AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DESPEC, Page 26 of 37  ELOG logo
Entry  Thu Nov 6 12:58:09 2025, NH, 207Bi source test - data taking 6x
Restart AIDA

aida06 took three attempts to boot today :(
Entry  Thu May 13 17:05:42 2021, Muneerah, MArc, Thu 13 May 04:00-00:00 130521_1802_Stats.png130521_1802_Temp.png130521_1804_Voltages.png
19:08 System Check

Rates from ucesb below 1 kHz

Atachment 1 Stats
Entry  Wed May 19 09:12:52 2021, Muneerah, Betool, LS, 17th May 00:00-12:00 17x
Auther: Muneerah and Betool
02:00 The dead time have been checked every 30 min from the start of the shift, it seemes Ok
      Statistics ok - 210517_0202_Stats
Entry  Thu May 13 00:51:40 2021, Muneerah and OH, Thu 13 May 00:00-08:00 7x
01:50 Beam on
The leakage current and the voltages been monitered every half an hour and logged in the excel sheet, looks decreasing.
Tempetratures OK
Entry  Thu May 20 01:00:30 2021, Muneerah, Thu May 20 00:00-08:00 13x
02:00 System check

The ucesb has stopped around 00:26, the team in the lab ask us to restart AIDA! Called OH for this but the team in the lab figured out thats
no need to restart AIDA!
Entry  Thu May 20 23:26:11 2021, Marc Labiche (ML), system wide checks 9x
System Wide check at begining of the night shift:

-----

Clock status test result: Passed 16, Failed 0
Entry  Fri Jun 24 15:04:06 2022, Marc, Friday 24th June - evening shift 11x
16:05 - Last checked was at 15:30. (see previous entry. All running smoothly.  

Next wide check will be in about an hour.

17:00
Entry  Sun Jun 26 23:04:30 2022, Marc, new shift - Monday 27 June 0:00 to 8:00 12x
0:00 Experiment continues to run smoothly. AIDA DAQ has been rather stable. Leakage current has gone up for the past two days in both DSSDs (combination
of high-Z and high-intensity beam and external high temperature).

Stats & Temperatures (VIRTEX,PSU, ASICs)  all ok.
Entry  Thu Apr 25 15:02:50 2024, Marc, 16:00 - 0:00 Thursday 25 April 8x

16:20: 
Spill length:4s (was 3.5s before) - Extraction time 1.5s (see attachement #1)
             

16.45
Checks:
      DSSSD bias & leakage current - Grafana - attachments 2
       leakage current ramping, spill micro structure observable

      FEE64
temperatures OK - attachment 3

      ADC data item stats - attachment 5

      per FEE64 Rate spectra - attachment 4

      Merger etc - attachment
Entry  Fri Apr 26 23:04:51 2024, Marc, 00:00-08:00 Saturday 27 April 12x
It's a new day, it's a new shift and I'm feeeeeliiiiing goooood !!!!!


0.15 Checks:
      DSSSD bias & leakage current - Grafana - attachments 1-2
       leakage current dropped a bit since the evening
shift ~22:00.

      FEE64 temperatures OK - attachment 3

      ADC data item stats - attachment 4

      per FEE64 Rate spectra - attachment 5

Entry  Sat Apr 27 23:04:42 2024, Marc, 00:00-08:00 Sunday 28 April 12x
Encore un matin, un matin pour ..... a shift !!!ramping up again ! S4 temperature not really going down either: 25C

0:40 AIDA04 is down. I informed the DAQ shift crew and attempting to restart AIDA04.

After rebooting AIDA04 all seemed going until I reached the merger check. No data was being merged.
Entry  Sun Apr 28 22:52:06 2024, Marc, 0:00-08:00 Monday 29 April  7x
Just another manic magic Monday, ....

Taking over Betool's AIDA shift. All is good.

This shift's first hour has been eventless. Temperatures, Rates, bias, all look good.
Entry  Mon Jun 10 15:07:24 2024, Marc, 16:00-00:00 shift Monday 10/06/24 31x
Evening shift


5pm full checks:
DSSSD bias & leakage current  ok - attachment # 1-2
FEE64 temperatures  ok - attachment # 3
ADC
data item stats - attachment # 4
per FEE64 Rate spectra - attachment # 5
Merger ok - Attachement # 6
Tape service - attachement # 7



7pm
Entry  Wed Jun 12 23:00:16 2024, Marc, 00:00-08:00 Thursday 13 June 23x
Starting a new night shift - All good

1am full check:
DSSSD bias & leakage current  ok - attachment # 1-2
Entry  Sun Apr 28 06:57:59 2024, Magda Satrazani, 08:00-16:00 Sunday 28 April 36x
Took over the shift from Marc.

 

 
Entry  Thu Jun 13 06:49:54 2024, Magda Satrazani, 08:00 - 16:00 Thursday 13 June 2024 40x
Took over the shift from Marc.

08:00 FULL CHECK
Entry  Sat May 14 06:57:21 2022, MS, OH, Saturday 14 May 
08:00 Took over the shift from Philippos
      In system wide checks aida09 fails ASIC clock check but it is bit 6 which is ok
Entry  Sat May 14 09:00:21 2022, MS, OH, Saturday 14 May Screenshot_2022-05-14_at_10-01-07_Statistics_aidas-gsi.pngScreenshot_2022-05-14_at_10-01-50_Temperature_and_status_scan_aidas-gsi.pngScreenshot_from_2022-05-14_10-02-51.png
10:00
Entry  Sat May 14 10:59:52 2022, MS, OH, Saturday 14 May Screenshot_2022-05-14_at_12-00-16_Statistics_aidas-gsi.pngScreenshot_2022-05-14_at_12-00-44_Temperature_and_status_scan_aidas-gsi.pngScreenshot_from_2022-05-14_12-01-54.png
12:00
Entry  Sat May 14 13:01:58 2022, MS, OH, Saturday 14 May Screenshot_2022-05-14_at_14-02-31_Statistics_aidas-gsi.pngScreenshot_2022-05-14_at_14-02-52_Temperature_and_status_scan_aidas-gsi.pngScreenshot_from_2022-05-14_14-03-54.png
14:00
ELOG V3.1.3-7933898