AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DESPEC, Page 24 of 35  ELOG logo
Entry  Tue Apr 20 10:54:41 2021, CB, April 20 12:00 - 16:00 shift 9x
11:55 CA got AIDA back online

12:00 Stats OK (attach 1)
Entry  Tue Apr 20 07:06:20 2021, CA, April 20th 08:00 - 12:00 Screenshot_from_2021-04-20_07-45-09.pngScreenshot_from_2021-04-20_07-45-43.pngScreenshot_from_2021-04-20_07-46-05.pngScreenshot_from_2021-04-20_08-14-58.pngScreenshot_from_2021-04-20_08-15-38.png
08:09 DAQ crashes at start of shift (!)

      again happens at same time as beam being lost
Entry  Mon Apr 19 23:01:02 2021, OH, 20th April 00:00-08:00 17x
23:52 Noticed AIDA07 has dropped out of the merger and is producing no statistics
      Powercycling to recover
Entry  Mon Apr 19 19:19:18 2021, CB, Monday 19 April 20:00-24:00 shift 11x
20:19 
Statistics OK (attach 1)
No faults found
Entry  Mon Apr 19 16:58:29 2021, LJW, Monday 19th April 16:00-20:00 Shift 6x
System Checks @ ~18:10 :

Entry  Mon Apr 19 13:27:08 2021, RDP, Monday 19th April 12 noon shift 61.pngScreenshot_2021-04-19_Temperature_and_status_scan_aidas-gsi(2).pngScreenshot_2021-04-19_Statistics_aidas-gsi(2).png

12.30 There appear to be fewer HEC events in aida09 cf. aida11 and upstream DSSSDs
      Decrease aida09 asic #1-4 HEC fast comparator 0x2 -> 0x1
Entry  Mon Apr 19 06:46:15 2021, MS, Monday 19 April 07:47-12:00 2021 9x
07:47

    
Entry  Mon Apr 19 01:08:40 2021, MA, Monday 19th April 00:00-08:00 8x
03:09   General check

Rates, temptature, voltages are OK attached 1, 2, 3, 4

 
Entry  Sun Apr 18 21:43:01 2021, ML-OH, system wide checks 20x
New System wide check 10pm CET

Clock status test result: Passed 12, Failed 0

Understand status as follows
Entry  Sun Apr 18 19:05:33 2021, ML-OH, All spectra reset 
 All spectra reset at 8pm CET.

 
Entry  Sun Apr 18 17:27:44 2021, ML-OH, system wide checks 17x
system wide checks at 6pm CET

##################################################

Difference noted from previous shift:
Entry  Sun Apr 18 11:18:21 2021, TD, Sunday 18 April 12.00-16.00 25x
12.18 DAQ continues file NULL/R30_490

      ASIC settings 2019Dec19-16.19.51
Entry  Sun Apr 18 07:30:20 2021, DJ, TD, Sunday 18th April 08:00-12:00 7x
---- 09-26
FEE64 module aida06 failed
FEE64 module aida07 failed
Entry  Sun Apr 18 00:57:36 2021, BA, MA, Sanday 18 April 00.00-08.00 12x
02:01 Beam has stopped at 01:37 and returend at 01:43 for few min and then stopped again and not knowen how it will take until it is back

AIDA scalers attached 1

statistic attached 2
Entry  Sat Apr 17 19:39:56 2021, DJ, TD, Saturday 17 April 20.00-00.00 13x

19.37 per FEE64 rate spectra - attachments 1 & 2
      1.8.L spectra - attachments 3 & 4
Entry  Sat Apr 17 15:29:27 2021, MS, Saturday 17 April 16:00-20:00 2021 6x
16:21

Entry  Sat Apr 17 11:27:38 2021, JS, TD, Saturday 17th April 12:00-16:00 10x
 Base  Current  Difference
aida05 fault   0x1a52 :   0x1a53 :   1  
aida06 fault   0x4f3e :   0x4f3f :   1  
Entry  Sat Apr 17 07:28:02 2021, LPG, TD, Saturday 08:00 - 12:00 9x
08:30 CEST

HV and leakage currents: elog:233/1
Entry  Fri Apr 16 23:13:57 2021, CA, MA, BA, Saturday 16th 00:00 - 08:00  14x
00:05 DESPEC tuning beam, changing spill length

00:21 DAQ continues ok
Entry  Fri Apr 16 15:52:08 2021, DSJ , 16 April 16.00 shift 12x
Clock status test result: Passed 12, Failed 0

Understand status as follows
ELOG V3.1.3-7933898