AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DESPEC, Page 24 of 37  ELOG logo
ID Date Author Subjectdown Text Attachments
  421   Fri May 6 09:31:41 2022 TD NHFriday 6 May
10:30 DAQ appears to have stopped
 33x 
  355   Fri Jun 4 08:40:52 2021 TDFriday 4 June
09.20 DAQ found stopped
      files in /TapeData/S496 indicate increased
 8x 
  697   Fri Jan 31 17:26:47 2025 CC, TD, MPFriday 31 January contd.
18.18 bPlas and BB7 installs complete 
      Restart AIDA DAQ, Merger, Tape Server
 16x 
  695   Fri Jan 31 09:37:47 2025 CC, TD, MPFriday 31 JanuaryImplantation stack mounted - BB18(DS)-1000
+ bPlas + bPlas + 3x BB7(DS)-1000
 26x 
  288   Fri Apr 30 08:38:12 2021 TDFriday 30 April09.40 All system wide checks OK *except*

FEE64 module aida07 failed
 6x 
  626   Thu May 2 23:08:43 2024 TDFriday 3 May00.05 FEE64 temperatures OK
      ADC data item stats OK
  
  39   Mon Apr 1 10:14:09 2019 CA, NH, TDFriday 29th March 201916:30 good event statistics ok, with 9,10,11,12
running faster (detector FEE64s) (attachment
1)
 290319_stats.png290319_temp.png290913_bias.png 
  350   Fri May 28 10:29:07 2021 TDFriday 28 May11.30 DAQ continues - file S496/R18_472
      alpha background
 9x 
  497   Fri Jun 24 15:04:06 2022 MarcFriday 24th June - evening shift16:05 - Last checked was at 15:30. (see
previous entry. All running smoothly.  

Next wide check will be in about
 11x 
  495   Fri Jun 24 00:34:55 2022 AMFriday 24 June 00:00-08:0001:30    Attachments 1-5,
white rabbit and fpga timestamp failures,
otherwise all good
 20x 
  496   Fri Jun 24 06:56:06 2022 OHFriday 24 June 008:00-16:0007:56 Took over from AM. No issues reported
overnight
      Stats ok - attachment 1
 16x 
  264   Fri Apr 23 07:09:57 2021 LJWFriday 23rd April 08:00-12:0008:30

System Checks

 
 9x 
  263   Thu Apr 22 23:17:46 2021 DJ Friday 23rd April 00:00-08:00Took over from TD ... All is well.

00:45 System Wide Checks

Clock: 12 passed, 0 failed.
 27x 
  268   Fri Apr 23 20:19:52 2021 TDFriday 23 April 20.00-00.00
21.19 system wide checks
 7x 
  266   Fri Apr 23 13:13:46 2021 MA, TDFriday 23 April 12.00-16.00
14.15 System wide checks
 6x 
  549   Fri Mar 22 08:31:39 2024 TDFriday 22 March
09.30 Systems check
 39x 
  342   Fri May 21 15:03:48 2021 CAFriday 21st May 16:00 - 00:00 shift16:00 CA takes over
      DSSD1 n+n sides 0x20 on ASICs 1-3 and
0x64 on ASIC 4
 17x 
  341   Fri May 21 07:03:50 2021 OH, TDFriday 21 May 08:00-16:0008:00 OH and TD take over
      Current settings p+n sides at 0xc
      DSSD1 n+n sides 0x20 on ASICs 1-3 and
 9x 
  130   Fri Feb 21 09:39:38 2020 TD, NHFriday 21 February
Attachment 1 - layout 2 - stat spectra
Attachment 2 - detector biases & leakage
 7x 
  468   Fri May 20 16:22:01 2022 TDFriday 20 May17.20 DAQ stopped

Attachment 1 - DSSSD bias & leakage current
 Screenshot_from_2022-05-20_17-19-21.pngScreenshot_from_2022-05-20_17-19-35.pngScreenshot_from_2022-05-20_17-20-22.png 
ELOG V3.1.3-7933898