AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DESPEC, Page 7 of 36  ELOG logo
Entry  Tue May 17 06:58:51 2022, OH, Tuesday 17th May 6x
08:00 Still have beam for the time being.
      Currently on file R4_2049
Entry  Tue May 17 16:53:20 2022, TD, Tuesday 17 May 16.00-00.00 24x

17.35 zero all histograms
      zero statistics
Entry  Tue Mar 16 09:26:47 2021, TD, Tuesday 16 March 6x
10.25 DAQ continues OK - no storage

      ASIC settings 2019Dec19-16.19.51
Entry  Tue Apr 16 10:49:37 2024, TD, JB, CC, Tuesday 16 April 24x
11.45 DSSSD bias & leakage current OK - attachments 9-10

      FEE64 temps OK - attachment 8
Entry  Tue Jun 15 12:35:48 2021, TD, Tuesday 15 June 8x
13.35 DAQ continues OK - no storage mode

      All system wide checks OK *except*
Entry  Tue Apr 13 16:49:41 2021, TD, Tuesday 13 April 8x

Rename Options directory
    Reply  Wed Apr 14 09:55:12 2021, TD, Tuesday 13 April 

Two further comments
Entry  Tue May 11 07:21:24 2021, OH, Tuesday 11 May 210511_0823_Stats.png210511_0824_Temp.png210511_0825_Bias.png
08:20 System wide checks all ok except
 Base  Current  Difference
aida01 fault   0xc10c :   0xc10e :   2  
Entry  Tue May 10 07:41:28 2022, NH TD, Tuesday 10 May 29x
8:15am S4 CONTROLLED ACCESS to remove beam plug and check bPlas/AIDA response to beam

Reseat aida05 ribbon cable on adapter board while in...
Entry  Tue Mar 10 08:48:07 2020, TD, OH, NH, LS, CA, DK, PJW, RP, Tuesday 10 March 08.00-16.00 41x

c 09.00 aida03 drops Histogram enable at DAQ GO
        NH determined this was due to Options DB corruption and fixed
Entry  Tue Jun 4 15:40:32 2024, NH, Tues 4 Jun  Screenshot_from_2024-06-04_16-39-28.pngScreenshot_from_2024-06-04_16-39-47.png
DEGAS Array over Snout again

Situation similar to yesterday, most p+n rates good
Entry  Tue Jun 28 09:37:19 2022, NH, Tues 28 June 08:00- 
Experiment over

10:37 - Stop DAQ & Tape 
Entry  Tue Mar 26 10:32:05 2024, NH, JB, Tue 26 March 9x
Taken 4 FEE64s from CRYRING (the 4 easiest to access)
  41:d8:2b
  41:f6:5a
Entry  Tue May 24 08:35:00 2022, NH, Tue 24 May 
09:00 - Remove bias of DSSDs  and pwoer of FEEs

Remove snout from S4 so DEGAS frame can be mechnically removed
Entry  Mon Oct 18 14:20:32 2021, OH, Top bar launchers 
launcher1
TclHttpd @8015 for AIDA
/MIDAS/Linux/startup/HTTPD
Entry  Mon Mar 11 15:19:44 2024, JB, NH, Priyanka, Michael Armstrong, Helena Albers, To Do: AIDA PCB tests 
To do:

1) Disconnect ribbon cables from p+n junction FEE64 adaptor PCBs of upstream DSSSD, apply c. 100V bias and check leakage current is zero
i.e. eliminate shorts in PCBs
Entry  Tue Jul 5 08:53:20 2022, TD, To Do 

In no particular order
Entry  Thu Jan 9 15:43:17 2025, JB, CC, MP, Timing test platform moved in Screenshot_from_2025-01-09_16-41-48.pngScreenshot_from_2025-01-09_16-42-06.pngScreenshot_from_2025-01-09_16-42-46.png
16:30 We moved the platform in. The system was still biased and the DAQ was still running.

The system seems to be okay, temperatures OK. Bias voltage OK 685/1 and 685/2. Two FEEs - aida07 and aida12 are receiving a lot of trigger data
items from the fast discriminator. This is already a bit worrying. 685/3
Entry  Thu Dec 19 09:22:52 2019, TD, Thusrday 19 December 21x
10.15 Found DAQ running at c. 1M data items/s 

      Rate spectra show aida09 1.*.H and one 1x LEC channel of aida08 asic running hot
Entry  Thu Mar 11 00:38:33 2021, TD, Thusrday 11 March 00.00-08.00 11x
01.38 DAQ continues OK - file R22_388

      ASIC settings 2019Dec19-16.19.51
ELOG V3.1.4-unknown