| |
ID |
Date |
Author |
Subject |
Text |
 |
|
|
674
|
Mon Dec 9 12:28:01 2024 |
NH, CC, MP | Test of BB7 on AIDA Electronics | BB7 connected to aida07, sitting in a cardboard
box
|
|
|
|
714
|
Wed Jul 23 15:56:00 2025 |
CC, MP, NK | Test of AIDA05 with new bias module | Attachment1: AIDA05.1.8L when AIDA05 connected,
biased at 101 V with shielded cables. BB7
is still connected but not biased (same configuration |
|
|
|
713
|
Wed Jul 23 15:04:26 2025 |
CC, MP, NK | Test of AIDA05 with BB7 connected to Mesytec but not biased | Attachment1: AIDA05.1.8L when AIDA05 connected,
biased at 100 V with not-shielded cables,
after the DEGAS platform has been closed, |
|
|
|
302
|
Sun May 9 19:29:23 2021 |
TD | Sunday 9 May | |
14x |
|
|
643
|
Sat Jun 8 23:00:52 2024 |
TD | Sunday 9 June |
23.58 8.6.24
|
16x |
|
|
424
|
Sun May 8 15:10:45 2022 |
TD | Sunday 8 May |
DSSSD bias and FEE64 power OFF during Ge
install
|
6x |
|
|
176
|
Sat Mar 6 23:37:22 2021 |
TD | Sunday 7 March 00.00-08:00 |
00.30 UNILAC problem - no beam
|
18x |
|
|
563
|
Sun Apr 7 18:13:56 2024 |
TD | Sunday 7 April contd. |
19.10 CAEN N1419ET LK fitted
power cycle
|
6x |
|
|
560
|
Sun Apr 7 12:02:23 2024 |
TD | Sunday 7 April |
13.00 Cooling water temperature and flow
OK - attachment 1
|
46x |
|
|
358
|
Sun Jun 6 14:15:05 2021 |
TD | Sunday 6 June | 14.15 DAQ continues file S496/R32_117
Hot HEC channels multiple FEE64s from
c. 06.00 this morning
|
9x |
|
|
628
|
Sun May 5 10:22:24 2024 |
TD | Sunday 5 May |
11.22 DSSSD#1 bias -120V leakage current
-17.1uA
|
|
|
|
352
|
Sun May 30 08:57:53 2021 |
TD | Sunday 30 May | 09.55 DAQ continues - file S496/R18_588
alpha background
|
9x |
|
|
526
|
Sun Mar 3 16:06:11 2024 |
TD | Sunday 3 March |
17.00 FEE64 41:a0:71 ASIC #2 u/s
Replaced ASIC mezzanine with new ASIC |
24x |
|
|
408
|
Sun Apr 3 10:56:11 2022 |
TD | Sunday 3 April |
all system wide checks OK *except* aida10
failed ADC calibration
|
35x |
|
|
502
|
Sun Jun 26 08:51:20 2022 |
OH, NH | Sunday 26 June 08:00-24:00 | 09:51 Taken over from Tom following the night
shift
Experiment is still running smoothly
|
27x |
|
|
501
|
Sat Jun 25 22:48:57 2022 |
TD | Sunday 26 June 00:00-08:00 | 23.43 Check ASIC control
Zero stats & all histograms
|
30x |
|
|
282
|
Sun Apr 25 10:22:16 2021 |
TD | Sunday 25 April | 11.25 All system wide checks OK *except*
Base Current Difference
|
9x |
|
|
345
|
Sat May 22 23:40:32 2021 |
TD | Sunday 23 May |
00.40 Unable to connect to FEE64s 1-7
DAQ power cycled OK
|
    |
|
|
470
|
Sun May 22 14:12:55 2022 |
TD | Sunday 22 May | 15.11 DAQ stopped
Attachment 1 - DSSSD bias & leakage current
|
  |
|
|
584
|
Sun Apr 21 00:34:33 2024 |
TD | Sunday 21 April | 01.35 DSSSD bias & leakage current OK - Grafana
- attachment 1
|
37x |