496
|
Fri Jun 24 06:56:06 2022 |
OH | Friday 24 June 008:00-16:00 | 07:56 Took over from AM. No issues reported
overnight
Stats ok - attachment 1
|
16x |
|
264
|
Fri Apr 23 07:09:57 2021 |
LJW | Friday 23rd April 08:00-12:00 | 08:30
System Checks
|
9x |
|
263
|
Thu Apr 22 23:17:46 2021 |
DJ | Friday 23rd April 00:00-08:00 | Took over from TD ... All is well.
00:45 System Wide Checks
Clock: 12 passed, 0 failed. |
27x |
|
268
|
Fri Apr 23 20:19:52 2021 |
TD | Friday 23 April 20.00-00.00 |
21.19 system wide checks
|
7x |
|
266
|
Fri Apr 23 13:13:46 2021 |
MA, TD | Friday 23 April 12.00-16.00 |
14.15 System wide checks
|
6x |
|
549
|
Fri Mar 22 08:31:39 2024 |
TD | Friday 22 March |
09.30 Systems check
|
39x |
|
342
|
Fri May 21 15:03:48 2021 |
CA | Friday 21st May 16:00 - 00:00 shift | 16:00 CA takes over
DSSD1 n+n sides 0x20 on ASICs 1-3 and
0x64 on ASIC 4
|
17x |
|
341
|
Fri May 21 07:03:50 2021 |
OH, TD | Friday 21 May 08:00-16:00 | 08:00 OH and TD take over
Current settings p+n sides at 0xc
DSSD1 n+n sides 0x20 on ASICs 1-3 and |
9x |
|
130
|
Fri Feb 21 09:39:38 2020 |
TD, NH | Friday 21 February |
Attachment 1 - layout 2 - stat spectra
Attachment 2 - detector biases & leakage |
7x |
|
468
|
Fri May 20 16:22:01 2022 |
TD | Friday 20 May | 17.20 DAQ stopped
Attachment 1 - DSSSD bias & leakage current
|
  |
|
119
|
Fri Dec 20 12:04:03 2019 |
NH, TD | Friday 20 December 2019 | Fig 1: DSSD Leakage currents ok
Fig 2: FEE Temps ok
|
7x |
|
80
|
Fri Nov 1 10:46:13 2019 |
CA, TD, NH | Friday 1st November 2019 | 11.46 - attachments 1,2,3: bias/leakage currents,
good event statistics and fee temperatures
(respectively)
|
6x |
|
205
|
Fri Mar 19 17:16:45 2021 |
TD | Friday 19 March |
Screenshots of successive displays of Options
for FEE64s aida01, 02, 03 and 04. |
8x |
|
580
|
Fri Apr 19 13:52:34 2024 |
JB, CC, TD | Friday 19 April contd. |
12.00 Replaced AIDA ASIC mezzanine of aida01
to fix issue with asic #3
|
23x |
|
579
|
Fri Apr 19 02:35:14 2024 |
TD | Friday 19 April |
03.30
|
38x |
|
482
|
Sat Jun 18 09:46:57 2022 |
OH, NH | Friday 17th June | Summary of the day:
Small improvements were made throughout the
day but by far the biggest change to the |
23x |
|
229
|
Fri Apr 16 07:19:00 2021 |
OH, MA | Friday 16th April 08:00-16:00 | 08:19 System wide checks all ok
Baselines reset on WR and FPGA checks
for the start of the day
|
14x |
|
319
|
Fri May 14 19:01:09 2021 |
JS | Friday 14th May 20:00-00:00 | 20:00 Taking over from CB
20:33 Doing full checks.
|
27x |
|
317
|
Fri May 14 14:57:32 2021 |
CB + OH, TD, NH | Friday 14th May 16:00-20:00 | 16:00 Shift taken over from CA
16:00
|
33x |
|
316
|
Fri May 14 07:05:08 2021 |
CA | Friday 14th May 08:00 - 16:00 shift | 08:00 CA takes over
08:28 Problem at UNILAC - no beam
|
24x |