AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DESPEC, Page 28 of 36  ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Authordown Subject Text Attachments
  445   Sat May 14 01:52:03 2022 ML2h-Shift ChecksAIDA stats ok

Leakage current ok

Temperatires ok
 Stats_Screenshot_from_2022-05-14_02-48-14.pngTemp_Screenshot_from_2022-05-14_02-47-31.pngHV_LC_Screenshot_from_2022-05-14_02-46-42.pngucesb_rates_Screenshot_from_2022-05-14_02-50-36.pngGrafana_Screenshot_from_2022-05-14_03-50-00.png 
  457   Sun May 15 15:51:49 2022 MLSunday 15th May 16:00-0:00Status at 16:45 (CET)

The expreiment continues to run
smoothly.
 12x 
  152   Sat Mar 14 23:09:28 2020 MB, SJ, MRSunday 15th March 0:00-8:00AIDA ELog filled out by DESPEC night shift
members Matthew Brunet (MB), Shaheen Jazrawi
(SJ), and Matthias Rudiger (MR).
 16x 
  266   Fri Apr 23 13:13:46 2021 MA, TDFriday 23 April 12.00-16.00
14.15 System wide checks
 6x 
  528   Tue Mar 5 09:10:01 2024 MA, JB, TDTuesday 5 March
Old ribbon cable assemblies - attachments
1  2
 20240305_101140.jpg20240305_101146.jpg20240305_165949.jpg 
  306   Wed May 12 02:07:59 2021 MA, BAWed 12 May 00:00-08:0003:12 System Check

attachment 1 : Current

attachment 2 : Temperature
 9x 
  243   Mon Apr 19 01:08:40 2021 MAMonday 19th April 00:00-08:0003:09   General check

Rates, temptature, voltages are
OK attached 1, 2, 3, 4
 8x 
  491   Wed Jun 22 15:09:37 2022 MAWednesday 22 June 16:00-00:0016:00 Take over from Magda mrning shift

Beam was off of sometime for tunning
to Mercurey setting.
 12x 
  505   Mon Jun 27 17:03:09 2022 MAMonday 27th June 16:00-00:0016:00 Took over the shift from OH no beam
yet.

18:00 Still no beam yet.
 6x 
  146   Thu Mar 12 23:04:24 2020 LS, DKFriday 13th 00:00 to 08:00 shift   Shift file starting R9_639

   system wide checks okay
 20x 
  136   Mon Mar 9 13:50:08 2020 LS, CA, DK09/03/2020 system checks14:52 Attachment 1 shows low energy spectra.
AIDA06 shows strange baseline, possible double-hit?
 13x 
  192   Fri Mar 12 10:09:19 2021 LS, CAFriday 12th March 11.00-11.00(Germany) System wide checks okay except:

      FEE64 module aida09 global clocks failed,
 17x 
  321   Mon May 17 19:05:23 2021 LSMonday 17th May 20.00-24.0020.30
Checked stats, seem okay (Fig 1)
Ran R14_99 through analyser, dead times all
 21x 
  325   Tue May 18 18:47:25 2021 LSTuesday 18th May 20:00 - 24:00
19.50
Stats okay (Fig 1)
 24x 
  333   Wed May 19 18:50:01 2021 LSWednesday 19th May 20:00 to 24:0020.00
Stats okay (Fig 1)
Analysed R14_762 deadtimes are okay (Fig
 21x 
  233   Sat Apr 17 07:28:02 2021 LPG, TDSaturday 08:00 - 12:0008:30 CEST

HV and leakage currents: elog:233/1
 9x 
  253   Tue Apr 20 14:56:38 2021 LPGTuesday 20th 16:00-20:0016:00

New shift, ready to go! Beam stopped just
 15x 
  260   Thu Apr 22 07:06:37 2021 LPGThursday 22nd April: 08:00-12:0008:01 - Taking over from Corrigan...

ucesb ok!
 8x 
  258   Wed Apr 21 15:01:14 2021 LJW, MAWednesday 21st April 16:00-20:0016:30

All System checks okay, except for:
 13x 
  248   Mon Apr 19 16:58:29 2021 LJWMonday 19th April 16:00-20:00 ShiftSystem Checks @ ~18:10 :

 6x 
ELOG V3.1.4-unknown