  249   Mon Apr 19 19:19:18 2021 CBMonday 19 April 20:00-24:00 shift20:19 
Statistics OK (attach 1)
No faults found
 11x 
  331   Wed May 19 11:24:55 2021 RDPMonday 19 April 12 noon shiftSystem checks gave 11 passed/1 failed, except
for ADC timimgs: 10 passed/2 failed.
 Screenshot_2021-04-19_Temperature_and_status_scan_aidas-gsi(3).pngScreenshot_2021-04-19_Tape_Service_(Expert)_aidas-gsi.png62.png 
  244   Mon Apr 19 06:46:15 2021 MSMonday 19 April 07:47-12:00 202107:47

    
 9x 
  320   Mon May 17 15:14:35 2021 LJWMonday 17th May 2021 16:00-20:0016:25

Informed at shift handover that
there has been no beam.
 9x 
  321   Mon May 17 19:05:23 2021 LSMonday 17th May 20.00-24.0020.30
Checked stats, seem okay (Fig 1)
Ran R14_99 through analyser, dead times all
 21x 
  666   Mon Jun 17 02:13:21 2024 TDMonday 17 June03.11 DSSSD bias & leakage current OK - attachment
1
 43x 
  461   Mon May 16 15:12:50 2022 RDP, MAMonday 16th May 16:00-00:0016:00 Took over the shift from Magda.

17:30 Updates: Attached (1-3)

19:30 Updates: Attached (4-6)
 12x 
  459   Mon May 16 07:03:16 2022 MS, OHMonday 16th May 08:00-16:0008:00 Took over the night shift from Tom
(Attachments 1-3)

10:00: Attachement 4-6
 17x 
  458   Sun May 15 23:00:08 2022 & TDMonday 16 May 00:00-08:00
00.01 DAQ continues
      file S450/R4_1319
 25x 
  201   Mon Mar 15 11:47:51 2021 TDMonday 15 March12.48 DAQ continues OK - no storage

      ASIC settings 2019Dec19-16.19.51
 8x 
  368   Tue Jun 15 12:33:46 2021 TDMonday 14 June    
  303   Mon May 10 08:49:37 2021 TDMonday 10 May09.51 All system wide checks OK *except*

 21x 
  701   Tue Mar 11 11:53:18 2025 TDMonday 10 March
18.30 AIDA powered up for brief test
 11x 
  480   Mon Jun 13 16:38:37 2022 NHMon 13 JunRemove Caen HV Supply

Open up, C23 was grounded (HV grounded in
  
  652   Tue Jun 11 18:45:37 2024 PPMid-shift checks, 19:45All looks good.

Sceenshots attached.
 8x 
  656   Wed Jun 12 11:06:55 2024 PPMid-shift checks, 12:00All seems normal.

Screenshots attached.
 8x 
  353   Wed Jun 2 14:53:05 2021 OH, TDMerger/Tapeserver issues after reboot of aida-3On 01/06/21 aida-3 was rebooted as the graphical
user interface had frozen.
We were also unable to connected to MIDAS
 6x 
  35   Mon Mar 25 14:44:33 2019 NHMerger issuesPlastic electronics have now been installed.

Water is not leaking still.

FEE64s powered on at 15:00 to test
 Temps.pngAIDARUNv2.pngMergerv2.pngTapev2.pngMergerConsolev2.png 
  559   Wed Apr 3 13:02:19 2024 NHMerger for 16 FEEsChanged /MIDAS/Linux/startup/NewMerger

Change parameters -i and -l in master64 to
 Screenshot_from_2024-04-03_14-15-02.pngScreenshot_from_2024-04-03_14-15-25.pngScreenshot_from_2024-04-03_14-15-36.pngScreenshot_from_2024-04-03_14-15-45.pngScreenshot_from_2024-04-03_14-15-52.png 
  76   Thu Oct 31 16:43:03 2019 NH CA TDMerger & MBS PerformanceTesting merger with 3 DSSDs connected, with
thresholds of 10 (slow comparator), 2 (HEC)
and 255 (fast discriminator)
 MergerStats.pngMBSRates.pngMergernetworking.pngMergerStatistics.png 