AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
DESPEC, Page 10 of 37
New
|
Find
|
Select
|
Import
|
Config
|
Last day
|
Help
New entries since:
Thu Jan 1 01:00:00 1970
Full
| Summary |
Threaded
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
728 Entries
Goto page
Previous
1
,
2
,
3
...
9
, 10,
11
...
35
,
36
,
37
Next
Selected entries:
ID
Date
Author
Subject
Text
714
Wed Jul 23 15:56:00 2025
CC, MP, NK
Test of AIDA05 with new bias module
Attachment1: AIDA05.1.8L when AIDA05 connected,
biased at 101 V with shielded cables. BB7
is still connected but not biased (same configuration
713
Wed Jul 23 15:04:26 2025
CC, MP, NK
Test of AIDA05 with BB7 connected to Mesytec but not biased
Attachment1: AIDA05.1.8L when AIDA05 connected,
biased at 100 V with not-shielded cables,
after the DEGAS platform has been closed,
302
Sun May 9 19:29:23 2021
TD
Sunday 9 May
14x
643
Sat Jun 8 23:00:52 2024
TD
Sunday 9 June
23.58 8.6.24
16x
424
Sun May 8 15:10:45 2022
TD
Sunday 8 May
DSSSD bias and FEE64 power OFF during Ge
install
6x
176
Sat Mar 6 23:37:22 2021
TD
Sunday 7 March 00.00-08:00
00.30 UNILAC problem - no beam
18x
563
Sun Apr 7 18:13:56 2024
TD
Sunday 7 April contd.
19.10 CAEN N1419ET LK fitted
power cycle
6x
560
Sun Apr 7 12:02:23 2024
TD
Sunday 7 April
13.00 Cooling water temperature and flow
OK - attachment 1
46x
358
Sun Jun 6 14:15:05 2021
TD
Sunday 6 June
14.15 DAQ continues file S496/R32_117
Hot HEC channels multiple FEE64s from
c. 06.00 this morning
9x
628
Sun May 5 10:22:24 2024
TD
Sunday 5 May
11.22 DSSSD#1 bias -120V leakage current
-17.1uA
352
Sun May 30 08:57:53 2021
TD
Sunday 30 May
09.55 DAQ continues - file S496/R18_588
alpha background
9x
526
Sun Mar 3 16:06:11 2024
TD
Sunday 3 March
17.00 FEE64 41:a0:71 ASIC #2 u/s
Replaced ASIC mezzanine with new ASIC
24x
408
Sun Apr 3 10:56:11 2022
TD
Sunday 3 April
all system wide checks OK *except* aida10
failed ADC calibration
35x
502
Sun Jun 26 08:51:20 2022
OH, NH
Sunday 26 June 08:00-24:00
09:51 Taken over from Tom following the night
shift
Experiment is still running smoothly
27x
501
Sat Jun 25 22:48:57 2022
TD
Sunday 26 June 00:00-08:00
23.43 Check ASIC control
Zero stats & all histograms
30x
282
Sun Apr 25 10:22:16 2021
TD
Sunday 25 April
11.25 All system wide checks OK *except*
Base Current Difference
9x
345
Sat May 22 23:40:32 2021
TD
Sunday 23 May
00.40 Unable to connect to FEE64s 1-7
DAQ power cycled OK
470
Sun May 22 14:12:55 2022
TD
Sunday 22 May
15.11 DAQ stopped
Attachment 1 - DSSSD bias & leakage current
584
Sun Apr 21 00:34:33 2024
TD
Sunday 21 April
01.35 DSSSD bias & leakage current OK - Grafana
- attachment 1
37x
635
Sun Jun 2 01:45:05 2024
TD
Sunday 2 June
02.41 DSSSD bias & leakage current - attachment
1
25x
Goto page
Previous
1
,
2
,
3
...
9
, 10,
11
...
35
,
36
,
37
Next
ELOG V3.1.3-7933898