AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DESPEC, Page 7 of 35  ELOG logo
  ID Date Author Subjectdown Text Attachments
  464   Tue May 17 06:58:51 2022 OHTuesday 17th May08:00 Still have beam for the time being.
      Currently on file R4_2049
 6x 
  465   Tue May 17 16:53:20 2022 TDTuesday 17 May 16.00-00.00
17.35 zero all histograms
      zero statistics
 24x 
  202   Tue Mar 16 09:26:47 2021 TDTuesday 16 March10.25 DAQ continues OK - no storage

      ASIC settings 2019Dec19-16.19.51
 6x 
  575   Tue Apr 16 10:49:37 2024 TD, JB, CCTuesday 16 April11.45 DSSSD bias & leakage current OK - attachments
9-10
 24x 
  369   Tue Jun 15 12:35:48 2021 TDTuesday 15 June13.35 DAQ continues OK - no storage mode

      All system wide checks OK *except*
 8x 
  218   Tue Apr 13 16:49:41 2021 TDTuesday 13 April
Rename Options directory
 8x 
  219   Wed Apr 14 09:55:12 2021 TDTuesday 13 April
Two further comments
  
  305   Tue May 11 07:21:24 2021 OHTuesday 11 May08:20 System wide checks all ok except
 Base  Current  Difference
aida01 fault   0xc10c :   0xc10e :   2  
 210511_0823_Stats.png210511_0824_Temp.png210511_0825_Bias.png 
  427   Tue May 10 07:41:28 2022 NH TDTuesday 10 May8:15am S4 CONTROLLED ACCESS to remove beam
plug and check bPlas/AIDA response to beam
 29x 
  137   Tue Mar 10 08:48:07 2020 TD, OH, NH, LS, CA, DK, PJW, RPTuesday 10 March 08.00-16.00
c 09.00 aida03 drops Histogram enable at
DAQ GO
 41x 
  638   Tue Jun 4 15:40:32 2024 NHTues 4 Jun DEGAS Array over Snout again

Situation similar to yesterday, most p+n
 Screenshot_from_2024-06-04_16-39-28.pngScreenshot_from_2024-06-04_16-39-47.png 
  507   Tue Jun 28 09:37:19 2022 NHTues 28 June 08:00-Experiment over

10:37 - Stop DAQ & Tape 
  
  550   Tue Mar 26 10:32:05 2024 NH, JBTue 26 MarchTaken 4 FEE64s from CRYRING (the 4 easiest
to access)
  41:d8:2b
 9x 
  472   Tue May 24 08:35:00 2022 NHTue 24 May09:00 - Remove bias of DSSDs  and pwoer of
FEEs
  
  383   Mon Oct 18 14:20:32 2021 OHTop bar launcherslauncher1
TclHttpd @8015 for AIDA
/MIDAS/Linux/startup/HTTPD
  
  533   Mon Mar 11 15:19:44 2024 JB, NH, Priyanka, Michael Armstrong, Helena AlbersTo Do: AIDA PCB testsTo do:

1) Disconnect ribbon cables
from p+n junction FEE64 adaptor PCBs of upstream
  
  510   Tue Jul 5 08:53:20 2022 TDTo Do
In no particular order
  
  685   Thu Jan 9 15:43:17 2025 JB, CC, MPTiming test platform moved in16:30 We moved the platform in. The system
was still biased and the DAQ was still running.

The system seems to be okay, temperatures
 Screenshot_from_2025-01-09_16-41-48.pngScreenshot_from_2025-01-09_16-42-06.pngScreenshot_from_2025-01-09_16-42-46.png 
  110   Thu Dec 19 09:22:52 2019 TDThusrday 19 December10.15 Found DAQ running at c. 1M data items/s

 21x 
  188   Thu Mar 11 00:38:33 2021 TDThusrday 11 March 00.00-08.0001.38 DAQ continues OK - file R22_388

      ASIC settings 2019Dec19-16.19.51
 11x 
ELOG V3.1.4-unknown