Mon Apr 19 19:19:18 2021, CB, Monday 19 April 20:00-24:00 shift 11x
|
20:19
Statistics OK (attach 1)
No faults found
|
Wed May 19 11:24:55 2021, RDP, Monday 19 April 12 noon shift  
|
System checks gave 11 passed/1 failed, except for ADC timimgs: 10 passed/2 failed.
FEE64 module aida09 global clocks failed, 6
|
Mon Apr 19 06:46:15 2021, MS, Monday 19 April 07:47-12:00 2021 9x
|
07:47
|
Mon May 17 15:14:35 2021, LJW, Monday 17th May 2021 16:00-20:00 9x
|
16:25
Informed at shift handover that there has been no beam.
Statistics - See attachment 1 |
Mon May 17 19:05:23 2021, LS, Monday 17th May 20.00-24.00 21x
|
20.30
Checked stats, seem okay (Fig 1)
Ran R14_99 through analyser, dead times all good (Fig 2)
|
Mon Jun 17 02:13:21 2024, TD, Monday 17 June 43x
|
03.11 DSSSD bias & leakage current OK - attachment 1
FEE64 temperatures OK - attachment 2
|
Mon May 16 15:12:50 2022, RDP, MA, Monday 16th May 16:00-00:00 12x
|
16:00 Took over the shift from Magda.
17:30 Updates: Attached (1-3)
19:30 Updates: Attached (4-6) |
Mon May 16 07:03:16 2022, MS, OH, Monday 16th May 08:00-16:00 17x
|
08:00 Took over the night shift from Tom (Attachments 1-3)
10:00: Attachement 4-6
around 10:30: Beam went off (Attachment 7) |
Sun May 15 23:00:08 2022, & TD, Monday 16 May 00:00-08:00 25x
|
00.01 DAQ continues
file S450/R4_1319
|
Mon Mar 15 11:47:51 2021, TD, Monday 15 March 8x
|
12.48 DAQ continues OK - no storage
ASIC settings 2019Dec19-16.19.51
|
Tue Jun 15 12:33:46 2021, TD, Monday 14 June
|
| |
Mon May 10 08:49:37 2021, TD, Monday 10 May 21x
|
09.51 All system wide checks OK *except*
|
Tue Mar 11 11:53:18 2025, TD, Monday 10 March 11x
|
18.30 AIDA powered up for brief test
|
Mon Jun 13 16:38:37 2022, NH, Mon 13 Jun
|
Remove Caen HV Supply
Open up, C23 was grounded (HV grounded in NIM)
|
Tue Jun 11 18:45:37 2024, PP, Mid-shift checks, 19:45 8x
|
All looks good.
Sceenshots attached. |
Wed Jun 12 11:06:55 2024, PP, Mid-shift checks, 12:00 8x
|
All seems normal.
Screenshots attached. |
Wed Jun 2 14:53:05 2021, OH, TD, Merger/Tapeserver issues after reboot of aida-3 6x
|
On 01/06/21 aida-3 was rebooted as the graphical user interface had frozen.
We were also unable to connected to MIDAS via ssh port forwarding.
|
Mon Mar 25 14:44:33 2019, NH, Merger issues    
|
Plastic electronics have now been installed.
Water is not leaking still.
FEE64s powered on at 15:00 to test MBS connection (fig1: temperatures) |
Wed Apr 3 13:02:19 2024, NH, Merger for 16 FEEs    
|
Changed /MIDAS/Linux/startup/NewMerger
Change parameters -i and -l in master64 to 16 for 16 FEEs
|
Thu Oct 31 16:43:03 2019, NH CA TD, Merger & MBS Performance   
|
Testing merger with 3 DSSDs connected, with thresholds of 10 (slow comparator), 2 (HEC) and 255 (fast discriminator)
Merger handling rate of 1.6 million events per second comfortably. Forwarding to MBS fine.
|