AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DESPEC, Page 20 of 37  ELOG logo
Entry  Mon Apr 19 19:19:18 2021, CB, Monday 19 April 20:00-24:00 shift 11x
20:19 
Statistics OK (attach 1)
No faults found
Entry  Wed May 19 11:24:55 2021, RDP, Monday 19 April 12 noon shift Screenshot_2021-04-19_Temperature_and_status_scan_aidas-gsi(3).pngScreenshot_2021-04-19_Tape_Service_(Expert)_aidas-gsi.png62.png
System checks gave 11 passed/1 failed, except for ADC timimgs: 10 passed/2 failed.

FEE64 module aida09 global clocks failed, 6
Entry  Mon Apr 19 06:46:15 2021, MS, Monday 19 April 07:47-12:00 2021 9x
07:47

    
Entry  Mon May 17 15:14:35 2021, LJW, Monday 17th May 2021 16:00-20:00 9x
16:25

Informed at shift handover that there has been no beam.

Statistics  - See attachment 1
Entry  Mon May 17 19:05:23 2021, LS, Monday 17th May 20.00-24.00 21x
20.30
Checked stats, seem okay (Fig 1)
Ran R14_99 through analyser, dead times all good (Fig 2)
Entry  Mon Jun 17 02:13:21 2024, TD, Monday 17 June 43x
03.11 DSSSD bias & leakage current OK - attachment 1

      FEE64 temperatures OK - attachment 2
Entry  Mon May 16 15:12:50 2022, RDP, MA, Monday 16th May 16:00-00:00 12x
16:00 Took over the shift from Magda.

17:30 Updates: Attached (1-3)

19:30 Updates: Attached (4-6)
Entry  Mon May 16 07:03:16 2022, MS, OH, Monday 16th May 08:00-16:00 17x
08:00 Took over the night shift from Tom (Attachments 1-3)

10:00: Attachement 4-6

around 10:30: Beam went off (Attachment 7)
Entry  Sun May 15 23:00:08 2022, & TD, Monday 16 May 00:00-08:00 25x

00.01 DAQ continues
      file S450/R4_1319
Entry  Mon Mar 15 11:47:51 2021, TD, Monday 15 March 8x
12.48 DAQ continues OK - no storage

      ASIC settings 2019Dec19-16.19.51
Entry  Tue Jun 15 12:33:46 2021, TD, Monday 14 June 
 
Entry  Mon May 10 08:49:37 2021, TD, Monday 10 May 21x
09.51 All system wide checks OK *except*

Entry  Tue Mar 11 11:53:18 2025, TD, Monday 10 March 11x

18.30 AIDA powered up for brief test
Entry  Mon Jun 13 16:38:37 2022, NH, Mon 13 Jun 
Remove Caen HV Supply

Open up, C23 was grounded (HV grounded in NIM)
Entry  Tue Jun 11 18:45:37 2024, PP, Mid-shift checks, 19:45 8x
All looks good.

Sceenshots attached.
Entry  Wed Jun 12 11:06:55 2024, PP, Mid-shift checks, 12:00 8x
All seems normal.

Screenshots attached.
Entry  Wed Jun 2 14:53:05 2021, OH, TD, Merger/Tapeserver issues after reboot of aida-3 6x
On 01/06/21 aida-3 was rebooted as the graphical user interface had frozen.
We were also unable to connected to MIDAS via ssh port forwarding.
Entry  Mon Mar 25 14:44:33 2019, NH, Merger issues Temps.pngAIDARUNv2.pngMergerv2.pngTapev2.pngMergerConsolev2.png
Plastic electronics have now been installed.

Water is not leaking still.

FEE64s powered on at 15:00 to test MBS connection (fig1: temperatures)
Entry  Wed Apr 3 13:02:19 2024, NH, Merger for 16 FEEs Screenshot_from_2024-04-03_14-15-02.pngScreenshot_from_2024-04-03_14-15-25.pngScreenshot_from_2024-04-03_14-15-36.pngScreenshot_from_2024-04-03_14-15-45.pngScreenshot_from_2024-04-03_14-15-52.png
Changed /MIDAS/Linux/startup/NewMerger

Change parameters -i and -l in master64 to 16 for 16 FEEs
Entry  Thu Oct 31 16:43:03 2019, NH CA TD, Merger & MBS Performance MergerStats.pngMBSRates.pngMergernetworking.pngMergerStatistics.png
Testing merger with 3 DSSDs connected, with thresholds of 10 (slow comparator), 2 (HEC) and 255 (fast discriminator)

Merger handling rate of 1.6 million events per second comfortably. Forwarding to MBS fine.
ELOG V3.1.3-7933898