AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DESPEC, Page 10 of 37  ELOG logo
Entry  Wed Jul 23 15:56:00 2025, CC, MP, NK, Test of AIDA05 with new bias module Screenshot_from_2025-07-23_17-08-56.png
Attachment1: AIDA05.1.8L when AIDA05 connected, biased at 101 V with shielded cables. BB7 is still connected but not biased (same configuration as the
previous elog). The channel of the CAEN power supply #0 is connected to ASIC08 and biased at 100V. The channel of the CAEN power supply #1 is disconnected
but still biased at 100V. AIDA04 (chained to AIDA05) is biased via a shielded cable to an iseg NHQ 246L power supplied, biased at 101 V with 16 uA.
Entry  Wed Jul 23 15:04:26 2025, CC, MP, NK, Test of AIDA05 with BB7 connected to Mesytec but not biased Screenshot_from_2025-07-23_16-16-57.png
Attachment1: AIDA05.1.8L when AIDA05 connected, biased at 100 V with not-shielded cables, after the DEGAS platform has been closed, the 2 tiles of BB7
have been connected to the mesytec preamps. BB7 is not biased. The mesytec preamps have been fully connected and supplied but 6/8 black cables are not
connected on the other side. 4X and 4Y are connected to the 2 FEBEX cards.
Entry  Sun May 9 19:29:23 2021, TD, Sunday 9 May 14x
 
Entry  Sat Jun 8 23:00:52 2024, TD, Sunday 9 June 16x

23.58 8.6.24
Entry  Sun May 8 15:10:45 2022, TD, Sunday 8 May 6x

DSSSD bias and FEE64 power OFF during Ge install
Entry  Sat Mar 6 23:37:22 2021, TD, Sunday 7 March 00.00-08:00 18x

00.30 UNILAC problem - no beam
Entry  Sun Apr 7 18:13:56 2024, TD, Sunday 7 April contd. 6x

19.10 CAEN N1419ET LK fitted
      power cycle
Entry  Sun Apr 7 12:02:23 2024, TD, Sunday 7 April 46x

13.00 Cooling water temperature and flow OK - attachment 1
Entry  Sun Jun 6 14:15:05 2021, TD, Sunday 6 June 9x
14.15 DAQ continues file S496/R32_117
      Hot HEC channels multiple FEE64s from c. 06.00 this morning
      ASIC check fixes
Entry  Sun May 5 10:22:24 2024, TD, Sunday 5 May Capture.PNG

11.22 DSSSD#1 bias -120V leakage current -17.1uA
      DSSSD#2 bias -120V leakage current -10.6uA
Entry  Sun May 30 08:57:53 2021, TD, Sunday 30 May 9x
09.55 DAQ continues - file S496/R18_588
      alpha background
Entry  Sun Mar 3 16:06:11 2024, TD, Sunday 3 March 24x

17.00 FEE64 41:a0:71 ASIC #2 u/s
      Replaced ASIC mezzanine with new ASIC mezzanine
Entry  Sun Apr 3 10:56:11 2022, TD, Sunday 3 April 35x

all system wide checks OK *except* aida10 failed ADC calibration
Entry  Sun Jun 26 08:51:20 2022, OH, NH, Sunday 26 June 08:00-24:00 27x
09:51 Taken over from Tom following the night shift
      Experiment is still running smoothly
      Compression of the files is complete up to the start of R5.
Entry  Sat Jun 25 22:48:57 2022, TD, Sunday 26 June 00:00-08:00 30x
23.43 Check ASIC control
      Zero stats & all histograms
Entry  Sun Apr 25 10:22:16 2021, TD, Sunday 25 April 9x
11.25 All system wide checks OK *except*

 Base  Current  Difference
Entry  Sat May 22 23:40:32 2021, TD, Sunday 23 May Screenshot_2021-05-23_AIDA_Alerting_-_Grafana.pngScreenshot_2021-05-23_Statistics_aidas-gsi.pngScreenshot_2021-05-23_Temperature_and_status_scan_aidas-gsi.png810.pngR16_33

00.40 Unable to connect to FEE64s 1-7
      DAQ power cycled OK
Entry  Sun May 22 14:12:55 2022, TD, Sunday 22 May Screenshot_from_2022-05-22_15-10-25.pngScreenshot_from_2022-05-22_15-10-48.pngScreenshot_from_2022-05-22_15-11-35.png
15.11 DAQ stopped

Attachment 1 - DSSSD bias & leakage current
Entry  Sun Apr 21 00:34:33 2024, TD, Sunday 21 April 37x
01.35 DSSSD bias & leakage current OK - Grafana - attachment 1

      FEE64 temperatures OK - attachment 2
Entry  Sun Jun 2 01:45:05 2024, TD, Sunday 2 June 25x
02.41 DSSSD bias & leakage current - attachment 1

      FEE64 temps OK - attachment 2
ELOG V3.1.3-7933898