AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DESPEC, Page 19 of 37  ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Subjectdown Text Attachments
  629   Mon May 6 07:10:26 2024 TDMonday 6 May
08.11 DSSSD#1 bias -120V leakage current
-17.0uA
 Capture.PNG 
  374   Mon Jul 5 14:36:15 2021 NHMonday 5 JulyAIDA Unbiased and powered down
All FEEs were running before stoppage. None
had rebooted.
  
  527   Mon Mar 4 11:35:30 2024 TDMonday 4 March12.30 FEE64 41:d7:cd ASIC mezzanine u/s, no
data, ASIC temperature c. 20 deg C ( ambient
) low
 11x 
  409   Mon Apr 4 09:19:49 2022 TDMonday 4 AprilAIDA adaptor PCB config - all LKs removed
*except*
 12x 
  636   Mon Jun 3 07:35:56 2024 TDMonday 3 June08.28 DSSSD bias & leakage current - attachments
1-2
 8x 
  622   Mon Apr 29 08:11:16 2024 TDMonday 29 April
08.52 Beam off
 41x 
  505   Mon Jun 27 17:03:09 2022 MAMonday 27th June 16:00-00:0016:00 Took over the shift from OH no beam
yet.

18:00 Still no beam yet.
 6x 
  504   Mon Jun 27 06:45:22 2022 OHMonday 27th June 08:00-16:0007:45 Spoke to David and the beam has been
gone since about 05:30
      Reason for the loss of beam is a vacuum
 220626_0830_Stats.png220626_0830_Temp.png220626_0831_Bias.pngR5_770_analysis.txt 
  633   Mon May 27 17:20:49 2024 TDMonday 27 May17.50 bPlas cabling, grounds etc connected,
power OFF
       CC reports that bPlas power is actually
 9x 
  283   Mon Apr 26 09:41:21 2021 TDMonday 26 April10.42 All system wide checks OK *except*

 Base  Current  Difference
 302.pngScreenshot_2021-04-26_Temperature_and_status_scan_aidas-gsi.pngScreenshot_2021-04-26_Statistics_aidas-gsi.pngScreenshot_2021-04-26_NewMerger_Statistics_aidas-gsi.pngScreenshot_2021-04-26_AIDA_Alerting_-_Grafana.png 
  346   Mon May 24 09:57:07 2021 TDMonday 24 May
07.30 Hot HEC channels multiple FEE64s
      ASIC check fixes
 19x 
  471   Mon May 23 16:41:45 2022 TDMonday 23 May17.40 DAQ stopped

Attachment 1 - DSSSD bias & leakage current
 Screenshot_from_2022-05-23_17-39-23.pngScreenshot_from_2022-05-23_17-39-58.pngScreenshot_from_2022-05-23_17-40-33.png 
  679   Mon Dec 23 10:54:46 2024 TDMonday 23 December 2024
11.54 re-established remote access via AnyDesk
- details to follow
  
  215   Mon Apr 12 16:49:40 2021 TDMonday 22 April - pulser walkthrough & alpha background16.54 Pulser walkthrough

      ASIC settings 2019Dec19-16.19.51
 6x 
  585   Sun Apr 21 23:20:45 2024 TDMonday 22 April00.15 Data link to MBS was closed by MBS -
reason(s) unknown
      NH restarted MBS receiver and data
 38x 
  372   Mon Jun 21 10:21:50 2021 NHMonday 21 June11.21 - DAQ continues OK (no storage mode)

11.21 - System checks ok *except*
 8x 
  486   Mon Jun 20 09:26:23 2022 OH, TDMonday 20 June10:26 MACB HDMI for AIDA03 and AIDA04 reseated.
      Merger and DAQ restarted - All happily
sending data
 11x 
  248   Mon Apr 19 16:58:29 2021 LJWMonday 19th April 16:00-20:00 ShiftSystem Checks @ ~18:10 :

 6x 
  246   Mon Apr 19 13:27:08 2021 RDPMonday 19th April 12 noon shift
12.30 There appear to be fewer HEC events
in aida09 cf. aida11 and upstream DSSSDs
 61.pngScreenshot_2021-04-19_Temperature_and_status_scan_aidas-gsi(2).pngScreenshot_2021-04-19_Statistics_aidas-gsi(2).png 
  243   Mon Apr 19 01:08:40 2021 MAMonday 19th April 00:00-08:0003:09   General check

Rates, temptature, voltages are
OK attached 1, 2, 3, 4
 8x 
ELOG V3.1.3-7933898