AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DESPEC, Page 7 of 36  ELOG logo
Entry  Sun Apr 3 10:56:11 2022, TD, Sunday 3 April 35x

all system wide checks OK *except* aida10 failed ADC calibration
Entry  Mon Apr 4 09:19:49 2022, TD, Monday 4 April 12x
AIDA adaptor PCB config - all LKs removed *except*

aida04 & aida08 LK1
Entry  Tue Apr 5 08:52:16 2022, TD, Tuesday 5 April 6x
DSSSD bias OFF. DAQ STOPped

Attachment 1 FEE64 temps OK
Entry  Tue Apr 5 12:46:52 2022, TD, MSL type BB18(DS)-1000 triple - cable lengths 

OH/NH disassembling current AIDA triple snout and DSSSD stack.
Entry  Sat May 7 09:55:53 2022, TD, Saturday 7 May 15x

Attachments 1 & 2 per FEE64 1.8.L spectra 
 pulser peak widths aida01 121 ch FWHM, aida02 517 ch FWHM
Entry  Sat May 7 13:27:39 2022, TD, AIDA configuration 

Adaptor PCB link settings
Entry  Sun May 8 15:10:45 2022, TD, Sunday 8 May 6x

DSSSD bias and FEE64 power OFF during Ge install
Entry  Thu May 12 07:09:43 2022, TD, Thursday 12 May 08:00-24:00 27x

08.10 AIDA DAQ status
    
Entry  Sat May 14 23:02:33 2022, TD, Sunday 15 May 00:00-08:00 48x

Pb beam c. 1e+9/spill
Entry  Mon May 16 14:07:06 2022, TD, Lost activity monitor Screenshot_from_2022-05-16_15-04-56.png
 
Entry  Mon May 16 17:23:27 2022, TD, NewMerger stats Screenshot_from_2022-05-16_18-17-10.pngScreenshot_from_2022-05-16_18-17-50.pngScreenshot_from_2022-05-16_18-18-24.pngScreenshot_from_2022-05-16_18-20-02.png
 
Entry  Tue May 17 16:53:20 2022, TD, Tuesday 17 May 16.00-00.00 24x

17.35 zero all histograms
      zero statistics
Entry  Wed May 18 15:29:50 2022, TD, Wednesday 18 May 8x
      file no storage mode, no MBS data transfer

      ADC control register 0x0 
Entry  Thu May 19 17:00:46 2022, TD, Thursday 19 May  Screenshot_from_2022-05-19_17-59-41.pngScreenshot_from_2022-05-19_17-58-21.pngScreenshot_from_2022-05-19_17-58-52.pngScreenshot_from_2022-05-19_17-59-20.png

18.01 DAQ stopped
Entry  Fri May 20 16:22:01 2022, TD, Friday 20 May Screenshot_from_2022-05-20_17-19-21.pngScreenshot_from_2022-05-20_17-19-35.pngScreenshot_from_2022-05-20_17-20-22.png
17.20 DAQ stopped

Attachment 1 - DSSSD bias & leakage current
Entry  Sat May 21 15:30:45 2022, TD, Saturday 21 May Screenshot_from_2022-05-21_16-27-58.pngScreenshot_from_2022-05-21_16-28-59.pngScreenshot_from_2022-05-21_16-29-36.png
16.31 DAQ stopped

Attachment 1 - DSSSD bias & leakage current
Entry  Sun May 22 14:12:55 2022, TD, Sunday 22 May Screenshot_from_2022-05-22_15-10-25.pngScreenshot_from_2022-05-22_15-10-48.pngScreenshot_from_2022-05-22_15-11-35.png
15.11 DAQ stopped

Attachment 1 - DSSSD bias & leakage current
Entry  Mon May 23 16:41:45 2022, TD, Monday 23 May Screenshot_from_2022-05-23_17-39-23.pngScreenshot_from_2022-05-23_17-39-58.pngScreenshot_from_2022-05-23_17-40-33.png
17.40 DAQ stopped

Attachment 1 - DSSSD bias & leakage current
Entry  Tue May 31 17:09:35 2022, TD, Tuesday 31 May 20x
2x MSL type BB18(DS)-1000 installed

Entry  Wed Jun 1 07:35:13 2022, TD, Wednesday 1 June 15x

Attachment 1 - DSSSD bias & leakage current - OK
ELOG V3.1.4-unknown