Wed Jun 19 05:10:15 2019, Alvaro, Aida plastic - gain change
|
Mon Jun 17 19:12:33 2019, Victor, Total SUM in coincidence with AIDA Plastic
|
Mon Jun 17 19:11:06 2019, Victor, TAC slowest module vs fastest module DTAS
|
Mon Jun 17 06:28:06 2019, Victor, MC number of implants
|
Sun Jun 16 23:37:47 2019, Ela, Victor, root file 5:30-7:30
|
Sun Jun 16 23:37:18 2019, Ela, Victor, root file 3:30-5:30
|
Sun Jun 16 22:56:41 2019, Victor, rates modules in coincidence with F11
|
Sun Jun 16 22:02:45 2019, Victor, Sum in coincidence with F11
|
Sun Jun 16 21:44:38 2019, Ela, Victor, root file 3:30-5:30
|
Sun Jun 16 21:43:36 2019, Ela, Victor, root file 1:30-3:30
|
Sun Jun 16 19:18:15 2019, Ela, Victor, root files from run 30 to run 45 6x
|
Sun Jun 16 07:31:01 2019, Victor, The bump in the mutiplicities 8x
|
Sun Jun 16 07:08:10 2019, Ela, Sonja, Victor, Alejandro, problems in coincidence crystals-F11
|
Sun Jun 16 06:55:31 2019, Ela, Sonja, Victor, root file 12:30-14:30
|
Sun Jun 16 04:44:05 2019, Ela, Sonja, Victor, root file 10:30-12:30
|
Sun Jun 16 03:42:17 2019, Ela, Sonja, Victor, root file 8:30-10:30
|
Sun Jun 16 02:07:29 2019, Victor, Total sum (black) and anodes
|
Sun Jun 16 01:36:08 2019, Victor, Mm 100Sn beam
|
Sun Jun 16 00:52:27 2019, Ela, Sonja, Victor, root file 6:30-8:30
|
Sat Jun 15 22:43:20 2019, Pancho & Kike, root file data 4:30 - 6:30
|
Sat Jun 15 20:43:50 2019, Pancho & Kike, root file data 2:30 - 4:30
|
Sat Jun 15 18:39:07 2019, Pancho & Kike, root files
|
Sat Jun 15 18:38:15 2019, Pancho & Kike, run 12
|
Sat Jun 15 18:15:08 2019, Pancho& Kike, run 9 9x
|
Fri Jun 14 16:22:25 2019, AT, OH, JA, CG, TD, AIDA Sync
|
Wed Jun 12 02:04:07 2019, AA, EN, PM, AT, background during in-beam exp.
|
Tue Jun 11 01:45:55 2019, Pancho, Ale, background
|
Mon Jun 10 13:02:16 2019, Jose, Pancho, Ale, background, Aida in 8x
|
Mon Jun 10 12:48:01 2019, Ale, Jose, New Config file 6x
|
Mon Jun 10 12:31:52 2019, Ale, Jose, New calibration
|
Mon Jun 10 10:44:36 2019, Ale, Jose, New Conf file with new calibration
|
Mon Jun 10 10:01:17 2019, Jose, Ale, Co and Cs for new calibration
|
Mon Jun 10 09:58:42 2019, Jose, Ale, Gain matching
|
Mon Jun 10 08:07:17 2019, Ale, Jose, Test of pulser count rates
|
Mon Jun 10 04:18:24 2019, Ale, Jose, New Configuration File
|
Mon Jun 10 04:14:39 2019, Ale, Jose, Background measurement overnight
|
Sun Jun 9 04:03:38 2019, Jorge, Jose, Pancho, Alvaro, Kike, Ale, effect of the pulser in the low energy part of the anodes
|
Sun Jun 9 03:59:40 2019, Many, some cable changes
|
Sat Jun 8 04:38:30 2019, Nacher, Algora, Tain, Molina, source top and bottom
|
Sat Jun 8 04:22:39 2019, Jorge Alvaro, AIDA TAS correlation with 137Cs
|
Fri Jun 7 12:35:14 2019, Jorge, Alvaro, Correlation time AIDA_DTAS for 60Co source
|
Fri Jun 7 09:37:15 2019, The same team, Cs for the AIDA synch test
|
Fri Jun 7 08:47:17 2019, Jorge, Alvaro, Tom, Sunghan, Ale, Co source, test of AIDA/TAS syncronization
|
Fri Jun 7 02:50:40 2019, SN, AA, test of 24Na 7x
|
Fri Jun 7 01:55:24 2019, CA, JA , AT, merger test
|
Thu Jun 6 09:36:52 2019, Alvaro, Jorge, Ale, new config file
|
Tue Jun 4 06:27:55 2019, A. Algora (++Jorge,++ Alvaro), background with no beam
|
Tue Jun 4 06:25:51 2019, A. Algora, Lead shielding was "upgraded"
|
Mon Jun 3 12:59:31 2019, A. Algora, Background, beam on, 102Sn coulex
|
Mon Jun 3 12:56:06 2019, A. Algora, New configuration file
|
Mon Jun 3 03:37:10 2019, A. Algora, Background, beam on
|
Mon Jun 3 01:45:31 2019, A. Algora, Background, no beam for a period
|
Sun Jun 2 12:31:45 2019, A. Algora, Background, beam on
|
Sun Jun 2 11:23:23 2019, A. Algora, Background, beam on
|
Sat Jun 1 14:31:24 2019, A. Algora, Background, beam on
|
Sat Jun 1 10:04:54 2019, A. Algora, background with beam
|
Sat Jun 1 08:25:47 2019, A. Algora, Background, without and with beam 7x
|
Sat Jun 1 07:59:20 2019, A. Algora, Background, no beam
|
Fri May 31 14:29:34 2019, A. Algora, Background with beam
|
Fri May 31 14:17:13 2019, A. Algora, New config file
|
Fri May 31 09:49:08 2019, A. Algora, Backgroun, beam on
|
Fri May 31 07:03:37 2019, A. Algora, Background, beam on, rates at F11PL and AIDAPL
|
Fri May 31 06:48:58 2019, A. Algora, T spectra for AIDA and F11 plastics
|
Fri May 31 02:41:55 2019, A. Algora, Background, beam on 7x
|
Thu May 30 12:08:01 2019, A. Algora, background, dacq restarted before the measurement
|
Thu May 30 08:57:34 2019, A. Algora, Background, no beam + beam, file not saved
|
Thu May 30 08:43:29 2019, A. Algora, Background no beam
|
Thu May 30 07:21:41 2019, A. Algora, Background with beam on
|
Thu May 30 06:46:10 2019, A. Algora, Background with beam
|
Thu May 30 06:41:18 2019, A. Algora, Background with the beam
|
Thu May 30 02:44:56 2019, A. Algora, Background, just a test
|
Thu May 30 02:03:33 2019, A. Algora, Ref detector position changed, AIDA plastik HV changed
|
Wed May 29 10:01:10 2019, A. Algora, Background, no lmd, AIDA in
|
Wed May 29 09:49:25 2019, A. Algora, New configuration file
|
Wed May 29 09:08:11 2019, A. Algora, AIDA plastic setting changed
|
Wed May 29 08:29:26 2019, A. Algora, latest conf file
|
Wed May 29 07:04:19 2019, A. Algora, F11 plastic connected
|
Wed May 29 02:07:20 2019, A. Algora, Irradiation for 24Na
|
Tue May 28 07:49:51 2019, A. Algora, Background, no lmd
|
Tue May 28 06:13:27 2019, A. Algora, Background, Aida in
|
Tue May 28 05:43:41 2019, A. Algora, 133Ba source. (IR052 from the third floor)
|
Tue May 28 05:30:03 2019, A. Algora, Reference detector threshold changed
|
Mon May 27 13:58:03 2019, A. Algora, Background, no lmd, AIDA in, no sources around
|
Mon May 27 13:50:54 2019, A. Algora, preparation directory moved
|
Mon May 27 12:54:48 2019, A. Algora, Reference detector
|
Mon May 27 09:12:22 2019, A. Algora, Background, with AIDA
|
Mon May 27 08:26:20 2019, A. Algora, Co source on top of Aida
|
Mon May 27 07:34:58 2019, A. Algora, HV status
|
Mon May 27 07:18:26 2019, A. Algora, AIDA Plastik
|
Mon May 27 07:15:06 2019, A. Algora, 137Cs run, AIDA out, source in the center
|
Mon May 27 07:11:22 2019, A. Algora, detectors realigned with Cs
|
Sat May 25 07:04:52 2019, A. Algora, Ancilliary card used channels until now
|
Sat May 25 06:53:35 2019, A. Algora, Background, no dlt files, last config file
|
Sat May 25 03:42:12 2019, A. Algora, Background, no sources around, Aida out
|
Sat May 25 02:11:09 2019, A. Algora, 60Co source, red box, no sources around, No AIDA
|
Fri May 24 12:32:48 2019, A. Algora, Background measurement, no sources around
|
Fri May 24 10:57:37 2019, A. Algora, 60Co, AIDA out, possitioned 5 mm deeper
|
Fri May 24 09:43:49 2019, A. Algora, 137Cs source, AIDA out, to check assymetry
|
Fri May 24 08:33:52 2019, A. Algora, background, AIDA is out
|
Fri May 24 07:57:51 2019, A. Algora, Lead shielding heigth increased
|
Fri May 24 06:25:14 2019, A. Algora, Background assymetry
|
Thu May 23 04:18:57 2019, A. Algora, SY2527 fixed
|
Thu May 23 03:06:15 2019, A. Algora, 133Ba source of red box too strong
|
Thu May 23 02:48:29 2019, A. Algora, 137Cs short run with AIDA in
|
Wed May 22 09:44:57 2019, A. Algora, Background with AIDA in
|
Wed May 22 09:01:43 2019, A. Algora, 60Co (source CD 395) with AIDA in
|
Wed May 22 07:55:23 2019, A. Algora, Background with Aida in
|
Wed May 22 07:15:00 2019, A. Algora, 137Cs (4763) with AIDA in
|
Wed May 22 06:31:54 2019, A. Algora, 137Cs quick test of alignment
|
Tue May 21 12:04:10 2019, A. Algora, background without listmode
|
Tue May 21 10:54:24 2019, A. Algora, Background
|
Tue May 21 09:52:43 2019, A. Algora, Background
|
Tue May 21 08:55:20 2019, A. Algora, 152Eu, source ID 272
|
Tue May 21 07:50:03 2019, A. Algora, Background
|
Tue May 21 07:07:36 2019, A. Algora, 22Na, source 700
|
Tue May 21 06:44:18 2019, A. Algora, identified useful sources
|
Tue May 21 06:12:13 2019, A. Algora, Co again, to have a root file, source CD395
|
Tue May 21 03:35:10 2019, A. Algora, Background
|
Tue May 21 02:20:26 2019, A. Algora, Cs measurement, Cs401, 4763
|
Mon May 20 12:29:05 2019, A. Algora, background
|
Mon May 20 10:02:43 2019, A. Algora, 60Co again, with better threshold settings
|
Mon May 20 09:39:23 2019, A. Algora, Dynode 08 threshold changed
|
Mon May 20 08:15:24 2019, A. Algora, background
|
Mon May 20 07:07:59 2019, A. Algora, Co source (CD 395)
|
Mon May 20 06:55:15 2019, A. Algora, New config file after calibration
|
Mon May 20 06:31:53 2019, A. Algora, gain correction
|
Mon May 20 06:04:41 2019, A. Algora, Co and Cs short file
|
Mon May 20 03:18:03 2019, A. Algora, Co and Cs after two days
|
Sat May 18 01:41:45 2019, Nacher, Algora, gain check after the night
|
Thu May 16 06:59:51 2019, Algora Kiss Nacher, Det 3
|
Thu May 16 02:57:15 2019, Nacher, Algora, threshold dynode #13 increased
|
Thu May 16 02:02:24 2019, Algora Kiss Nacher, detector 3 moved over night
|
Wed May 15 11:53:17 2019, Algora, Nacher, Kiss, Background
|
Wed May 15 11:50:04 2019, Algora, Nacher, 137Cs listmode, and rootfile
|
Wed May 15 09:57:54 2019, Nacher, root file with 60Co and 137Cs
|
Wed May 15 08:11:46 2019, Tolosa, Nacher, Algora, Kiss, Energy resolutions
|
Wed May 15 07:48:08 2019, Kiss Algora Nacher, Saturation and pulser
|
Wed May 15 06:53:52 2019, Nacher Kiss Algora, HV setting
|
Wed May 15 06:40:16 2019, Algora, Kiss, Nacher , DTAS aligned and calibrated
|
Wed May 15 04:03:23 2019, JAR, Synchronization with AIDA working
|
Tue May 14 13:16:33 2019, JLT, Hardware setup 11x
|
Tue May 14 09:41:24 2019, TD, Welcome to the DTAS Elog
|
|