mbar ( ambient temperature 16 deg C )
ELOG V3.1.4-unknown