Sat Jun 5 11:20:15 2021, TD, Saturday 5 June 9x
|
12.25 DAQ continues OK - file S496/R32_48
alpha background
|
Sat May 4 07:36:07 2024, TD, Saturday 4 May 11x
|
08.32 DSSSD bias & leakage currents - Grafana - attachments 1-2
FEE64 temperatures OK - attachment 3
|
Sat May 29 13:13:45 2021, TD, Saturday 29 May 9x
|
14.10 DAQ continues - file S496/R18_539
alpha background
|
Sat Jun 25 06:55:07 2022, MS, Saturday 25 June 2022 8:00-16:00 15x
|
Took over the night shift from Tom.
7:00 The beam is back.
8:00 : attachments 1-3 |
Sat Jun 25 17:06:42 2022, BA, AA, Saturday 25 June 2022 16:00-00:00 9x
|
Took over the night shift from Magda
18:00 : attachments 1-3 |
Fri Jun 24 22:36:45 2022, TD, Saturday 25 June 00:00-08:00 31x
|
23:36 Check ASIC contorol
Zero stats & all histograms
|
Sat Apr 24 10:21:06 2021, NH, Saturday 24.04.2021 
|
I have restarted some more of the consoles that disappeared since the aidas-gsi issue last night
Grafana is working again
|
Fri May 21 23:19:23 2021, TD, Saturday 22 May 00:00-08:00 29x
|
00.16 413Gb remaining /TapeData filesystem
estimate 413/2 x 177s = 10.15h to filesystem full - OK
|
Sat May 22 13:40:56 2021, TD, Saturday 22 May 23x
|
14.37 DAQ continues file S496/R15_14
|
Sat May 21 15:30:45 2022, TD, Saturday 21 May  
|
16.31 DAQ stopped
Attachment 1 - DSSSD bias & leakage current
|
Sat Apr 20 17:52:27 2024, TD, NH, Saturday 20 April contd.  
|
Note 40kBq 60Co source placed on bottom surface of snout centred on bPlas detectors and DSSSDs
|
Sat Apr 20 03:20:23 2024, TD, Saturday 20 April 23x
|
Note 60Co source (current activity c. 43kBq) was installed yesterday evening - assume it is positioned on the bottom side of the snout as per the other
sources used this week/
|
Sat Apr 2 10:42:49 2022, TD, Saturday 2 April 21x
|
11.10 Found aida08 not running - merger/TapeServer stalled
Restart required power cycle of all FEE64s
|
Sat Apr 17 11:27:38 2021, JS, TD, Saturday 17th April 12:00-16:00 10x
|
Base Current Difference
aida05 fault 0x1a52 : 0x1a53 : 1
aida06 fault 0x4f3e : 0x4f3f : 1
|
Sat Apr 17 19:39:56 2021, DJ, TD, Saturday 17 April 20.00-00.00 13x
|
19.37 per FEE64 rate spectra - attachments 1 & 2
1.8.L spectra - attachments 3 & 4
|
Sat Apr 17 15:29:27 2021, MS, Saturday 17 April 16:00-20:00 2021 6x
|
16:21
|
Fri Apr 16 23:13:57 2021, CA, MA, BA, Saturday 16th 00:00 - 08:00 14x
|
00:05 DESPEC tuning beam, changing spill length
00:21 DAQ continues ok
|
Sat Jun 15 00:28:01 2024, TD, Saturday 15 June 45x
|
Beam lost due to septum failure c. 18.15 Friday 14 June
Cooling of recirculating water failed c. 19.00 - water temperature increased from the normal 17-18deg C to 25-26 deg C
|
Sat Mar 14 07:13:59 2020, DK, TD, LS, CG, Saturday 14th March 08:00 - 24:00 41x
|
8:15
All system wide checks passed
Leak currents are continuing to creep up - attachment #1
|
Fri Mar 13 23:06:39 2020, CA, OH, Saturday 14th March 00:00 - 08:00 19x
|
ASIC settings 2019Oct31-13.24.23
slow comparator 0xa
|