AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DESPEC, Page 19 of 37  ELOG logo
Entry  Mon May 6 07:10:26 2024, TD, Monday 6 May Capture.PNG

08.11 DSSSD#1 bias -120V leakage current -17.0uA
      DSSSD#2 bias -120V leakage current -10.5uA
Entry  Mon Jul 5 14:36:15 2021, NH, Monday 5 July 
AIDA Unbiased and powered down
All FEEs were running before stoppage. None had rebooted.
Aida05 did not respond until merger was restarted, all other DAQs responded fine.
Entry  Mon Mar 4 11:35:30 2024, TD, Monday 4 March 11x
12.30 FEE64 41:d7:cd ASIC mezzanine u/s, no data, ASIC temperature c. 20 deg C ( ambient ) low
      Replaced ASIC mezzanine with new ASIC mezzanine
      Installed as aida08
Entry  Mon Apr 4 09:19:49 2022, TD, Monday 4 April 12x
AIDA adaptor PCB config - all LKs removed *except*

aida04 & aida08 LK1
Entry  Mon Jun 3 07:35:56 2024, TD, Monday 3 June 8x
08.28 DSSSD bias & leakage current - attachments 1-2

      FEE64 temps OK - attachment 3
Entry  Mon Apr 29 08:11:16 2024, TD, Monday 29 April 41x

08.52 Beam off
Entry  Mon Jun 27 17:03:09 2022, MA, Monday 27th June 16:00-00:00 6x
16:00 Took over the shift from OH no beam yet.

18:00 Still no beam yet.

Statistics, Temperature, Current are checked and attached 1-3
Entry  Mon Jun 27 06:45:22 2022, OH, Monday 27th June 08:00-16:00 220626_0830_Stats.png220626_0830_Temp.png220626_0831_Bias.pngR5_770_analysis.txt
07:45 Spoke to David and the beam has been gone since about 05:30
      Reason for the loss of beam is a vacuum issue before the FRS
      They are waiting for the experts
Entry  Mon May 27 17:20:49 2024, TD, Monday 27 May 9x
17.50 bPlas cabling, grounds etc connected, power OFF
       CC reports that bPlas power is actually ON
Entry  Mon Apr 26 09:41:21 2021, TD, Monday 26 April 302.pngScreenshot_2021-04-26_Temperature_and_status_scan_aidas-gsi.pngScreenshot_2021-04-26_Statistics_aidas-gsi.pngScreenshot_2021-04-26_NewMerger_Statistics_aidas-gsi.pngScreenshot_2021-04-26_AIDA_Alerting_-_Grafana.png
10.42 All system wide checks OK *except*

 Base  Current  Difference
Entry  Mon May 24 09:57:07 2021, TD, Monday 24 May 19x

07.30 Hot HEC channels multiple FEE64s
      ASIC check fixes
Entry  Mon May 23 16:41:45 2022, TD, Monday 23 May Screenshot_from_2022-05-23_17-39-23.pngScreenshot_from_2022-05-23_17-39-58.pngScreenshot_from_2022-05-23_17-40-33.png
17.40 DAQ stopped

Attachment 1 - DSSSD bias & leakage current
Entry  Mon Dec 23 10:54:46 2024, TD, Monday 23 December 2024 

11.54 re-established remote access via AnyDesk - details to follow
Entry  Mon Apr 12 16:49:40 2021, TD, Monday 22 April - pulser walkthrough & alpha background 6x
16.54 Pulser walkthrough

      ASIC settings 2019Dec19-16.19.51
Entry  Sun Apr 21 23:20:45 2024, TD, Monday 22 April 38x
00.15 Data link to MBS was closed by MBS - reason(s) unknown
      NH restarted MBS receiver and data transfer restarted
Entry  Mon Jun 21 10:21:50 2021, NH, Monday 21 June 8x
11.21 - DAQ continues OK (no storage mode)

11.21 - System checks ok *except*
Entry  Mon Jun 20 09:26:23 2022, OH, TD, Monday 20 June 11x
10:26 MACB HDMI for AIDA03 and AIDA04 reseated.
      Merger and DAQ restarted - All happily sending data
      Has been running for 10 minutes with no WR errors.
Entry  Mon Apr 19 16:58:29 2021, LJW, Monday 19th April 16:00-20:00 Shift 6x
System Checks @ ~18:10 :

Entry  Mon Apr 19 13:27:08 2021, RDP, Monday 19th April 12 noon shift 61.pngScreenshot_2021-04-19_Temperature_and_status_scan_aidas-gsi(2).pngScreenshot_2021-04-19_Statistics_aidas-gsi(2).png

12.30 There appear to be fewer HEC events in aida09 cf. aida11 and upstream DSSSDs
      Decrease aida09 asic #1-4 HEC fast comparator 0x2 -> 0x1
Entry  Mon Apr 19 01:08:40 2021, MA, Monday 19th April 00:00-08:00 8x
03:09   General check

Rates, temptature, voltages are OK attached 1, 2, 3, 4

 
ELOG V3.1.3-7933898