AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DESPEC, Page 27 of 34  ELOG logo
Entry  Wed Mar 3 15:02:19 2021, CA, MBS command line startup 
/MIDAS/Linux/startup/datarelaymbs 
Entry  Mon Feb 22 18:18:47 2021, NH, AIDA Rates/Situation  8x
The ground cable (LEMO00) in aida07 was disconnected, it has been reinserted and the waveforms now look good.

(All data below taken with thresholds 0xA for all)
    Reply  Sat Feb 27 12:47:57 2021, NH, AIDA Rates/Situation  10x
Updated figures as of 27 Feb 2021 - S4 is now closed for experiments but may open on Wednesday.
Snout has been grounded and all FEEs are seemingly grounded properly.
Entry  Fri Feb 12 17:31:04 2021, NH, Background run 
A background run has been started to check the AIDA channels.
It is in /TapeData/BGFEB21
Entry  Mon Feb 1 15:19:07 2021, NH, AIDA Status Feb 2021 
01.02.2021 - Four new sets of PSU, HDMI & Ethernet cables were ran from the DESPEC rack to the AIDA frame, in preparation for 4 new FEE64s.
A new 7 port USB hub has also been placed for the last few serial connections.
    Reply  Sat Feb 6 10:45:55 2021, NH, AIDA Status Feb 2021 pregrd050222_E.pngpregrd050221_O.pngpostgrd050221_O.pngpostgrd050221_E.png
> 01.02.2021 - Four new sets of PSU, HDMI & Ethernet cables were ran from the DESPEC rack to the AIDA frame, in preparation for 4 new FEE64s.
> A new 7 port USB hub has also been placed for the last few serial connections.
Entry  Tue Nov 24 13:10:42 2020, NH, Waveforms with frame grounded waves_odd.pngwaves_even.png20201124_164416.jpg20201124_164413.jpg
AIDA Frame is now grounded to platform (will add photo later)

Waveforms improved from April (c.f. https://elog.ph.ed.ac.uk/DESPEC/125) but comparison not truly fair (other systems may be offline now)
Entry  Tue Oct 6 15:48:06 2020, NH, nnrpi kernel update 
FYI:

The SD card on nnrpi2 was full again causing issues, the log files in /var/log (kern.log & messages) were *huge* and filled with the same error many times
Entry  Tue Jul 7 08:50:27 2020, NH, nnrpi2 does not boot 
MIDAS was not working properly on nnrpi2 - power cycled. Now system does not boot properly, it gets stuck trying to login claiming "PAM critical error"
- probable file system corruption?
Will investigate if SD card can be checked and repaired
Entry  Tue Jul 7 08:04:57 2020, NH, Power failure in Messhuette 
Last week there was a power failure in Messhuette (FRS control room) - AIDA-3 and MBS were affected.
AIDA itself and S4 equipment is on UPS and was not shut down.
Entry  Wed Mar 18 18:02:37 2020, PJCS, New Firmware loaded in all FEE64s 
Loaded new frimware into all 12 FEE64s in the system. IWR_Dec19_4.bin 

Booted ok after power-cycle.  

RESET/SETUP/GO all fine.
Entry  Mon Mar 16 07:25:24 2020, NH, End of Experiment 
08:25 Beam Stopped, end of S480

Tape Server stopped at R12_2097

Started again in no storage mode
Entry  Mon Mar 16 05:08:12 2020, TA, AM, ES, Regular entry 6x

02:14 all system wide checks okay 
      FEE temperatures okay 
      leakage currents okay and recorded to spreadsheet 
      good event stats
okay 
      merger running at around 3M items/sec
      tape service running at 26MB/sec

 

All attached to this entry with screenshots to 1-7
Entry  Mon Mar 16 01:07:29 2020, TA, AM, ES, Regular entry 13x

02:14 all system wide checks okay 
      FEE temperatures okay 
      leakage currents okay and recorded to spreadsheet 
      good event stats
okay 
      merger running at 3M items/sec
      tape service running at 26MB/sec

 

All attached to this entry with screenshots to 1-7
Entry  Sun Mar 15 06:45:00 2020, CA, LS, CG, Sunday 15th March 08:00 - 24:00 35x
ASIC settings 2019Oct31-13.24.23
     slow comparator 0xa
Entry  Sat Mar 14 23:09:28 2020, MB, SJ, MR, Sunday 15th March 0:00-8:00 16x
AIDA ELog filled out by DESPEC night shift members Matthew Brunet (MB), Shaheen Jazrawi (SJ), and Matthias Rudiger (MR).

0:05-0:08 Beam operators altering settings, beam off/sporadic during this period.
Entry  Sat Mar 14 07:13:59 2020, DK, TD, LS, CG, Saturday 14th March 08:00 - 24:00 41x
8:15
    All system wide checks passed
    Leak currents are continuing to creep up - attachment #1
Entry  Fri Mar 13 23:06:39 2020, CA, OH, Saturday 14th March 00:00 - 08:00 19x
ASIC settings 2019Oct31-13.24.23
     slow comparator 0xa
Entry  Fri Mar 13 15:48:11 2020, Friday 13th 16:00 - 24:00, OH, TD 11x
ASIC settings 2019Oct31-13.24.23
     slow comparator 0xa
Entry  Fri Mar 13 08:01:53 2020, DK, Friday 13th 8:00 to 16:00 shift 8x
8:00 - See previous shift's elog entry.  All good.

9:00
Entry  Thu Mar 12 23:44:48 2020, DK, PID Plots pid.pngpid.pngpid.pdf
Labelled PID plots.  Note that the A/Q calibration is shifted by +0.02 units, and Z calibration is offset by about +5.

There was an error in the printouts for Cd isotopes, but the below attachments are corrected.
Entry  Thu Mar 12 23:04:24 2020, LS, DK, Friday 13th 00:00 to 08:00 shift 20x
   Shift file starting R9_639

   system wide checks okay
ELOG V3.1.4-unknown