| ID |
Date |
Author |
Subject |
Text |
 |
|
249
|
Mon Apr 19 19:19:18 2021 |
CB | Monday 19 April 20:00-24:00 shift | 20:19
Statistics OK (attach 1)
No faults found
|
11x |
|
331
|
Wed May 19 11:24:55 2021 |
RDP | Monday 19 April 12 noon shift | System checks gave 11 passed/1 failed, except
for ADC timimgs: 10 passed/2 failed.
|
  |
|
244
|
Mon Apr 19 06:46:15 2021 |
MS | Monday 19 April 07:47-12:00 2021 | 07:47
|
9x |
|
320
|
Mon May 17 15:14:35 2021 |
LJW | Monday 17th May 2021 16:00-20:00 | 16:25
Informed at shift handover that
there has been no beam. |
9x |
|
321
|
Mon May 17 19:05:23 2021 |
LS | Monday 17th May 20.00-24.00 | 20.30
Checked stats, seem okay (Fig 1)
Ran R14_99 through analyser, dead times all |
21x |
|
666
|
Mon Jun 17 02:13:21 2024 |
TD | Monday 17 June | 03.11 DSSSD bias & leakage current OK - attachment
1
|
43x |
|
461
|
Mon May 16 15:12:50 2022 |
RDP, MA | Monday 16th May 16:00-00:00 | 16:00 Took over the shift from Magda.
17:30 Updates: Attached (1-3)
19:30 Updates: Attached (4-6) |
12x |
|
459
|
Mon May 16 07:03:16 2022 |
MS, OH | Monday 16th May 08:00-16:00 | 08:00 Took over the night shift from Tom
(Attachments 1-3)
10:00: Attachement 4-6 |
17x |
|
458
|
Sun May 15 23:00:08 2022 |
& TD | Monday 16 May 00:00-08:00 |
00.01 DAQ continues
file S450/R4_1319
|
25x |
|
201
|
Mon Mar 15 11:47:51 2021 |
TD | Monday 15 March | 12.48 DAQ continues OK - no storage
ASIC settings 2019Dec19-16.19.51
|
8x |
|
368
|
Tue Jun 15 12:33:46 2021 |
TD | Monday 14 June | |
|
|
303
|
Mon May 10 08:49:37 2021 |
TD | Monday 10 May | 09.51 All system wide checks OK *except*
|
21x |
|
701
|
Tue Mar 11 11:53:18 2025 |
TD | Monday 10 March |
18.30 AIDA powered up for brief test
|
11x |
|
480
|
Mon Jun 13 16:38:37 2022 |
NH | Mon 13 Jun | Remove Caen HV Supply
Open up, C23 was grounded (HV grounded in |
|
|
652
|
Tue Jun 11 18:45:37 2024 |
PP | Mid-shift checks, 19:45 | All looks good.
Sceenshots attached. |
8x |
|
656
|
Wed Jun 12 11:06:55 2024 |
PP | Mid-shift checks, 12:00 | All seems normal.
Screenshots attached. |
8x |
|
353
|
Wed Jun 2 14:53:05 2021 |
OH, TD | Merger/Tapeserver issues after reboot of aida-3 | On 01/06/21 aida-3 was rebooted as the graphical
user interface had frozen.
We were also unable to connected to MIDAS |
6x |
|
35
|
Mon Mar 25 14:44:33 2019 |
NH | Merger issues | Plastic electronics have now been installed.
Water is not leaking still.
FEE64s powered on at 15:00 to test |
    |
|
559
|
Wed Apr 3 13:02:19 2024 |
NH | Merger for 16 FEEs | Changed /MIDAS/Linux/startup/NewMerger
Change parameters -i and -l in master64 to |
    |
|
76
|
Thu Oct 31 16:43:03 2019 |
NH CA TD | Merger & MBS Performance | Testing merger with 3 DSSDs connected, with
thresholds of 10 (slow comparator), 2 (HEC)
and 255 (fast discriminator)
|
   |